  1015   Monday, July 27, 2015, 14:37 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Module moved

TM#4 has been moved from the east target station (morning with SiC#31), and moved to the conditioning station from the south hot cell with UC#13 on it.

  1021   Tuesday, July 28, 2015, 14:31 Travis CaveConditioning StationStandard OperationTM4UC#13Electrical Check

TM#4 with UC#13 electrical check at the conditioning station under vacuum. See attached PDF.

  1025   Wednesday, July 29, 2015, 08:59 Travis CaveITEStandard OperationTM4UC#13Module moved

TM#4 with UC#13 has been moved from the conditioning station to the east target station.

  1027   Thursday, July 30, 2015, 14:05 Travis CaveSpent Target VaultStandard Operation SiC#31Spent target moved

SiC#31 has been moved to the spent target vault. It is in pail #127 and placed in spot 3C of the vault is was 489mSv/hr when removed from the south hot cell. See attached pdf for vault status

  1029   Thursday, August 06, 2015, 10:26 Travis CaveSpent Target VaultStandard Operation  Spent Target Measurments and Assays

All targets but one ( SiC#31 went in last week) have been measured or assayed. See attached PDF for the details.

  1030   Thursday, August 06, 2015, 11:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moved

TM#2 is now in the south hot cell

  1034   Thursday, August 13, 2015, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetElectrical Check

Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed.

  1036   Thursday, August 13, 2015, 14:36 Travis CaveConditioning StationStandard OperationTM2Dummy TargetModule moved

TM#2 with the dummy target has been moved to the conditioning station.

  1042   Thursday, August 20, 2015, 10:15 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetModule moved

TM#2 is now in the south hot cell.

  1043   Thursday, August 20, 2015, 11:00 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical Check

TM#2 electrical check at the conditioning station. All pumps were off but the module was not vented.

  1047   Wednesday, August 26, 2015, 09:20 Travis CaveSouth Hot-CellStandard OperationTM2ZrC #7Electrical Check

Electrical check of TM#2 with ZrC #7 installed

  1050   Wednesday, August 26, 2015, 11:12 Travis CaveConditioning StationStandard OperationTM2ZrC #7Module moved

TM#2 with ZrC#7 has been moved to the conditioning station from the south hot cell.

  1054   Thursday, August 27, 2015, 08:43 Travis CaveConditioning StationStandard OperationTM2ZrC #7Electrical Check

Electrical check of TM#2 at the conditioning station under vacuum. The resistance value of the target to 60kV common is a bit lower then what it was at the south hot cell.

  1057   Tuesday, September 01, 2015, 10:32 Travis CaveITWStandard OperationTM2ZrC #7Module moved

TM#2 with ZrC#7 has been moved from the conditioning station  to the west target station.

  1064   Wednesday, September 09, 2015, 09:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule moved

TM#1 has been moved from the south west silo to the south hot cell.

  1070   Thursday, September 17, 2015, 09:01 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule moved

TM#1 has been moved from the south hot cell to the north east silo.

  1072   Tuesday, September 22, 2015, 11:12 Travis CaveITEStandard OperationTM4UC#13Module moved

TM#4 with UC#13 has been moved from the east target station to the south hot cell.

  1073   Tuesday, September 22, 2015, 11:35 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical Check

TM#4 with UC#13 post beam electrical check. Also and electrical check was done without the target on.

  1074   Tuesday, September 22, 2015, 11:39 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Electrical Check

TM#4 electrical check with Ta#46 attached.

  1076   Wednesday, September 23, 2015, 08:38 Travis CaveConditioning StationStandard OperationTM4Ta#46Module moved

TM#4 with Ta#46 has been moved from the south hot cell to the conditioning station.