ID Date Authordown Category Type Module Target/Number Subject
  975   Thursday, July 02, 2015, 11:51 Travis CaveSpent Target VaultStandard Operation UC#12Spent target moved

UC#12 has been moved from the south hot cell and placed into storage. It is in pail #125 and in spot 1C of the vault it had a reading of 25.1mSv/hr upon removal from the south hot cell. See PDF for vault details.

  976   Friday, July 03, 2015, 09:11 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moved

TM#2 has been moved from the conditioning station to the south hot cell.

  987   Thursday, July 09, 2015, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moved

TM#2 has been moved from the south hot to the north east silo. TM#1 has been moved from the south west silo to the conditioning station.

  993   Monday, July 13, 2015, 11:31 Travis CaveConditioning StationStandard OperationTM1no targetModule moved

TM#1 has been moved back to the south west silo from the conditioning station.

  994   Tuesday, July 14, 2015, 08:42 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moved

TM#2, no target, has been moved from the north east silo to the south hot cell.

  1004   Tuesday, July 21, 2015, 09:21 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check Failed

TM#2 has failed the electrical check see attached pdf for details.

  1008   Wednesday, July 22, 2015, 11:31 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Electrical check done on TM#2 around the 25th of June 2015, this was before the coil line leak was found.

  1012   Friday, July 24, 2015, 14:41 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moved

TM#2 has been moved from the south hot cell to north east silo.

  1013   Monday, July 27, 2015, 12:12 Travis CaveSouth Hot-CellStandard OperationTM4SiC#31Electrical Check

Electrical check of TM#4 post beam with target (SiC#31) on and module without target on. There is a short between the target and EE when the target is on and when the target was removed short went away. See the PDF for details.

  1014   Monday, July 27, 2015, 13:38 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical Check

Electrical check of TM#4 with UC#13 at the south hot cell. See PDF for details.

  1015   Monday, July 27, 2015, 14:37 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Module moved

TM#4 has been moved from the east target station (morning with SiC#31), and moved to the conditioning station from the south hot cell with UC#13 on it.

  1021   Tuesday, July 28, 2015, 14:31 Travis CaveConditioning StationStandard OperationTM4UC#13Electrical Check

TM#4 with UC#13 electrical check at the conditioning station under vacuum. See attached PDF.

  1025   Wednesday, July 29, 2015, 08:59 Travis CaveITEStandard OperationTM4UC#13Module moved

TM#4 with UC#13 has been moved from the conditioning station to the east target station.

  1027   Thursday, July 30, 2015, 14:05 Travis CaveSpent Target VaultStandard Operation SiC#31Spent target moved

SiC#31 has been moved to the spent target vault. It is in pail #127 and placed in spot 3C of the vault is was 489mSv/hr when removed from the south hot cell. See attached pdf for vault status

  1029   Thursday, August 06, 2015, 10:26 Travis CaveSpent Target VaultStandard Operation  Spent Target Measurments and Assays

All targets but one ( SiC#31 went in last week) have been measured or assayed. See attached PDF for the details.

  1030   Thursday, August 06, 2015, 11:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moved

TM#2 is now in the south hot cell

  1034   Thursday, August 13, 2015, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetElectrical Check

Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed.

  1036   Thursday, August 13, 2015, 14:36 Travis CaveConditioning StationStandard OperationTM2Dummy TargetModule moved

TM#2 with the dummy target has been moved to the conditioning station.

  1042   Thursday, August 20, 2015, 10:15 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetModule moved

TM#2 is now in the south hot cell.

  1043   Thursday, August 20, 2015, 11:00 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical Check

TM#2 electrical check at the conditioning station. All pumps were off but the module was not vented.