753
|
Tuesday, September 23, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10, Ta#44 | Electrical check |
Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details. |
Attachment 1: TM4_UC10_postbeam_shc.PDF
|
|
Attachment 2: TM4_Ta44_elecchk_shc.PDF
|
|
|
729
|
Monday, August 11, 2014, 10:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#10 | module move |
TM#4 with UC#10 has been moved from the conditioning station to the east target station. |
|
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check |
Electrical check of TM#4 with UC#10 from thursday. |
Attachment 1: TM4_UC10_elec_chk_shc.PDF
|
|
|
750
|
Tuesday, September 23, 2014, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | module move |
TM#4 with UC#10 has been moved from the east target station to the south hot cell. |
|
757
|
Friday, September 26, 2014, 10:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#10 | Spent target move |
UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF. |
Attachment 1: Vault_Storage_September_26_2014.pdf
|
|
|
2009
|
Tuesday, October 22, 2019, 11:19 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UC# 28 | TM4 Move |
TM4 with UC# 28 target has been moved from ITW to the South Hot Cell. Shield plug installed in ITW. |
|
154
|
Tuesday, July 31, 2012, 12:50 |
David Wang | South Hot-Cell | Standard Operation | TM1 | UC x | TM1 heat shield circuit leak check with UC x target |
Chad and i did a leak check on TM1heat shield with UCx target on.The circuit are pumped down to the bottom leak rate and base pressure is 3xE-3 torr on the leak detector. There are two VCR caps on heat shield circuit. Chad sprayed helium on both of them ( tested individually,2 seconds every time ) . The test repeated 1 time.There is no response on leak detector during 45 seconds waiting time on both time.Chad flushed helium around the target for 15 second. During 1 minutes waiting time , there is no response on leak detector.The heat shield circuit is leak tight at this stage. It will be helium pressure in CS later. |
|
2724
|
Thursday, November 28, 2024, 16:13 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 Parasitics | TiC#9 Parasitics Leak Check and removal from hotcell |
November 27th, 2024 - Aaron Tam with Farran & David
Parasitic Assembly Leak Check (Aaron, Farran, David)
-Note that the furthest upstream (right of the target) parasitic top cap screws had been loosened and retightened in error when attempting to remove it off TiC#9
-This puts this data point into question
-Leak check starting from upstream to down stream
-First parasitic had no leak
-Second parasitic had some leak
-Third parasitic was not pumping down at all
-First parasitic checked on test hose again with same success
Parasitic Dis-assembly (Aaron)
-First parasitic had good tension in all 3 screws
-second parasitic had 2 screws with a perceptible breaking-loose of the screws, but one was imperceptible
-Third parasitic had lower (than first parasitic), but okay tension in all 3 screws
In an attempt to move the PEEK seal into a safe spot with tweezers, this one was accidentally sprung across the hotcell in the direction of the tool port
A lengthy attempt to find it was conducted, but no PEEK seal was recovered
This may effect our ability to do work during hot cell entries coming up.
PEEK Seal extraction (Aaron, Farran)
-A labeled bag was inserted into the hotcell via the tool port and onto an existing tray in the Hotcell
-PEEK seal placed inside bag, placed back on tray, and moved back to the tool port for extraction
-With tool port open, the draft was able to push the bag across the lift table. Changing the cross section exposed to the draft works to keep the bag from moving
-Farran used picker to extract the bag into the tool port where he wiped and placed into separate bag.
-This process was repeated for the second PEEK seal
-Bags were wiped and swiped, put in another bag, swiped and brought over to Hot cell Service area Lab
|
Attachment 1: Leak_Test.jpg
|
|
Attachment 2: Dissassembly.jpg
|
|
Attachment 3: Seal_Seat.jpg
|
|
Attachment 4: PEEK_seal.jpg
|
|
Attachment 5: PEEK_Seal_Closer_look.jpg
|
|
|
2677
|
Tuesday, September 10, 2024, 12:41 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | TiC#9 | electrical check/leak check |
TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls. |
Attachment 1: TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
|
|
|
2684
|
Tuesday, September 17, 2024, 13:42 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | Module Connection |
TM4 with target TiC#9 is connected in ITW. See attachment. |
Attachment 1: TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
|
|
|
2710
|
Tuesday, November 05, 2024, 09:49 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | module disconnection |
TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC. |
Attachment 1: TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
|
|
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target |
David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls. |
Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf
|
|
|
2676
|
Tuesday, September 10, 2024, 12:41 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target TiC#9 HP-SIS installed onto TM4 |
September 9, 2024 - Aaron Tam
- Water from waterline found puddled on source-tray and containment box.
- Water was wiped up as much as possible, but likely still in containment box
- leaving to dry overnight
- Target inserted into Hotcell with nuts for the parasitic target. 4/4 socket nuts installed on upstream flange, and 3/4 installed on downstream flange
September 10, 2024 - Aaron Tam
- TiC#9 HP-SIS installed onto TM4
- Leak check passed after retightening VCR joint
- Target Electrode Conductor screws torqued to 130 inch-lbs
- Electrical test passed
- Containment box cover reinstalled
Photos attached |
Attachment 1: 089c5872-091d-484b-9b9c-dda8444b217b.jfif
|
Attachment 2: 566cae27-5562-4934-b23a-5c99af810900.jfif
|
Attachment 3: cc853ae8-5896-46f3-9f21-f6ede8c82626.jfif
|
Attachment 4: ffdf443c-2656-499a-9d0a-01ddef2f954a.jfif
|
|
2678
|
Wednesday, September 11, 2024, 07:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#9 | TM4 has been moved from SHC to TCS. |
TM4 has been moved from SHC to TCS. The move is smooth. |
|
2683
|
Tuesday, September 17, 2024, 11:16 |
David Wang | ITW | Standard Operation | TM4 | TiC#9 | TM4 has been moved from TCS to ITW. |
TM4 has been moved from TCS to ITW. The move is smooth. |
|
2703
|
Thursday, October 10, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 PIE |
Post Irradiation Examination
October 9, 2024 - Aaron Tam
Goal: Training (First PIE by Aaron), Characterize any anomalies
Notes:
- Overall the target looks exceedingly clean with only some discolouration on the copper behind the target tube, and multipin cable insulation.
Target loosely reassembled
Awaiting pail loading, and move to vault |
Attachment 1: c04ead1c-fd4e-4416-9999-f6af1950d50f.jfif
|
Attachment 2: ca843d0f-1927-4b57-852c-4937259d8a58.jfif
|
Attachment 3: a9c1b163-cea6-432f-bdbd-c7e5b92d60c0.jfif
|
Attachment 4: 4be2ae79-3fd9-4138-a1ca-624fbe071a78.jfif
|
Attachment 5: 01c73c16-2482-415a-8a12-a0752f844fd3.jfif
|
Attachment 6: f9611dd8-f8b0-410a-86fa-2d3ab4f50e41.jfif
|
Attachment 7: 4ebc456a-1839-4b92-b73b-7cc1fcb1cc71.jfif
|
Attachment 8: 14008918-9bf3-4626-8f77-c0107d01e168.jfif
|
Attachment 9: 79be1e68-ac54-4841-b0c2-eb917b18574b.jfif
|
Attachment 10: 1393f383-bdaf-4867-bf74-8ba88eb5dbc3.jfif
|
Attachment 11: 6128aba4-6c03-4806-8013-5ed1500f97f5.jfif
|
Attachment 12: 8c83a044-6369-4eea-bcb3-286320fb771b.jfif
|
Attachment 13: 04558649-7f45-49df-bbd1-a6655033d34f.jfif
|
Attachment 14: 99e656c9-c211-4a78-b3fd-7fb4775e90d7.jfif
|
Attachment 15: fd624472-762f-48e2-8951-dff22f4108c1.jfif
|
Attachment 16: d2115c29-874c-4dd7-a52e-85ff8423df42.jfif
|
Attachment 17: 9310b964-4db3-4f76-a651-38097c722875.jfif
|
Attachment 18: 2917fee7-b2db-4575-84b5-b227c895d0f1.jfif
|
Attachment 19: 55c34370-3ac2-4679-beff-21a36f2a378c.jfif
|
Attachment 20: 8591d4e7-269f-4641-af7e-afe07915cae6.jfif
|
Attachment 21: df475908-8b36-4a5d-916e-9ce608d34acc.jfif
|
Attachment 22: 95ce159e-480a-4231-83f6-1e8270c0cbdc.jfif
|
Attachment 23: 7e22b28a-30b4-42e2-8568-c80d5cfb209e.jfif
|
Attachment 24: d47b48ca-320e-43a5-a41c-20af82a38ebd.jfif
|
Attachment 25: c3eef85f-ee87-47a1-a230-609d5dd9764d.jfif
|
Attachment 26: d7769940-f939-4686-af3c-21fc49ced03f.jfif
|
Attachment 27: 2899fd3f-93f4-4a33-8d08-9b9bea6e2ca9.jfif
|
Attachment 28: 1abe798c-1058-4b80-b4b2-9dae1e94799e.jfif
|
Attachment 29: 1f780424-0776-400d-b11a-a0e1b3e4c862.jfif
|
Attachment 30: a983a1bb-5223-4757-88b2-9fb6ae46b5cc.jfif
|
Attachment 31: fdfa8fec-f1d8-4c29-8df5-03d9c2ac10f6.jfif
|
Attachment 32: 4cb53268-4ce1-48ab-ab71-7d9d4d908229.jfif
|
|
2712
|
Wednesday, November 06, 2024, 08:29 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target and Parasitic assemblies removal from TiC#9 |
November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
- Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif & Bolt_Tops.jfif)
- Location and orientation of darker bolt (Darker_bolt.jfif)
Parasitic Targets Removed
- Left target has residue left from ablation
See photos attached for detail |
Attachment 1: Target_first_look.jfif
|
Attachment 2: Target_first_look_ETTR.jfif
|
Attachment 3: Inside_Panel.jfif
|
Attachment 4: Darker_bolt.jfif
|
Attachment 5: VCR_and_conductor_bolts_removed.jfif
|
Attachment 6: Top.jfif
|
Attachment 7: target_left.jfif
|
Attachment 8: Right.jfif
|
Attachment 9: Bottom.jfif
|
Attachment 10: Parasitic_Target_right.jfif
|
Attachment 11: Parasitic_Target_right_(2).jfif
|
Attachment 12: Left_side_without_parasitic.jfif
|
Attachment 13: Back_of_target_left.jfif
|
Attachment 14: Back_of_target_right.jfif
|
Attachment 15: Extraction_electrode.jfif
|
Attachment 16: Bolt_profile.jfif
|
Attachment 17: Bolt_Tops.jfif
|
|
2714
|
Friday, November 08, 2024, 10:39 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#9 | Spent Target Move |
TiC#9 was placed in Pail 299 in spot 8A of the vault and was 92.1mSv/hr when removed from the south hot cell. See attached pdf for full vault details. |
Attachment 1: Target_Index_2024-11-08.pdf
|
|
|
2716
|
Friday, November 08, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 Pail Loading into Pail#299 |
Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting to remove multipin connector bracket
Assistance from Chad required for the rest of procedure
Tic#9 was loaded into Pail#299
- Along with fixing and conductor bolts (no other material was loaded)
|
|
2653
|
Friday, August 09, 2024, 19:01 |
David Wang | ITW | Standard Operation | TM3 | TiC#8. | TM3 has been connected in ITW. |
TM3 has been connected in ITW. See attachment for checklist. |
Attachment 1: TM3_TiC#8_connection_in_ITW_checklist.pdf
|
|