887
|
Friday, April 17, 2015, 09:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | No target | Module move |
TM#1 with no target has been moved from the south west silo to the south hot cell for the installation of the UCx target. |
888
|
Friday, April 17, 2015, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#12 | Electrical check |
Electrical check of TM#1 with UCx#12 attached. See attached PDF for details. |
Attachment 1: TM1_UC#12_tgt_elec_chk_SHC.PDF
|
|
889
|
Friday, April 17, 2015, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#12 | Module move |
TM#1 with UCx#12 has been moved from the south hot cell to the conditioning station. |
904
|
Tuesday, April 28, 2015, 11:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module move |
TM#1 with UC#12 has been moved from the conditioning station to the west target station. |
906
|
Thursday, April 30, 2015, 08:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move |
TM#2 with no source tray has been moved from the north east silo to the south hot cell. |
911
|
Wednesday, May 06, 2015, 14:30 |
Travis Cave | South Hot-Cell | Repair | TM2 | No target | Wiring of TM#2 |
Wires for TM#2 steering elements, and png gauge have been run down to the containment box level. Chad has placed them in the little cable trays. Slack has been pulled back. and termination of the wire will be done on the 7th of May. A modification was done to the signal line of the png gauge wire ultem block, as grounded screw was inserted to allow for strain relief so the end would hopefully quit breaking. See attached pictures for the details. |
Attachment 1: Photo_2015-05-06_8_26_10_AM.JPG
|
|
Attachment 2: Photo_2015-05-06_8_26_17_AM.JPG
|
|
912
|
Thursday, May 07, 2015, 11:02 |
Travis Cave | South Hot-Cell | Repair | TM2 | No target | Wiring of TM#2 |
Wires in TM#2 have been terminated at the top of the module. |
919
|
Wednesday, May 27, 2015, 08:57 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | | Module moved |
TM#2 with no source tray has been moved from the south hot cell to the conditioning station. |
920
|
Friday, May 29, 2015, 09:16 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module moved |
TM#2 with no source tray has been moved from the conditioning station to the north east silo. |
921
|
Monday, June 01, 2015, 11:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module moved |
TM#4 with Ta#45 has been moved from the east target station to the south hot cell. |
922
|
Monday, June 01, 2015, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical Check |
Post beam electrical check on the Ta#45 target installed on TM#4. See attached PDF. |
Attachment 1: TM4_Ta45_elecchk_postbeam.PDF
|
|
925
|
Tuesday, June 02, 2015, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#31 | Electrical Check |
Electrical check on TM#4 with SiC#31. See attached PDF for details. |
Attachment 1: TM4_SiC31_elecchk_SHC.PDF
|
|
926
|
Tuesday, June 02, 2015, 11:54 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#31 | Module moved |
TM#4 with SiC#31 has been moved from the south hot cell to the conditioning station. |
938
|
Wednesday, June 10, 2015, 10:02 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#31 | Module moved |
TM#4 has been moved from the conditioning station to the east target station. |
946
|
Monday, June 15, 2015, 09:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2 is now in the south hot cell. |
969
|
Tuesday, June 30, 2015, 11:27 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module moved |
TM#1 with UC#12 has been moved from the west station to the south hot cell. |
974
|
Thursday, July 02, 2015, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved |
TM#1 has been moved from the south hot cell to the south west silo. |
975
|
Thursday, July 02, 2015, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#12 | Spent target moved |
UC#12 has been moved from the south hot cell and placed into storage. It is in pail #125 and in spot 1C of the vault it had a reading of 25.1mSv/hr upon removal from the south hot cell. See PDF for vault details. |
Attachment 1: Vault_Storage_July_2_2015.pdf
|
|
976
|
Friday, July 03, 2015, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2 has been moved from the conditioning station to the south hot cell. |
987
|
Thursday, July 09, 2015, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2 has been moved from the south hot to the north east silo. TM#1 has been moved from the south west silo to the conditioning station. |