753
|
Tuesday, September 23, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10, Ta#44 | Electrical check | Electrical checks of TM#4 with UC#10 post
beam and Ta#44 before beam see attached PDF
for details. |
|
729
|
Monday, August 11, 2014, 10:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#10 | module move | TM#4 with UC#10 has been moved from the
conditioning station to the east target station. |
|
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check | Electrical check of TM#4 with UC#10 from
thursday. |
|
750
|
Tuesday, September 23, 2014, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | module move | TM#4 with UC#10 has been moved from the
east target station to the south hot cell. |
|
757
|
Friday, September 26, 2014, 10:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#10 | Spent target move | UC#10 has been moved from the south hot
cell to the spent target vault. It was placed
in Pail #119 and in slot 8B. For further |
|
2009
|
Tuesday, October 22, 2019, 11:19 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UC# 28 | TM4 Move | TM4 with UC# 28 target has been moved from
ITW to the South Hot Cell. Shield plug installed
in ITW. |
|
154
|
Tuesday, July 31, 2012, 12:50 |
David Wang | South Hot-Cell | Standard Operation | TM1 | UC x | TM1 heat shield circuit leak check with UC x target | Chad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped down to the bottom leak rate |
|
2724
|
Thursday, November 28, 2024, 16:13 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 Parasitics | TiC#9 Parasitics Leak Check and removal from hotcell | November 27th, 2024 - Aaron Tam with
Farran & David
Parasitic Assembly Leak Check (Aaron, |
|
2677
|
Tuesday, September 10, 2024, 12:41 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | TiC#9 | electrical check/leak check | TM4 with new target TiC#9 Surface
installed in SHC was leak/electric checked
before moving to TCS. See attached pic pls. |
|
2684
|
Tuesday, September 17, 2024, 13:42 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | Module Connection | TM4 with target TiC#9 is connected
in ITW. See attachment. |
|
2710
|
Tuesday, November 05, 2024, 09:49 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | module disconnection | TM4 with spent target TiC#9 was disconnected
in 29-10-2024 and it is being moved from
ITW to SHC. |
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target | David made electrical check right
after TM4 is moved from ITW to SHC. see attachment
pls. |
|
2676
|
Tuesday, September 10, 2024, 12:41 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target TiC#9 HP-SIS installed onto TM4 | September 9, 2024 - Aaron Tam
Water from waterline found
puddled on source-tray and containment box.
|
|
2678
|
Wednesday, September 11, 2024, 07:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#9 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is smooth. |
|
2683
|
Tuesday, September 17, 2024, 11:16 |
David Wang | ITW | Standard Operation | TM4 | TiC#9 | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW. The
move is smooth. |
|
2703
|
Thursday, October 10, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 PIE | Post Irradiation Examination
|
32x |
2712
|
Wednesday, November 06, 2024, 08:29 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target and Parasitic assemblies removal from TiC#9 | November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
Top left fixing bolt shows |
17x |
2714
|
Friday, November 08, 2024, 10:39 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#9 | Spent Target Move | TiC#9 was placed in Pail 299 in spot
8A of the vault and was 92.1mSv/hr when removed
from the south hot cell. See attached pdf |
|
2716
|
Friday, November 08, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 Pail Loading into Pail#299 | Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting
to remove multipin connector bracket |
|
2653
|
Friday, August 09, 2024, 19:01 |
David Wang | ITW | Standard Operation | TM3 | TiC#8. | TM3 has been connected in ITW. | TM3 has been connected in ITW. See attachment
for checklist. |
|