Entry  Tuesday, September 23, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#10, Ta#44, Electrical check TM4_UC10_postbeam_shc.PDFTM4_Ta44_elecchk_shc.PDF

Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details.

Entry  Wednesday, September 24, 2014, 10:41, Travis Cave, ITE, Standard Operation, TM4, Ta#44, module move 

TM#4 with Ta#44 has been moved from the south hot cell to the east target station.

Entry  Friday, September 26, 2014, 10:56, Travis Cave, Spent Target Vault, Standard Operation, , UC#10, Spent target move Vault_Storage_September_26_2014.pdf

UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF.

Entry  Wednesday, October 08, 2014, 09:39, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 

TM#3 has been moved from the North West Silo to the conditioning station.

Entry  Tuesday, October 14, 2014, 11:51, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, module move 

TM#1 with ZrC#6 has been moved from ITW to the south hot cell.

Entry  Tuesday, October 14, 2014, 11:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check TM1_ZrC6_postbeam.PDF

TM#1 with ZrC#6 post beam electrical check see attached pdf for results.

Entry  Tuesday, October 14, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Electrical check TM1_elec_check_no_target.PDF

Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details.

Entry  Wednesday, October 15, 2014, 12:55, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 

TM#1 with no target has been moved from the south hot cell to the south west silo.

Entry  Tuesday, October 21, 2014, 14:53, Travis Cave, Spent Target Vault, Standard Operation, , ZrC#6, Spent target move Vault_Storage_October_21_2014.pdf

ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF.

Entry  Monday, November 03, 2014, 10:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 

TM#1 has been moved from the south west silo to the south hot cell.

Entry  Monday, November 03, 2014, 13:47, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, Electrical check TM1_elec_check_ThO1_SHC.PDF

TM#1 with ThO#1 electrical check see attatched PDF for details.

Entry  Wednesday, November 05, 2014, 10:20, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, module move 

TM#1 with ThO#1 has been moved from the south hot cell to the west target station.

Entry  Monday, November 17, 2014, 11:38, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 

TM#3 with no target has been moved from the conditioning station to the north west silo.

Entry  Tuesday, November 18, 2014, 10:28, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#44, module move 

TM#4 with Ta#44 has been moved from the east target station to the south hot cell.

Entry  Wednesday, November 19, 2014, 09:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#11, Electrical check TM4_elec_check_UC11_SHC.PDF

TM#4 with UC#11 electrical check done. See attached PDF for the results.

Entry  Thursday, November 20, 2014, 11:49, Travis Cave, ITE, Standard Operation, TM4, UC#11, module move 

TM#4 with UCx#11has been moved from the conditioning station to the east target station.

Entry  Friday, November 21, 2014, 10:40, Travis Cave, Spent Target Vault, Standard Operation, , Ta#44, Spent target move Vault_Storage_November_21_2014.pdf

The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr upon removal from the south hot cell.

Entry  Wednesday, November 26, 2014, 11:11, Travis Cave, Spent Target Vault, Standard Operation, , Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29, Spent targets moved to mini storage 

The following targets have been moved to the mini storage from the target storage vault:

  1. Ta#38
  2. Nb#7
  3. TiC#3
  4. SiC#29
  5. NiO#2

These target will be removed from the mini storage and placed into the F-308's on December 3rd.

Entry  Friday, November 28, 2014, 13:06, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move 

TM#2 with no target or source tray has been moved from the north east silo to the south hot cell.

Entry  Monday, December 01, 2014, 14:48, Travis Cave, Spent Target Vault, Standard Operation, , , F-308s moved 

The F-308s have been moved into the target hall,  for filling on wednesday.