Wednesday, September 03, 2014, 13:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check
|
TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal. |
Thursday, September 04, 2014, 09:45, Travis Cave, Conditioning Station, Standard Operation, TM1, ZrC#6, module move
|
TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station. |
Friday, September 05, 2014, 13:07, Travis Cave, Spent Target Vault, Standard Operation, , Ta#43, Spent target move
|
Ta#43 has been moved from the south hot cell to the spent target vault. See attached PDF for details. |
Wednesday, September 10, 2014, 08:52, Travis Cave, ITW, Standard Operation, TM1, ZrC#6, module move
|
TM#1 with ZrC#6 has been moved from the conditioning station to west target station. |
Friday, September 12, 2014, 14:21, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target field measurements
|
Five of the ten target we want to measure the fields on were done today. We will finish up on Monday, and the spent target storage spreadsheet will be updated then. |
Monday, September 15, 2014, 11:23, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target field measurements
|
Field measurements on the spent target has finished see the attached PDF for details. |
Tuesday, September 23, 2014, 10:50, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#10, module move
|
TM#4 with UC#10 has been moved from the east target station to the south hot cell. |
Tuesday, September 23, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#10, Ta#44, Electrical check 
|
Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details. |
Wednesday, September 24, 2014, 10:41, Travis Cave, ITE, Standard Operation, TM4, Ta#44, module move
|
TM#4 with Ta#44 has been moved from the south hot cell to the east target station. |
Friday, September 26, 2014, 10:56, Travis Cave, Spent Target Vault, Standard Operation, , UC#10, Spent target move
|
UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF. |
Wednesday, October 08, 2014, 09:39, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move
|
TM#3 has been moved from the North West Silo to the conditioning station. |
Tuesday, October 14, 2014, 11:51, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, module move
|
TM#1 with ZrC#6 has been moved from ITW to the south hot cell. |
Tuesday, October 14, 2014, 11:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check
|
TM#1 with ZrC#6 post beam electrical check see attached pdf for results. |
Tuesday, October 14, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Electrical check
|
Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details. |
Wednesday, October 15, 2014, 12:55, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 with no target has been moved from the south hot cell to the south west silo. |
Tuesday, October 21, 2014, 14:53, Travis Cave, Spent Target Vault, Standard Operation, , ZrC#6, Spent target move
|
ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF. |
Monday, November 03, 2014, 10:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 has been moved from the south west silo to the south hot cell. |
Monday, November 03, 2014, 13:47, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, Electrical check
|
TM#1 with ThO#1 electrical check see attatched PDF for details. |
Wednesday, November 05, 2014, 10:20, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, module move
|
TM#1 with ThO#1 has been moved from the south hot cell to the west target station. |
Monday, November 17, 2014, 11:38, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move
|
TM#3 with no target has been moved from the conditioning station to the north west silo. |
|