753
|
Tuesday, September 23, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10, Ta#44 | Electrical check |
Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details. |
Attachment 1: TM4_UC10_postbeam_shc.PDF
|
|
Attachment 2: TM4_Ta44_elecchk_shc.PDF
|
|
754
|
Wednesday, September 24, 2014, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#44 | module move |
TM#4 with Ta#44 has been moved from the south hot cell to the east target station. |
757
|
Friday, September 26, 2014, 10:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#10 | Spent target move |
UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF. |
Attachment 1: Vault_Storage_September_26_2014.pdf
|
|
758
|
Wednesday, October 08, 2014, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move |
TM#3 has been moved from the North West Silo to the conditioning station. |
760
|
Tuesday, October 14, 2014, 11:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | module move |
TM#1 with ZrC#6 has been moved from ITW to the south hot cell. |
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check |
TM#1 with ZrC#6 post beam electrical check see attached pdf for results. |
Attachment 1: TM1_ZrC6_postbeam.PDF
|
|
763
|
Tuesday, October 14, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check |
Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details. |
Attachment 1: TM1_elec_check_no_target.PDF
|
|
765
|
Wednesday, October 15, 2014, 12:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 with no target has been moved from the south hot cell to the south west silo. |
772
|
Tuesday, October 21, 2014, 14:53 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC#6 | Spent target move |
ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF. |
Attachment 1: Vault_Storage_October_21_2014.pdf
|
|
775
|
Monday, November 03, 2014, 10:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 has been moved from the south west silo to the south hot cell. |
777
|
Monday, November 03, 2014, 13:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Electrical check |
TM#1 with ThO#1 electrical check see attatched PDF for details. |
Attachment 1: TM1_elec_check_ThO1_SHC.PDF
|
|
780
|
Wednesday, November 05, 2014, 10:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | module move |
TM#1 with ThO#1 has been moved from the south hot cell to the west target station. |
788
|
Monday, November 17, 2014, 11:38 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved from the conditioning station to the north west silo. |
790
|
Tuesday, November 18, 2014, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#44 | module move |
TM#4 with Ta#44 has been moved from the east target station to the south hot cell. |
794
|
Wednesday, November 19, 2014, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#11 | Electrical check |
TM#4 with UC#11 electrical check done. See attached PDF for the results. |
Attachment 1: TM4_elec_check_UC11_SHC.PDF
|
|
796
|
Thursday, November 20, 2014, 11:49 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | module move |
TM#4 with UCx#11has been moved from the conditioning station to the east target station. |
799
|
Friday, November 21, 2014, 10:40 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#44 | Spent target move |
The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_November_21_2014.pdf
|
|
802
|
Wednesday, November 26, 2014, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29 | Spent targets moved to mini storage |
The following targets have been moved to the mini storage from the target storage vault:
- Ta#38
- Nb#7
- TiC#3
- SiC#29
- NiO#2
These target will be removed from the mini storage and placed into the F-308's on December 3rd. |
803
|
Friday, November 28, 2014, 13:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move |
TM#2 with no target or source tray has been moved from the north east silo to the south hot cell. |
806
|
Monday, December 01, 2014, 14:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | F-308s moved |
The F-308s have been moved into the target hall, for filling on wednesday. |