Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 29 of 140  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  737   Wednesday, September 03, 2014, 13:56 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical check

TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal.

Attachment 1: TM1_ZrC6_elec_chk_shc.PDF
TM1_ZrC6_elec_chk_shc.PDF
  738   Thursday, September 04, 2014, 09:45 Travis CaveConditioning StationStandard OperationTM1ZrC#6module move

TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station.

  742   Friday, September 05, 2014, 13:07 Travis CaveSpent Target VaultStandard Operation Ta#43Spent target move

Ta#43 has been moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_September_5_2014.pdf
Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf
  745   Wednesday, September 10, 2014, 08:52 Travis CaveITWStandard OperationTM1ZrC#6module move

TM#1 with ZrC#6 has been moved from the conditioning station to west target station.

  747   Friday, September 12, 2014, 14:21 Travis CaveSpent Target VaultStandard Operation  Spent target field measurements

Five of the ten target we want to measure the fields on were done today. We will finish up on Monday, and the spent target storage spreadsheet will be updated then.

  748   Monday, September 15, 2014, 11:23 Travis CaveSpent Target VaultStandard Operation  Spent target field measurements

Field measurements on the spent target has finished see the attached PDF for details.

Attachment 1: Vault_Storage_September_15_2014.pdf
Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf
  750   Tuesday, September 23, 2014, 10:50 Travis CaveSouth Hot-CellStandard OperationTM4UC#10module move

TM#4 with UC#10 has been moved from the east target station to the south hot cell.

  753   Tuesday, September 23, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM4UC#10, Ta#44Electrical check

Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details.

Attachment 1: TM4_UC10_postbeam_shc.PDF
TM4_UC10_postbeam_shc.PDF
Attachment 2: TM4_Ta44_elecchk_shc.PDF
TM4_Ta44_elecchk_shc.PDF
  754   Wednesday, September 24, 2014, 10:41 Travis CaveITEStandard OperationTM4Ta#44module move

TM#4 with Ta#44 has been moved from the south hot cell to the east target station.

  757   Friday, September 26, 2014, 10:56 Travis CaveSpent Target VaultStandard Operation UC#10Spent target move

UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF.

Attachment 1: Vault_Storage_September_26_2014.pdf
Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf
  758   Wednesday, October 08, 2014, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 has been moved from the North West Silo to the conditioning station.

  760   Tuesday, October 14, 2014, 11:51 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6module move

TM#1 with ZrC#6 has been moved from ITW to the south hot cell.

  761   Tuesday, October 14, 2014, 11:52 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical check

TM#1 with ZrC#6 post beam electrical check see attached pdf for results.

Attachment 1: TM1_ZrC6_postbeam.PDF
TM1_ZrC6_postbeam.PDF
  763   Tuesday, October 14, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical check

Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details.

Attachment 1: TM1_elec_check_no_target.PDF
TM1_elec_check_no_target.PDF
  765   Wednesday, October 15, 2014, 12:55 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule move

TM#1 with no target has been moved from the south hot cell to the south west silo.

  772   Tuesday, October 21, 2014, 14:53 Travis CaveSpent Target VaultStandard Operation ZrC#6Spent target move

ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF.

Attachment 1: Vault_Storage_October_21_2014.pdf
Vault_Storage_October_21_2014.pdf Vault_Storage_October_21_2014.pdf Vault_Storage_October_21_2014.pdf Vault_Storage_October_21_2014.pdf
  775   Monday, November 03, 2014, 10:27 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule move

TM#1 has been moved from the south west silo to the south hot cell.

  777   Monday, November 03, 2014, 13:47 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Electrical check

TM#1 with ThO#1 electrical check see attatched PDF for details.

Attachment 1: TM1_elec_check_ThO1_SHC.PDF
TM1_elec_check_ThO1_SHC.PDF
  780   Wednesday, November 05, 2014, 10:20 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1module move

TM#1 with ThO#1 has been moved from the south hot cell to the west target station.

  788   Monday, November 17, 2014, 11:38 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 with no target has been moved from the conditioning station to the north west silo.

ELOG V2.9.2-2455