Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 27 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  654   Monday, May 05, 2014, 10:40 Travis CaveITEStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
east station to the south west silo.
  
  657   Tuesday, May 06, 2014, 14:05 Travis CaveITEStandard Operation  module moveThe entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules
  
  662   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assayAll targets in the vault have been assayed
and measured. Results will be posted soon.
  
  663   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assayAll targets in the vault have been assayed
and measured. Results will be posted soon.
 Vault_Storage_May_22_2014.pdf 
  666   Tuesday, May 27, 2014, 10:42 Travis CaveITWStandard OperationTM4Ta#42module moveTM#4 with Ta#42 has been moved from 
the west target station to the south hot
cell.
  
  667   Tuesday, May 27, 2014, 11:45 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical checkTM#4 electrical check with Ta#42 attached
post beam at the south hot cell.
 TM4_Ta42_elec_chk_SHC_postbeam.PDF 
  668   Wednesday, May 28, 2014, 08:48 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the south hot cell to the south west silo.
  
  669   Friday, May 30, 2014, 09:41 Travis CaveSpent Target VaultStandard Operation Ta#42Spent target moveTa#42 in pail #114 has been moved from
the south hot cell to the spent target storage
vault and place in spot 7B. The target was
 Vault_Storage_May_30_2014.pdf 
  670   Monday, June 02, 2014, 10:52 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 with no target has been moved from
the north west silo to the south hot cell.
  
  672   Monday, June 02, 2014, 11:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical checkTM#1 with UC#9 electrical check see attached
pdf for details.
 TM1_UC9_elec_chk_SHC.PDF 
  674   Monday, June 02, 2014, 13:53 Travis CaveConditioning StationStandard OperationTM1UC#9module moveTM#1 with UC#9 has been moved from the
south hot cell to the conditioning station.
  
  679   Tuesday, June 10, 2014, 13:20 Travis CaveITWStandard OperationTM1UC#9module moveTM#1 with UC#9 moved from the conditioning
station to west station.
  
  681   Thursday, June 12, 2014, 09:42 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308sFive targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28,
 Vault_Storage_June_12_2014.pdfMini_Vault_Storage_June_12_2014.pdf 
  684   Tuesday, June 24, 2014, 11:12 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module moveTM#4 with TiC#4 has been moved from the
east target station to the south hot cell.
  
  686   Tuesday, June 24, 2014, 11:58 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical checkElectrical check of the TiC#4 on TM#3 post
beam at the south hot cell, see attached
PDF for details
 TM3_TiC4_elec_chk_SHC_postbeam.PDF 
  691   Wednesday, June 25, 2014, 13:46 Travis CaveSouth Hot-CellRepairTM3no targetElectrical checkElectrical check of TM#3 after the insulator
repair. See attached PDF for details.
 TM3electestsinsulrepair.PDF 
  693   Thursday, June 26, 2014, 11:15 Travis CaveSouth Hot-CellStandard OperationTM3SiC#30Electrical checkElectrical check of the TM#3 with SiC#30
attached. Also an electrical check of TM#3
after the cleaning of ground electrode with
 TM3_SiC30_elecSHC.PDFTM3_elecchkaftclean.PDF 
  694   Thursday, June 26, 2014, 14:18 Travis CaveConditioning StationStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
south hot cell to the conditioning station.
  
  697   Wednesday, July 02, 2014, 09:02 Travis CaveITEStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
conditioning station to the east target station.
  
  701   Wednesday, July 16, 2014, 10:32 Travis CaveSouth Hot-CellStandard OperationTM1UC#9module moveTM#1 with UC#9 has been moved from the
west target station to the south hot cell.
  
ELOG V2.9.2-2455