ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
654
|
Monday, May 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | TM3 | TiC#4 | module move | TM#3 with TiC#4 has been moved from the
east station to the south west silo. |
|
657
|
Tuesday, May 06, 2014, 14:05 |
Travis Cave | ITE | Standard Operation | | | module move | The entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules |
|
662
|
Wednesday, May 21, 2014, 13:56 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay | All targets in the vault have been assayed
and measured. Results will be posted soon. |
|
663
|
Wednesday, May 21, 2014, 13:56 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay | All targets in the vault have been assayed
and measured. Results will be posted soon.
|
|
666
|
Tuesday, May 27, 2014, 10:42 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#42 | module move | TM#4 with Ta#42 has been moved from
the west target station to the south hot
cell. |
|
667
|
Tuesday, May 27, 2014, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 electrical check with Ta#42 attached
post beam at the south hot cell. |
|
668
|
Wednesday, May 28, 2014, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south hot cell to the south west silo. |
|
669
|
Friday, May 30, 2014, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#42 | Spent target move | Ta#42 in pail #114 has been moved from
the south hot cell to the spent target storage
vault and place in spot 7B. The target was |
|
670
|
Monday, June 02, 2014, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the north west silo to the south hot cell. |
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | TM#1 with UC#9 electrical check see attached
pdf for details. |
|
674
|
Monday, June 02, 2014, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 has been moved from the
south hot cell to the conditioning station. |
|
679
|
Tuesday, June 10, 2014, 13:20 |
Travis Cave | ITW | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 moved from the conditioning
station to west station. |
|
681
|
Thursday, June 12, 2014, 09:42 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | Five targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28, |
|
684
|
Tuesday, June 24, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move | TM#4 with TiC#4 has been moved from the
east target station to the south hot cell. |
|
686
|
Tuesday, June 24, 2014, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check | Electrical check of the TiC#4 on TM#3 post
beam at the south hot cell, see attached
PDF for details |
|
691
|
Wednesday, June 25, 2014, 13:46 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical check | Electrical check of TM#3 after the insulator
repair. See attached PDF for details. |
|
693
|
Thursday, June 26, 2014, 11:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Electrical check | Electrical check of the TM#3 with SiC#30
attached. Also an electrical check of TM#3
after the cleaning of ground electrode with |
|
694
|
Thursday, June 26, 2014, 14:18 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | SiC#30 | module move | TM#3 with SiC#30 has been moved from the
south hot cell to the conditioning station. |
|
697
|
Wednesday, July 02, 2014, 09:02 |
Travis Cave | ITE | Standard Operation | TM3 | SiC#30 | module move | TM#3 with SiC#30 has been moved from the
conditioning station to the east target station. |
|
701
|
Wednesday, July 16, 2014, 10:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | module move | TM#1 with UC#9 has been moved from the
west target station to the south hot cell. |
|