1767
|
Tuesday, August 14, 2018, 10:27 |
Travis Cave | ITW | Standard Operation | TM2 | UC#23 | Module move |
Both the West Entrance and TM#2 with UC#23 have been moved back into their places in the west target station. The Entrance module move wasn't completely smooth as it did suffer a little bumpiness when the shield plug part was installed, I was lifted back out again and no visible damage was observed on the delicate items. |
1784
|
Tuesday, September 18, 2018, 12:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#23 | Module move |
TM#2 with UC#23 has been moved from ITW to the south hot cell. The shield plug was also installed remotely as well. |
1790
|
Monday, September 24, 2018, 10:21 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | UC#23 | Post Irradiation Examination (PIE) |
UC#23 experienced short between target and heat shield as it was heated during operation. The inspection of the target after irradiation revealed that the left target leg was close to the heat shield opening and likely the cause of the short. Marks could be seen on the leg indicating contact. See attached photo. More photos are available on DocuShare |
Attachment 1: 20180924_161322929_iOS.jpg
|
|
1791
|
Monday, September 24, 2018, 14:50 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#23 | Spent Target Move |
The spent UC#23 target has been moved from the south hot cell to the spent target storage. It was placed in pail #170 and place in spot #4B in the vault. |
2029
|
Thursday, November 14, 2019, 13:52 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22,23,24 | Targets repackaged |
The targets UC#22,23,24 have been repackaged into the newer stronger pails, and have been placed back in the mini vault with new numbers. See attached PDF for details. |
Attachment 1: Target_Index_2019-11-14_Mini_Vault.pdf
|
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check |
The results of TM#4 with UC#22 electrical check. See attached PDF. |
Attachment 1: TM4_UC22_Electrical_Check_South_Hot_Cell.pdf
|
|
1731
|
Thursday, June 07, 2018, 11:37 |
Travis Cave | ITE | Standard Operation | TM4 | UC#22 | Module move |
TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem. |
1732
|
Friday, June 08, 2018, 10:22 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Module move |
Travis Cave wrote: |
TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem.
|
The IMC (ITA0160) appears to have a dent in it from the contact with the Target Module. The pressure on the IMC was found to be about negative ~3 mmHg and was increased to ~20 mmHg to attempt to retract the IMC further away from the TM. This pressure is similar to the pressure used at the Conditioning Station. The bellows appears not to be symmetrically compressed. It should be inspected again and pressure checked and monitored for upcoming module moves. |
Attachment 1: IMC.png
|
|
1737
|
Thursday, June 14, 2018, 11:37 |
David Wang | ITE | Standard Operation | TM4 | UC#22 | TM4 UC 22# checklist. |
See attachments |
Attachment 1: TM4_UCx_22#_check_list.pdf
|
|
1753
|
Monday, July 16, 2018, 17:41 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Target module disconnected |
The water and electrical connections were disconnected today as protons remained off after power interruption during the weekend. Vacuum is still connected and operating.
The vacuum system are disconnected 2018-07-17. See attachment . |
Attachment 1: TM4_UCx_22#__disconnection_check_list_1.pdf
|
|
Attachment 2: TM4_UCx_22#__disconnection_check_list_2.pdf
|
|
1760
|
Tuesday, July 31, 2018, 11:16 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22 | Spent Target Move |
Yesterday the spent UC#22 target was moved from the south hot cell to the spent target vault. It was placed in pail #167 and placed in spot 4A see attached PDF for details. |
Attachment 1: Target_Index_2018-07-30.pdf
|
|
1604
|
Monday, August 28, 2017, 14:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#21 | Module move |
TM#4 with UC#21 has been moved from the south hot cell to the conditioning station. |
1605
|
Monday, August 28, 2017, 14:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Electrical Check |
The results of the electrical check of TM#4 with UC#21 attached. |
Attachment 1: TM4_UC21_elecchk_SHC.PDF
|
|
1610
|
Tuesday, September 05, 2017, 10:25 |
Travis Cave | ITE | Standard Operation | TM4 | UC#21 | Module move |
TM#4 with UC#21 has been moved from the conditioning station to the east target station. |
1643
|
Tuesday, October 17, 2017, 10:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Module move |
TM#4 with UC#21 has been moved from the east target station to the south hot cell. |
1650
|
Monday, October 23, 2017, 13:38 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#21 | Spent Target move |
The spent UC#21 has been moved from the south hot cell to the spent target vault. See attached for details |
Attachment 1: Vault_Storage_October_23_2017.pdf
|
|
1536
|
Tuesday, May 16, 2017, 13:23 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#20 | UC#20 Installed |
UCx#19 has been removed from TM4 and UCx#20 installed.
UCx#19 still had water in it at pressure and sprayed when the VCR was undone. It was quickly re-tightened but not before significant water pooled beside the main Mykroy standoff and table. Contacted Anders would suggested to soak it up with some wipes and continue, which I did.
New target fasteners including high current. High current fasteners torqued to 130 in lbs. |
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check |
TM#4 with UC#20 has had the electrical check done on it at the south hot cell, see attached for details |
Attachment 1: TM4_UC20_Elec_chk_SHC.PDF
|
|
1538
|
Tuesday, May 16, 2017, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | module moved |
TM#4 with UC#20 has been moved from the south hot cell to the conditioning station. |
1543
|
Thursday, May 18, 2017, 11:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | Electrical Check |
Electrical check of TM#4 with UC#20 at the conditioning station under vacuum. See attached for details. |
Attachment 1: TM4_UC20_Elec_chk_CS_vac.PDF
|
|