  2163   Thursday, November 12, 2020, 10:02 Travis CaveSpent Target VaultStandard Operation UC#31Spent Target Move UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and
  
  2119   Friday, July 03, 2020, 14:08 Travis CaveITEStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
the south hot cell to the east target station.
  
  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
ITE to the south hot cell.
  
  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr
 Target_Index_2020-09-24.pdf 
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 RemovalUC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of
 IMG_0610.JPGIMG_0616.JPG 
  2013   Thursday, October 24, 2019, 14:11 Travis CaveITWStandard OperationTM4UC#29Module move TM#4 with UC29 has been moved from
the south hot cell to the west target station.
  
  2058   Tuesday, February 04, 2020, 14:22 Travis CaveSouth Hot-CellStandard OperationTM4UC#29Module move TM#4 with UC#29 has been moved from
the west target station to the south hot
cell.
  
  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225 UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. 
  
  1999   Friday, October 04, 2019, 14:53 Travis CaveSouth Hot-CellStandard OperationTM4UC#28Module move TM#4 with UC#28 has been moved from
the south hot cell to the west target station.
  
  2015   Monday, October 28, 2019, 11:50 Travis CaveSpent Target VaultStandard Operation UC#28Spent Target Move UC#28 has been moved from the south
hot cell to spent target storage. The target
was placed in pail number 219 and placed
 Target_Index_2019-10-28.pdf 
  2004   Tuesday, October 08, 2019, 09:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#27 and UC#28Electrical Check Results of the electrical check of
TM4 without target and with UC27 and 28
 TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdfTM4_elec_chk__with_UC28_shc_Oct-04-2019.pdfTM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf 
  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1979   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1982   Tuesday, September 10, 2019, 10:10 Adam NewsomeITWStandard OperationTM4UC#27TM4 MoveTM4 has been moved from the Conditioning
Station to ITW with UC#27 target.
  
  2005   Wednesday, October 09, 2019, 13:28 Travis CaveSpent Target VaultStandard Operation UC#27Spent Target Move The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in spot 1B of the vault in
 Target_Index_2019-10-09.pdf 
  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station.
  
  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the conditioning station to the east target
station.
  
  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block moveBlocks were moved from ITW to ITE by Frank
and David. ITE water flow to dump was re-opened
(ITW remains open). A dose badge was installed
  
  1911   Tuesday, April 30, 2019, 08:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
ITE to the south hot cell.
  
  1912   Tuesday, April 30, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Electrical Check Electrical check of TM#4 with UC#26
post beam at the south hot cell. See attached.
 Elec_CHk_UC26_SHC_post_beam.pdf 