ID Date Author Category Type Module Target/Numberdown Subject
  2163   Thursday, November 12, 2020, 10:02 Travis CaveSpent Target VaultStandard Operation UC#31Spent Target Move

 UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal from the south hot cell.

  2119   Friday, July 03, 2020, 14:08 Travis CaveITEStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from the south hot cell to the east target station.

  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from ITE to the south hot cell.

  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move

 UC#30 has been placed into the spent target vault, it was placed in pail 238 and in spot 1A of the vault. It was 81.5 mSv/hr when removed from the south hot cell. 

Attachment 1: Target_Index_2020-09-24.pdf
Target_Index_2020-09-24.pdf Target_Index_2020-09-24.pdf Target_Index_2020-09-24.pdf
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 Removal

UC#3 was removed from TM1 this morning. Upon removing the oven heater bolts BOTH legs fell demonstrating that both sides of the oven tube have broken off from the central block.

Target was put into a can under argon for disposal after the module is removed from the cell.

The source tray looked to be in very good, clean condition.

IMG_0610.JPG

Attachment 2: IMG_0616.JPG
IMG_0616.JPG
  2013   Thursday, October 24, 2019, 14:11 Travis CaveITWStandard OperationTM4UC#29Module move

 TM#4 with UC29 has been moved from the south hot cell to the west target station.

  2058   Tuesday, February 04, 2020, 14:22 Travis CaveSouth Hot-CellStandard OperationTM4UC#29Module move

 TM#4 with UC#29 has been moved from the west target station to the south hot cell.

  2063   Thursday, February 06, 2020, 13:31 Adam NewsomeSpent Target VaultStandard Operation UC#29UC#29 moved to vault location 6A, in pail 225

 UC#29 in pail 225 was moved to the storage vault, location 6A. Field measured at 22.4 mSv/hr at ~1m. 

  1999   Friday, October 04, 2019, 14:53 Travis CaveSouth Hot-CellStandard OperationTM4UC#28Module move

 TM#4 with UC#28 has been moved from the south hot cell to the west target station.

  2015   Monday, October 28, 2019, 11:50 Travis CaveSpent Target VaultStandard Operation UC#28Spent Target Move

 UC#28 has been moved from the south hot cell to spent target storage. The target was placed in pail number 219 and placed in spot 1C of the vault, it was 12.6mSv/hr upon removal from the south hot cell. Also the spent target vault is now full and can not currently accept anymore targets.

Attachment 1: Target_Index_2019-10-28.pdf
Target_Index_2019-10-28.pdf Target_Index_2019-10-28.pdf
  2004   Tuesday, October 08, 2019, 09:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#27 and UC#28Electrical Check

 Results of the electrical check of TM4 without target and with UC27 and 28

Attachment 1: TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdf
TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdf
Attachment 2: TM4_elec_chk__with_UC28_shc_Oct-04-2019.pdf
TM4_elec_chk__with_UC28_shc_Oct-04-2019.pdf
Attachment 3: TM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf
TM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf
  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check

 The results of the electrical check of TM#4 with UC#27 attached to it.

Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
  1979   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check

 The results of the electrical check of TM#4 with UC#27 attached to it.

Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
  1982   Tuesday, September 10, 2019, 10:10 Adam NewsomeITWStandard OperationTM4UC#27TM4 Move

TM4 has been moved from the Conditioning Station to ITW with UC#27 target.

  2005   Wednesday, October 09, 2019, 13:28 Travis CaveSpent Target VaultStandard Operation UC#27Spent Target Move

 The spent target in the south hot cell has been moved to the spent target vault. It was placed in spot 1B of the vault in pail number 218. See attached for vault details.

Attachment 1: Target_Index_2019-10-09.pdf
Target_Index_2019-10-09.pdf Target_Index_2019-10-09.pdf
  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from the south hot cell to the conditioning station.

  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from the conditioning station to the east target station.

  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block move

Blocks were moved from ITW to ITE by Frank and David. ITE water flow to dump was re-opened (ITW remains open). A dose badge was installed in the operation storage area. Dose rates were measured to ~10 mSv/h at 1pm. Beam went off approximately 8:30am (with a short period of 2uA ending at 11am).

  1911   Tuesday, April 30, 2019, 08:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from ITE to the south hot cell.

  1912   Tuesday, April 30, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Electrical Check

 Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached.

Attachment 1: Elec_CHk_UC26_SHC_post_beam.pdf
Elec_CHk_UC26_SHC_post_beam.pdf