Tuesday, February 04, 2020, 14:22, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#29, Module move
|
TM#4 with UC#29 has been moved from the west target station to the south hot cell. |
Thursday, February 06, 2020, 13:31, Adam Newsome, Spent Target Vault, Standard Operation, , UC#29, UC#29 moved to vault location 6A, in pail 225
|
UC#29 in pail 225 was moved to the storage vault, location 6A. Field measured at 22.4 mSv/hr at ~1m. |
Friday, October 04, 2019, 14:53, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#28, Module move
|
TM#4 with UC#28 has been moved from the south hot cell to the west target station. |
Monday, October 28, 2019, 11:50, Travis Cave, Spent Target Vault, Standard Operation, , UC#28, Spent Target Move
|
UC#28 has been moved from the south hot cell to spent target storage. The target was placed in pail number 219 and placed in spot 1C of the vault, it was 12.6mSv/hr upon removal from the south hot cell. Also the spent target vault is now full and can not currently accept anymore targets. |
Tuesday, October 08, 2019, 09:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27 and UC#28, Electrical Check  
|
Results of the electrical check of TM4 without target and with UC27 and 28 |
Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check
|
The results of the electrical check of TM#4 with UC#27 attached to it. |
Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check
|
The results of the electrical check of TM#4 with UC#27 attached to it. |
Tuesday, September 10, 2019, 10:10, Adam Newsome, ITW, Standard Operation, TM4, UC#27, TM4 Move
|
TM4 has been moved from the Conditioning Station to ITW with UC#27 target. |
Wednesday, October 09, 2019, 13:28, Travis Cave, Spent Target Vault, Standard Operation, , UC#27, Spent Target Move
|
The spent target in the south hot cell has been moved to the spent target vault. It was placed in spot 1B of the vault in pail number 218. See attached for vault details. |
Wednesday, November 28, 2018, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#26, Module move
|
TM#4 with UC#26 has been moved from the south hot cell to the conditioning station. |
Tuesday, December 04, 2018, 10:26, Travis Cave, ITE, Standard Operation, TM4, UC#26, Module move
|
TM#4 with UC#26 has been moved from the conditioning station to the east target station. |
Tuesday, December 11, 2018, 14:35, Anders Mjos, ITE, Standard Operation, TM4, UC#26, Block move
|
Blocks were moved from ITW to ITE by Frank and David. ITE water flow to dump was re-opened (ITW remains open). A dose badge was installed in the operation storage area. Dose rates were measured to ~10 mSv/h at 1pm. Beam went off approximately 8:30am (with a short period of 2uA ending at 11am). |
Tuesday, April 30, 2019, 08:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Module move
|
TM#4 with UC#26 has been moved from ITE to the south hot cell. |
Tuesday, April 30, 2019, 11:19, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#26, Electrical Check
|
Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached. |
Wednesday, May 01, 2019, 07:49, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#26, UC#26 removal
|
UC#26 has been removed from TM4. |
Thursday, May 02, 2019, 09:37, Travis Cave, Spent Target Vault, Standard Operation, , UC#26, Spent Target Move
|
The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell. |
Wednesday, October 31, 2018, 14:20, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#25, Module move
|
TM#2 with UC#25 has been moved from the south hot cell to the conditioning station. |
Monday, November 05, 2018, 14:27, Anders Mjos, Conditioning Station, Standard Operation, TM2, UC#25, Target module disconnected
|
Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow. |
Tuesday, November 06, 2018, 10:59, Travis Cave, ITW, Standard Operation, TM2, UC#25, Module move
|
TM#2 with UC#25 has been moved from the conditioning station to the west target station. |
Wednesday, November 07, 2018, 09:50, Anders Mjos, ITW, Standard Operation, TM2, UC#25, TM2 connected in ITW
|
TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only (dwg). Link to check list on DocuShare. |
|