Monday, November 15, 2021, 12:00, Travis Cave, Spent Target Vault, Standard Operation, , Ta#53, Repacking of the target.
|
Ta#53 was repacked and placed in the mini vault it was changed from pail#164 to pail#262. See attached PDF for further details. |
Wednesday, November 10, 2021, 11:06, Travis Cave, Spent Target Vault, Standard Operation, , C#3, Spent Target Move
|
The spent C#3 target has been moved from the south hot cell to the spent target vault it was placed in pail #270 and put in spot 2C of the vault. See attached PDF for more details. |
Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection
|
TM2 with target UC#36 was connected at ITW. |
Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check
|
An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. |
Tuesday, November 09, 2021, 14:35, Adam Newsome, South Hot-Cell, Standard Operation, TM2, UCX#36, Module Move
|
TM#2 was moved from ITW to SHC, then moved back to ITW. |
Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection
|
the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC. |
Friday, October 29, 2021, 12:27, Travis Cave, Spent Target Vault, Standard Operation, , Ta#56, Repacking of the target.
|
Ta#56 in pail #169 was repacked and placed into #269 and was placed in the mini vault at the back. It was 3.86mSv/hr upon removal from the NHC. See attached files for details. |
Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer
|
the five shielding blocks have been moved from ITW to ITE. |
Wednesday, October 13, 2021, 11:54, Travis Cave, North Hot-Cell, Standard Operation, , SiC#41, Spent Target Move
|
The spent SiC#41 target has been placed in pail #260 and placed in spot 5B of that spent target vault. See attached PDF for details. |
Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection
|
the module with target UC#35 was connected in ITE and being pumped down. |
Friday, October 08, 2021, 11:19, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#35, TM4 IGLIS target electrical tests
|
the tests were done when TM4 was on NHC. see attached photos please. |
Wednesday, October 06, 2021, 10:42, David Wang, ITE, Repair, , , ITE IG1S cable end connector replacement
|
ITE IG1S cable end connector replacement has been finished by Roy Huang. |
Monday, October 04, 2021, 10:52, Travis Cave, North Hot-Cell, Standard Operation, TM4, SiC#41, Module move
|
TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE. |
Monday, October 04, 2021, 09:37, Frank Song, ITE, Standard Operation, TM4, Sic#41, module disconnection
|
TM4 was disconnected and moved to NHC. |
Monday, October 04, 2021, 09:33, Frank Song, North Hot-Cell, Standard Operation, TM2, C#3, TM2 with target connection test
|
the test was done when TM2 sit on NHC. |
Monday, October 04, 2021, 09:27, Frank Song, ITW, Standard Operation, TM2, C#3, Module Connection
|
TM2 been connected with new target C#3 in ITW. |
Monday, September 27, 2021, 14:29, Travis Cave, ITW, Standard Operation, TM2, Graphite #3, Module move
|
TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days. |
Thursday, September 23, 2021, 19:04, Adam Newsome, Spent Target Vault, Development, , , Mini-Storage: Remote Capability
|
Remote capability was added for the mini-storage door control. The control signals originate from the Opto 22 Module box that is used for the SMP remote control (this is located just above the storage vault).
The controls signal assignment document has been updated and can be found in C:\PDM Vault\PDM_Vault\_models\isac\isac1\wpn-3919 - safe module parking\Electrical
In order to operate remotely:
- Plug the mini-storage control box power cable into a wall outlet (adjacent main storage vault, under stairs)
- Plug the motor output cable into the mini-storage door motor
- Unplug the local pendant from the box
- Plug the cable that comes from the remote module box into the connector that the pendant was plugged into (M12, 5 pole Murr connector)
- Using the remote control program from the ISAC RH control room, click on the Mini-Storage option and then click buttons for open and close to operate the door (note: it is important to verify both opening and closing functions work before attempting any remote operation).
Remote and local functionality have been tested and verified working.
It is recommended to mount the mini-storage control box in a convenient area near the mini-storage (possibly on the wall adjacent the main storage vault).
Please contact me if you have any further questions. |
Wednesday, September 22, 2021, 11:13, Travis Cave, Spent Target Vault, Standard Operation, , UC#34, Spent Target Move
|
The spent UC#34 target was moved from the north hot cell to the spent target vault. See attached PDF for details. |
Tuesday, September 21, 2021, 13:47, Travis Cave, North Hot-Cell, Standard Operation, TM2, UC#34, Module move
|
TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo. |
|