1822
|
Thursday, November 22, 2018, 08:52 |
Anders Mjos | ITE | Standard Operation | TM4 | Ta#57 | Closed ITE dump water | Paddle wheel signal was tripping proton
beam in ITW. Valved off ITE dump to divert
flow to ITW. Field around valve was about |
|
|
1827
|
Tuesday, November 27, 2018, 11:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#57 | Module move | TM#4 with Ta#57 has been moved from
the east target station to the south hot
cell. |
|
|
1828
|
Tuesday, November 27, 2018, 13:31 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#57 | Ta#57 removal | Ta#57 has been removed from TM4. |
|
|
1830
|
Wednesday, November 28, 2018, 07:04 |
David Wang | ITE | Development | TM4 | LpTa 56 | New high current flexible cables inspection after LpTa#56 beam run. | Inspected new high current flexible cables
during TM4 disconnection. The new cables
and adapters work fine. |
|
|
1831
|
Wednesday, November 28, 2018, 11:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#57 and UC#26 | Electrical Check | Electrical check of TM#4 with the
old Ta#57, no target and with new IG-LIS
UC#26 target. See attached PDF for details. |
|
|
1832
|
Wednesday, November 28, 2018, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station. |
|
|
1833
|
Thursday, November 29, 2018, 06:38 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check TM4 UCx 26 at SHC. | Chad and I did a leak check on TM4 HS line
with UCx 26# installed . Base LR 0.0X E-9
atm.cc/sec. Base pressure 0.0XE-4 torr. |
|
|
1835
|
Tuesday, December 04, 2018, 10:26 |
Travis Cave | ITE | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
the conditioning station to the east target
station. |
|
|
1836
|
Tuesday, December 04, 2018, 12:36 |
David Wang | ITE | Standard Operation | TM4 | UCx 26. | TM4 has been connected in ITE/ Checklist. | TM4 has been connected in ITE. See attachment
for connection checklist |
|
|
1840
|
Tuesday, December 11, 2018, 14:35 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#26 | Block move | Blocks were moved from ITW to ITE by Frank
and David. ITE water flow to dump was re-opened
(ITW remains open). A dose badge was installed |
|
|
1868
|
Friday, February 15, 2019, 12:05 |
David Wang | ITE | Maintenance | TM4 | | ITE annual vacuum leak check. | Helium pressure test on all water lines:
70psi , 3 minutes. HS has a quick response
to 9Xe-9atm.cc/sec for 20 seconds. No response |
|
|
1869
|
Friday, February 15, 2019, 12:09 |
David Wang | ITE | Maintenance | TM4 | | ITE water system maintenance. | The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes |
|
|
1911
|
Tuesday, April 30, 2019, 08:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#26 | Module move | TM#4 with UC#26 has been moved from
ITE to the south hot cell. |
|
|
1912
|
Tuesday, April 30, 2019, 11:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#26 | Electrical Check | Electrical check of TM#4 with UC#26
post beam at the south hot cell. See attached. |
|
|
1913
|
Wednesday, May 01, 2019, 07:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#26 | UC#26 removal | UC#26 has been removed from TM4. |
|
|
1914
|
Wednesday, May 01, 2019, 09:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has now been moved to the south
west silo. |
|
|
1915
|
Wednesday, May 01, 2019, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check | Electrical check of the TM#4 with
no target attached at the south hot cell
before being moved to the south west silo. |
|
|
1927
|
Wednesday, May 22, 2019, 11:50 |
David Wang | ITE | Standard Operation | TM4 | | TM2 has been connected in ITE. | TM2 has been connected in ITE. high active
water system and vacuum pumps are started.
The pumping down on TM2 and ITE is good |
|
|
1931
|
Friday, May 24, 2019, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
west silo to the south hot cell. |
|
|
1933
|
Thursday, June 06, 2019, 10:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target, no source Tray | Electrical Check | Results from the electrical check
of TM#4 at the south hot cell with no source
tray. R&U are shorted and when meggered |
|