Entry  Monday, February 24, 2014, 11:05, chad fisher, South Hot-Cell, Repair, TM2, , Circuit D blank off 

The blank off with the o-ring has been removed, manipulator fixed, circuit D water block sealinhg surfaces cleaned and blank off with c-seals installed and torqued. Leak check will occur shortly.

Entry  Monday, February 24, 2014, 12:09, chad fisher, South Hot-Cell, Repair, TM2, , C-seal blank off test TM2_20140224_1.jpg

Circuit D has passed the vacuum leak check. Jig has been removed and containment box re-installed for move to conditioning station.

Entry  Monday, February 24, 2014, 13:52, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move 

TM#2 moved from the south hot cell to the conditioning station.

Entry  Tuesday, February 25, 2014, 06:53, David Wang, South Hot-Cell, Repair, TM2, , Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. 

Chad and I did the leak check   on TM2 tube heater (+) water line  with blank off and C-seal  installed on  WB at South Hot Cell.The line was easy to pump down to 0.0xE-9atm.cc/sec and 0.0XE-4 torr on leak detector. Chad flushed lot helium around the water block (10 sec spray). No response had been found on leak detector.

Entry  Tuesday, March 25, 2014, 09:11, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#42, Ta#42 install and "new" 9 pin TM4_20140325_01.jpg

Ta#42 has been installed onto TM4. The "new" 9 pin connector was not an issue...attually went on better than any other previous one. Leaving the mounting screws loose on the target half allowed use of the manipulator to center the pins and insert them with ease.

Entry  Tuesday, March 25, 2014, 13:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check TM#4_notarget_electest_SHC.PDFTM#4_Ta42surf_electest_SHC.PDF

TM#4 was checked electrically with and without target on it, see attached PDFs for details.

Entry  Wednesday, March 26, 2014, 06:57, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#42, Leak check on TM4 HS water line with new Ta #42 target. 

Chad and I leak checked TM4 HS line with Ta#42 target on the module. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 torr. Chad applied helium to the joints, and flushed the helium around the target. No leak has been found.I will do helium pressure test on this circuit at CS later.

Entry  Friday, April 04, 2014, 14:16, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 

TM#3 with no target has been moved from the south west silo to the south hot cell.

Entry  Monday, April 07, 2014, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_test_no_target.PDF

TM#3 electrical check at the south hot  cell with no target to give us a base line and show that things are ok with the module for the start of the running year.

Entry  Monday, April 07, 2014, 11:49, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, Electrical check TM#3_elec_test_TiC#4_surf.PDF

Electrical test of TM#3 with TiC#4 attached. See PDF.

Entry  Monday, April 07, 2014, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM3, TiC#4, TiC#4 installation 

TiC#4 has been installed onto TM3

Entry  Tuesday, April 08, 2014, 09:05, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move 

TM#3 with TiC#4 has been moved from the south hot cell to the conditioning station.

Entry  Wednesday, April 09, 2014, 11:10, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 heat shield circuit leack check at SHC 

This Monday morning, Chad and I leak checked heat shielding circuit on TM3 with new target installed. The base LR on LD :0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. Chad sprayed helium twice on the VCR joints. No leak has been found. The circuit will be pressured with helium at CS.

Entry  Tuesday, May 27, 2014, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check TM4_Ta42_elec_chk_SHC_postbeam.PDF

TM#4 electrical check with Ta#42 attached post beam at the south hot cell.

Entry  Wednesday, May 28, 2014, 08:48, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 

TM#4 with no target has been moved from the south hot cell to the south west silo.

Entry  Monday, June 02, 2014, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 

TM#1 with no target has been moved from the north west silo to the south hot cell.

Entry  Monday, June 02, 2014, 11:25, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #9, UCx #9 Installed 
UCx #9 has been installed.
Entry  Monday, June 02, 2014, 11:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, Electrical check TM1_UC9_elec_chk_SHC.PDF

TM#1 with UC#9 electrical check see attached pdf for details.

Entry  Monday, June 02, 2014, 11:59, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new UC9# target installed 

Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure  test on it at CS later.

Entry  Tuesday, June 24, 2014, 11:12, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move 

TM#4 with TiC#4 has been moved from the east target station to the south hot cell.