  2298   Monday, January 24, 2022, 11:18 David WangITE/ITWStandard Operation  TH emergency exit hatch functional check

TH emergency exit hatch which is located on TH west end roof is opened and closed for functional check. The hatch works fine. The limit switch on hatch is in position. No obstacle on hatch way to the roof. 

  2297   Thursday, January 20, 2022, 11:09 Travis CaveSpent Target VaultStandard Operation Ta#63Spent Target Move
The spent Ta#63 has been moved from the north hot cell to the spent target vault. It was place in pail#266 and 
placed in spot #3B of the vault. see attached PDF for more details.
Attachment 1: Target_Index_2022-01-20.pdf
Target_Index_2022-01-20.pdf
  2296   Thursday, January 20, 2022, 08:18 David WangNorth Hot-CellStandard OperationTM4No targetTM4 was removed from NHC to S_W silo yesterday.

TM4 was removed from NHC to S_W silo yesterday.  The remove is smooth and successful.

  2295   Wednesday, January 19, 2022, 13:36 David WangCraneStandard Operation  Targe hall crane below hook attachment pins and plates annual inspection.

Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01. He certified the use of these pins and plates. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.  After inspection, The inspection tag  was issued and attached to pin. Tom has an inspection record on this job. See attachments.

Attachment 1: 2022-01-19_174.jpg
2022-01-19_174.jpg
Attachment 2: 2022-01-19_172.jpg
2022-01-19_172.jpg
  2294   Wednesday, January 19, 2022, 13:26 David WangCraneStandard Operation  Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.

Tom Gauss inspected  two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.. He certified the use of these two frames. Inspection tags have been issued and attached to frames. He has inspection record on them. See attachments.

Attachment 1: 2022-01-19_170.jpg
2022-01-19_170.jpg
Attachment 2: 2022-01-19_173.jpg
2022-01-19_173.jpg
Attachment 3: 2022-01-19_175.jpg
2022-01-19_175.jpg
Attachment 4: 2022-01-19_176.jpg
2022-01-19_176.jpg
  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target

 David did electrical check after target removed from TM4 at NHC. see attachment pls.

Attachment 1: 20220119_080049.jpg
20220119_080049.jpg
  2292   Tuesday, January 18, 2022, 11:02 Frank SongNorth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.

Attachment 1: tm4_with_Ta#63_on_NHC.jpg
tm4_with_Ta#63_on_NHC.jpg
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target.

 An electric check was done right after module moving from SMP to SHC. 

Attachment 1: TM2_without_UCx36_at_SHC_(2).jpg
TM2_without_UCx36_at_SHC_(2).jpg
  2290   Wednesday, January 12, 2022, 14:09 Travis CaveSpent Target VaultStandard Operation UC#36Spent Target Move

 The spent UC#36 target in the north hot cell has been removed and placed in the spent target vault. See attached PDF for detail note that the PDF does not show that spot 2B is occupied by the 2A3M20 pail.

Attachment 1: Target_Index_2022-01-12.pdf
Target_Index_2022-01-12.pdf
  2289   Tuesday, January 11, 2022, 11:51 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from NHC to SMP.

TM2( no target ) has been moved  from NHC to SMP.  The moving is smooth and successful.

  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.

Frank and I replaced ITW Exit module 1 side square service panel o-ring seal. Also, The target module pit top flange o-ring seal in ITW pit is replaced.  

  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.

Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful.

  2286   Monday, January 10, 2022, 09:31 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check.

ITE primary and secondary  vacuum vessel leak check has been down.  Base leak rate 0.0x E-9 atm.cc/sec on LD. Only 2.8 XE-9 atm.cc/sec leak has been found on big T tank seal which is very tiny. all other seals are perfect leak free.   No concern

  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.

Helium pressure 70 psi. 3 minutes on each circle untill LR on LD is balanced. Base leak rate on LD:0.0xE-9 atm.cc/sec.   The result:

A:   slowly to1.8Xe-8atm.cc/sec after 2 minutes and balanced there. 

B:   slowly to 2.0XE-8 atm.cc/sec after 2 minutes and balanced there.

C:  quickly response  to 3.1XE-8 atm.cc/sec and balance there.

D : slowly to 3.0X E-9 atm.cc/sec and balanced there.

All others including coil1, coil 2 ,MSP, EE, HS, window are perfectly leak tight. No response on LD.

 The leak rate on A,B,C,D are in low E-8 or E-9 atm.cc/sec range.  They should seal cooling water without leak.    No concern. 

 

  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit.

Frank and I finished ITW and TM2 leak check. TM2 internal water-cooling lines are leak free. They passed 70 psi helium pressure test. We found some small leaks on ITW primary and secondary vacuum vessel. I list them here:

  1. Exit module 2 service cap top plate to cap body O-ring at SW corner. Leak rate 2XE-8 atm.cc/sec. It is an old leak we found before. Solution: I sprayed high vacuum resin to leak area. It is improved to 3Xe-9atm/sec now. We can leave it there.
  1. Exit module 1 module to tank flange o-ring at target module side and north side. Leak rate 3XE-8atm.cc/sec. Solution: replace the o-ring. It involves in disconnect exit module 1 and remove it out. We may or may not change it. Let's check the schedule and discuss it later. We need Travis help on module moving out.
  2. Exit module 1 north side sqaure service panel o-ring. Leak rate 2XE-7 atm.cc/sec.  Solution: replace the o-ring. It is a straight forward job.  It will be done this shut down.
  3. Exit module 1 north side round roughing valve panel o-ring. Leak rate 8XE-9 atm.cc/sec. Solution: Replace the o-ring. It involves in disconnecting and removing ITW RV4.  It could be done this shut down.
  4. Big T tank o-ring seal underneath the flange at exit 1 module north side . Leak rate 3XE-8 atm.cc/sec. Solution: None. All modules and module base flange have to been moved out to replace this big o-ring.  It is a huge project to change this o-ring .  I checked this big o-ring seal every year. It is first time a small leak is found.  Maybe, we could try high vacuum resin spray first.
  5. Dump module flange o-ring at the side by Target module. Leak rate 8XE-9 atm.cc/sec. It cannot be confirmed since the TM o-ring is just beside it. Mostly, the leak is on dump module side. We changed TM flange o-ring every year. But we never changed dump module flange o-ring in history. Many copper cooling lines above the dump module has to be removed to remove the dump module out. I do not think we have time to do it this year. Also,  the leak rate is pretty small. Maybe, we can schedule it next year.

  Most these small leaks are close to turbopumps. This could be the reason the ITW vacuum on gauges are still pretty good.

  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections

 electrical checked in ITW

Attachment 1: TM2_with_UCx36.jpg
TM2_with_UCx36.jpg
  2282   Wednesday, January 05, 2022, 09:38 Frank SongITEMaintenanceTM4Ta #63TM4 SIS with Target and No external Connections

 electric check done in ITE. 

Attachment 1: tm4_with_Ta#63.jpg
tm4_with_Ta#63.jpg
  2281   Tuesday, November 30, 2021, 12:51 David WangITEStandard OperationTM4Ta#63.Tm4 has been connected in ITE.

TM4 has been connected in ITE. See attachment for checklist.

Attachment 1: from_my_cellphone_2598_647.jpg
from_my_cellphone_2598_647.jpg
Attachment 2: from_my_cellphone_2598_648.jpg
from_my_cellphone_2598_648.jpg
Attachment 3: from_my_cellphone_2598_649.jpg
from_my_cellphone_2598_649.jpg
Attachment 4: from_my_cellphone_2598_650.jpg
from_my_cellphone_2598_650.jpg
  2280   Tuesday, November 30, 2021, 11:03 David WangITEStandard OperationTM4Ta#63.Remotely remove TM4(Ta#63) from TCS to ITE.

Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful.

  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308s

We loaded UCx #29 , SiC #38  , Ta#53, Ta#56 ,and Ta#57 from mini storage  into F308 flasks.  Later, the flasks are transferred from TH to B2 HC service area. In TH, Working area and Mini storage are cleaned and surveyed.  Tools are cleaned and surveyed as well. No contamination.   Mini- storage is empty now.