Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 24 of 138  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  605   Monday, February 24, 2014, 11:05 chad fisherSouth Hot-CellRepairTM2 Circuit D blank offThe blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank
  
  606   Monday, February 24, 2014, 12:09 chad fisherSouth Hot-CellRepairTM2 C-seal blank off testCircuit D has passed the vacuum leak check.
Jig has been removed and containment box
re-installed for move to conditioning station.
 TM2_20140224_1.jpg 
  607   Monday, February 24, 2014, 13:52 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 moved from the south hot cell to the
conditioning station.
  
  608   Tuesday, February 25, 2014, 06:53 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.Chad and I did the leak check   on
TM2 tube heater (+) water line  with
blank off and C-seal  installed on 
  
  630   Tuesday, March 25, 2014, 09:11 chad fisherSouth Hot-CellStandard OperationTM4Ta#42Ta#42 install and "new" 9 pinTa#42 has been installed onto TM4. The
"new" 9 pin connector was not an
issue...attually went on better than any
 TM4_20140325_01.jpg 
  631   Tuesday, March 25, 2014, 13:29 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical checkTM#4 was checked electrically with and
without target on it, see attached PDFs for
details.
 TM#4_notarget_electest_SHC.PDFTM#4_Ta42surf_electest_SHC.PDF 
  632   Wednesday, March 26, 2014, 06:57 David WangSouth Hot-CellStandard OperationTM4Ta#42Leak check on TM4 HS water line with new Ta #42 target.Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4
  
  637   Friday, April 04, 2014, 14:16 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south west silo to the south hot cell.
  
  640   Monday, April 07, 2014, 10:48 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkTM#3 electrical check at the south hot 
cell with no target to give us a base line
and show that things are ok with the module
 TM#3_elec_test_no_target.PDF 
  641   Monday, April 07, 2014, 11:49 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical checkElectrical test of TM#3 with TiC#4 attached.
See PDF.
 TM#3_elec_test_TiC#4_surf.PDF 
  642   Monday, April 07, 2014, 14:13 chad fisherSouth Hot-CellStandard OperationTM3TiC#4TiC#4 installationTiC#4 has been installed onto TM3   
  643   Tuesday, April 08, 2014, 09:05 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
south hot cell to the conditioning station.
  
  644   Wednesday, April 09, 2014, 11:10 David WangSouth Hot-CellStandard OperationTM3 TM3 heat shield circuit leack check at SHCThis Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec,
  
  667   Tuesday, May 27, 2014, 11:45 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical checkTM#4 electrical check with Ta#42 attached
post beam at the south hot cell.
 TM4_Ta42_elec_chk_SHC_postbeam.PDF 
  668   Wednesday, May 28, 2014, 08:48 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the south hot cell to the south west silo.
  
  670   Monday, June 02, 2014, 10:52 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 with no target has been moved from
the north west silo to the south hot cell.
  
  671   Monday, June 02, 2014, 11:25 chad fisherSouth Hot-CellStandard OperationTM1UCx #9UCx #9 InstalledUCx #9 has been installed.   
  672   Monday, June 02, 2014, 11:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#9Electrical checkTM#1 with UC#9 electrical check see attached
pdf for details.
 TM1_UC9_elec_chk_SHC.PDF 
  673   Monday, June 02, 2014, 11:59 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new UC9# target installedChad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will
  
  684   Tuesday, June 24, 2014, 11:12 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module moveTM#4 with TiC#4 has been moved from the
east target station to the south hot cell.
  
ELOG V2.9.2-2455