ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1822   Thursday, November 22, 2018, 08:52 Anders MjosITEStandard OperationTM4Ta#57Closed ITE dump waterPaddle wheel signal was tripping proton
beam in ITW. Valved off ITE dump to divert
flow to ITW. Field around valve was about
  
  1827   Tuesday, November 27, 2018, 11:05 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57Module move TM#4 with Ta#57 has been moved from
the east target station to the south hot
cell.
  
  1828   Tuesday, November 27, 2018, 13:31 chad fisherSouth Hot-CellStandard OperationTM4Ta#57Ta#57 removalTa#57 has been removed from TM4.   
  1830   Wednesday, November 28, 2018, 07:04 David WangITEDevelopmentTM4LpTa 56New high current flexible cables inspection after LpTa#56 beam run.Inspected new high current flexible cables
during TM4 disconnection. The new cables
and adapters work fine.
 new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPGnew_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG 
  1831   Wednesday, November 28, 2018, 11:31 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57 and UC#26Electrical Check Electrical check of TM#4 with the
old Ta#57, no target and with new IG-LIS
UC#26 target. See attached PDF for details.
 Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdfElec_Chk_TM4_no_tgt_SHC_11-28-18.pdfElec_Chk_UC26_SHC_11-28-18.pdfElec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf 
  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station.
  
  1833   Thursday, November 29, 2018, 06:38 David WangSouth Hot-CellStandard OperationTM4 Leak check TM4 UCx 26 at SHC.Chad and I did a leak check on TM4 HS line
with UCx 26# installed . Base LR 0.0X E-9
atm.cc/sec. Base pressure 0.0XE-4 torr. 
  
  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the conditioning station to the east target
station.
  
  1836   Tuesday, December 04, 2018, 12:36 David WangITEStandard OperationTM4UCx 26.TM4 has been connected in ITE/ Checklist.TM4 has been connected in ITE. See attachment
for connection checklist
 UCx26_TM4_connection_checklist.pdf 
  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block moveBlocks were moved from ITW to ITE by Frank
and David. ITE water flow to dump was re-opened
(ITW remains open). A dose badge was installed
  
  1868   Friday, February 15, 2019, 12:05 David WangITEMaintenanceTM4 ITE annual vacuum leak check. Helium pressure test on all water lines:
70psi , 3 minutes. HS has a quick response
to 9Xe-9atm.cc/sec for 20 seconds. No response
  
  1869   Friday, February 15, 2019, 12:09 David WangITEMaintenanceTM4 ITE water system maintenance.The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes
  
  1911   Tuesday, April 30, 2019, 08:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
ITE to the south hot cell.
  
  1912   Tuesday, April 30, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Electrical Check Electrical check of TM#4 with UC#26
post beam at the south hot cell. See attached.
 Elec_CHk_UC26_SHC_post_beam.pdf 
  1913   Wednesday, May 01, 2019, 07:49 chad fisherSouth Hot-CellStandard OperationTM4UC#26UC#26 removalUC#26 has been removed from TM4.  20190501_072940[1].jpg 
  1914   Wednesday, May 01, 2019, 09:34 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has now been moved to the south
west silo.
  
  1915   Wednesday, May 01, 2019, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check Electrical check of the TM#4 with
no target attached at the south hot cell
before being moved to the south west silo.
 TM4_elec_chk_no_tgt_shc_may_1_2019.pdf 
  1927   Wednesday, May 22, 2019, 11:50 David WangITEStandard OperationTM4 TM2 has been connected in ITE.TM2 has been connected in ITE. high active
water system and vacuum pumps are started.
The pumping down on TM2 and ITE is good 
 Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf 
  1931   Friday, May 24, 2019, 09:11 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the south
west silo to the south hot cell.
  
  1933   Thursday, June 06, 2019, 10:01 Travis CaveSouth Hot-CellStandard OperationTM4no target, no source TrayElectrical Check Results from the electrical check
of TM#4 at the south hot cell with no source
tray. R&U are shorted and when meggered
 TM4_Electrical_Check_No_source_Tray_SHC_June_6_2019.pdf 