1699
|
Tuesday, April 10, 2018, 10:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move |
TM#2 has been moved from the south hot cell to the south west silo. |
|
1706
|
Tuesday, May 01, 2018, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move |
TM#4 with SiC#37 has been moved from the East Target Station to the South Hot cell. |
|
1707
|
Tuesday, May 01, 2018, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check |
Electrical check of TM#4 with SiC#37 attached post beam. A short was found between the Einzel Lens and Chassis. See attached PDF for details. |
Attachment 1: TM4_electrical_check_SiC37_post_beam.pdf
|
|
|
1708
|
Thursday, May 03, 2018, 08:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical Check |
The results of yesterdays electrical check of TM#4 with no target attached. See the attached PDF for details. |
Attachment 1: TM4_Electrical_Check_notarget_May_2_2018.pdf
|
|
|
1709
|
Thursday, May 03, 2018, 13:26 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting |
Yesterday Aaron, Isaac and Anders inspected the EZL connection from the service chase to the optics tray using the goose neck camera in SHC. No issues or shorts could be identified. Containment box was not removed.
Today David and Anders opened up two panels on the service cap and inspected the EZL connection. No issues or shorts could be identified. Photos available on DocuShare.
Next step will likely be to remove the containment box and inspect the optics tray. |
|
1711
|
Friday, May 04, 2018, 15:46 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting |
Anders Mjos wrote: |
Yesterday Aaron, Isaac and Anders inspected the EZL connection from the service chase to the optics tray using the goose neck camera in SHC. No issues or shorts could be identified. Containment box was not removed.
Today David and Anders opened up two panels on the service cap and inspected the EZL connection. No issues or shorts could be identified. Photos available on DocuShare.
Next step will likely be to remove the containment box and inspect the optics tray.
|
The containment box was removed yesterday. One of the main insulators on the source tray had cracked at the rear close to the bolt to the source tray mounting plate (see photos using link above)
Troubleshooting continued this morning with disconnection of the optics tray from the module. The banana plug copper tube connection was removed form the optics tray side. With the connection removed, the measurement showed open line on top of the module indicating that the problem is on the optics tray |
|
1713
|
Tuesday, May 15, 2018, 07:44 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move |
TM#4 was moved to the conditioning station from the south hot cell. The module was moved with out the containment box. |
|
1714
|
Tuesday, May 15, 2018, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Tm4 water circles helium pressur test result |
Helium pressure test on TM4 water lines is done this morning. 70 psi helim , 1 minutes time to each circle. The result:
A(oven+): 0.00xE-9 atm.cc/sec
B(Oven -): 8.1Xe-7 atm.cc/sec
C(tube -): 0.00xE-9 atm.cc/sec
D(tube+): 1.0xE-5 atm.cc/sec
PQ(coil 2): capped on top. water lines were removed because of leak
RU(Coil1): 0.00xE-9 atm.cc/sec
EE: 0.00xE-9 atm.cc/sec
MSP: 0.00xE-9 atm.cc/sec
HS: No target, capped on top. It was fine on last target check in 2017 Oct.
window: Capped on top. Containment box is not installed.
The leak check on D line caused the IG1 small response during test.
B and D circle are double checked. The reasults are same.
D line leak is in E-5 atm.cc/sec range. It is possible to locate it by using helium spray method in SHC. The containment box is not on so it should be easy to do it.
Switch on IGA gauge at TCS and apply helium and water at certain psi to check the IGA response may give us more information on these leaks.
All lines were test in last year shut down. They were good.
|
|
1715
|
Thursday, May 17, 2018, 11:30 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | | HV test/conditioning of damaged source tray |
BIAS only. Water lines looped on top. Containment box off.
Thursday, May 17, 2018, 11:20: Vacuum 7.2E-7 Torr
Thursday, May 17, 2018, 11:30: 10 kV
Thursday, May 17, 2018, 11:42: 20 kV
Thursday, May 17, 2018, 12:14: 25 kV
Thursday, May 17, 2018, 12:35: 30 kV
Thursday, May 17, 2018, 16:13: 35 kV
Thursday, May 17, 2018, 17:339: 37.5 kV
Thursday, May 17, 2018, 17:40: vacuum 6.8E-7 Torr
Thursday, May 17, 2018, 18:13: BIAS off. |
Attachment 1: TM4_2018-05-18_Water_Leak.docx
|
|
1717
|
Friday, May 18, 2018, 09:34 |
David Wang | Conditioning Station | Repair | TM4 | | water leak on TM4 Tube heater - B line confirmed. |
At 8:50 AM today, I applied water to TM4 tube heater - (B) line at TCS. All high vacuum gauges got response on this action. Water is leaking through B line on TM4.
It should be D line . David 2018-06-05 |
Attachment 1: TM4_2018-05-18_Water_Leak.docx
|
|
1719
|
Wednesday, May 23, 2018, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move |
TM#4 with no target and no containment box has been moved from the conditioning station to the south hot cell. |
|
1720
|
Wednesday, May 23, 2018, 10:40 |
chad fisher | South Hot-Cell | Repair | TM4 | | Optics Tray Removal |
The optics tray has been removed from TM4.
|
Attachment 1: 20180523_103405.jpg
|
|
Attachment 2: 20180523_103435.jpg
|
|
Attachment 3: 20180523_103440.jpg
|
|
|
1721
|
Thursday, May 24, 2018, 10:02 |
Anders Mjos | ITE | Development | TM4 | Empty | Module move ventilation test |
The new module move ventilation procedure was successfully tested (ITM:MP2). ITM:CM4 did not drop below 6 in during the test. |
|
1722
|
Thursday, May 24, 2018, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Modules moved |
TM#4 has been moved from the south hot cell to the east target station, and TM#2 has been moved from the south silo to the south hot cell. |
|
1728
|
Thursday, May 31, 2018, 14:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Loop and beam shield |
Tray with loop and beam shield has been inserted into the hot cell to be installed on TM4 . |
|
1729
|
Monday, June 04, 2018, 13:27 |
chad fisher | South Hot-Cell | Repair | TM4 | | Window Loop and Shield |
The tray with window waterline loop and EF Shield has been installed into TM4. |
Attachment 1: jhgf.jpg
|
|
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check |
The results of TM#4 with UC#22 electrical check. See attached PDF. |
Attachment 1: TM4_UC22_Electrical_Check_South_Hot_Cell.pdf
|
|
|
1731
|
Thursday, June 07, 2018, 11:37 |
Travis Cave | ITE | Standard Operation | TM4 | UC#22 | Module move |
TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem. |
|
1732
|
Friday, June 08, 2018, 10:22 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Module move |
Travis Cave wrote: |
TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem.
|
The IMC (ITA0160) appears to have a dent in it from the contact with the Target Module. The pressure on the IMC was found to be about negative ~3 mmHg and was increased to ~20 mmHg to attempt to retract the IMC further away from the TM. This pressure is similar to the pressure used at the Conditioning Station. The bellows appears not to be symmetrically compressed. It should be inspected again and pressure checked and monitored for upcoming module moves. |
Attachment 1: IMC.png
|
|
|
1737
|
Thursday, June 14, 2018, 11:37 |
David Wang | ITE | Standard Operation | TM4 | UC#22 | TM4 UC 22# checklist. |
See attachments |
Attachment 1: TM4_UCx_22#_check_list.pdf
|
|