  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1536   Tuesday, May 16, 2017, 13:23 chad fisherSouth Hot-CellStandard OperationTM4UC#20UC#20 InstalledUCx#19 has been removed from TM4 and UCx#20
installed.
UCx#19 still had water in it at pressure
  
  1537   Tuesday, May 16, 2017, 14:18 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Electrical CheckTM#4 with UC#20 has had the electrical
check done on it  at the south hot cell,
see attached for details
 TM4_UC20_Elec_chk_SHC.PDF 
  1538   Tuesday, May 16, 2017, 14:19 Travis CaveConditioning StationStandard OperationTM4UC#20module movedTM#4 with UC#20 has been moved from the
south hot cell to the conditioning station.
  
  1539   Wednesday, May 17, 2017, 08:31 David WangSouth Hot-CellStandard OperationTM4 Leak check on TM4 HS line at SHCChad and I finished leak check on HS line
with UCx target installed on it.  Base
Leak rate:0.0X 10^-9 atm.cc/sec, Base pressure
  
  1540   Wednesday, May 17, 2017, 08:35 David WangConditioning StationStandard OperationTM4 TCS turbo pumps was started yesterdayAnders started TCS turbo-pumps yesterday.
The TCS and TM4 pumping down is good so far.
I started TCS water pumps this morning for
  
  1541   Thursday, May 18, 2017, 10:08 David WangConditioning StationStandard OperationTM4 TM4 TP1 at TCSTM4 TP1 was found making some noise during
operation this morning. The current draw
was check then. It was 1.8 A which is higher
  
  1543   Thursday, May 18, 2017, 11:36 Travis CaveConditioning StationStandard OperationTM4UC#20Electrical CheckElectrical check of TM#4 with UC#20 at
the conditioning station under vacuum. See
attached for details.
 TM4_UC20_Elec_chk_CS_vac.PDF 
  1544   Friday, May 19, 2017, 12:25 David WangConditioning StationStandard OperationTM4 TCS and TM4 water flow measurement.  
 
  
  1545   Friday, May 19, 2017, 13:49 David WangConditioning StationRepairTM4 TM4 TP1 at TCSTM4 TP1 is replaced. TCS and TM4 was argon
vented before the job.The job took about
30minutes.  I started the all turbo
  
  1546   Tuesday, May 23, 2017, 10:41 Travis CaveITEStandard OperationTM4UC#20Module move TM#4 with UC#20 has been moved from
the conditioning station to the east target
station.
  
  1547   Tuesday, May 23, 2017, 13:30 David WangITEStandard OperationTM4 TM4 has been connected in ITEYasmine and I connected TM4 in ITE . All
turbo pumps are started.
  
  1565   Monday, June 26, 2017, 11:42 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Module move TM#4 with UC#20 has been moved from
the east target station to the south hot
cell. Also the shield plug was remotely installed
  
  1566   Monday, June 26, 2017, 11:47 chad fisherSouth Hot-CellStandard OperationTM4Ta#52UC#20 Removed Ta#52 installedUC#20 has been removed from TM4 and put
in a bucket back-filled with argon. Ta#52
has been installed onto TM4 with new fasteners.
  
  1567   Tuesday, June 27, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
south hot cell to the conditioning station.
  
  1568   Tuesday, June 27, 2017, 10:26 David WangSouth Hot-CellStandard OperationTM4Ta#52Leak check on TM4 HS line at SHCLD base LR:0.0Xe-9 atm.cc/sec. No leak
has been found during the check.  The
HS line will be helium pressurized at TCS
  
  1569   Tuesday, June 27, 2017, 14:34 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected at TCSTurbo -pumps are started . The vacuum looks
good so far.
  
  1570   Wednesday, June 28, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Electrical CheckResults of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum.
 TM4_Ta52_Elec_chk_SHC_CSvac.PDF 
  1571   Wednesday, June 28, 2017, 10:00 David WangConditioning StationStandard OperationTM4Ta#52TM2 has been connected at TCSI started TCS water system.   
  1572   Wednesday, June 28, 2017, 16:43 Anders MjosConditioning StationStandard OperationTM4Ta#52Conditioning Ta#52NEW HV cable for BIAS installed earlier
this week.
Wednesday, June 28, 2017, 16:42:
 Ta#52.docx 
  1573   Thursday, June 29, 2017, 11:12 Anders MjosSouth Hot-CellStandard OperationTM4UC#20Post Irradiation Examination (PIE)The target was inspected by Chad and Anders.
Photos are available on DocuShare.
It was noticed that the target tube heater
  