1536
|
Tuesday, May 16, 2017, 13:23 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#20 | UC#20 Installed | UCx#19 has been removed from TM4 and UCx#20
installed.
UCx#19 still had water in it at pressure |
|
|
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check | TM#4 with UC#20 has had the electrical
check done on it at the south hot cell,
see attached for details |
|
|
1538
|
Tuesday, May 16, 2017, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | module moved | TM#4 with UC#20 has been moved from the
south hot cell to the conditioning station. |
|
|
1539
|
Wednesday, May 17, 2017, 08:31 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 HS line at SHC | Chad and I finished leak check on HS line
with UCx target installed on it. Base
Leak rate:0.0X 10^-9 atm.cc/sec, Base pressure |
|
|
1540
|
Wednesday, May 17, 2017, 08:35 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS turbo pumps was started yesterday | Anders started TCS turbo-pumps yesterday.
The TCS and TM4 pumping down is good so far.
I started TCS water pumps this morning for |
|
|
1541
|
Thursday, May 18, 2017, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 TP1 at TCS | TM4 TP1 was found making some noise during
operation this morning. The current draw
was check then. It was 1.8 A which is higher |
|
|
1543
|
Thursday, May 18, 2017, 11:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | Electrical Check | Electrical check of TM#4 with UC#20 at
the conditioning station under vacuum. See
attached for details. |
|
|
1544
|
Friday, May 19, 2017, 12:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS and TM4 water flow measurement. |
|
|
|
1545
|
Friday, May 19, 2017, 13:49 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 TP1 at TCS | TM4 TP1 is replaced. TCS and TM4 was argon
vented before the job.The job took about
30minutes. I started the all turbo |
|
|
1546
|
Tuesday, May 23, 2017, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the conditioning station to the east target
station. |
|
|
1547
|
Tuesday, May 23, 2017, 13:30 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | Yasmine and I connected TM4 in ITE . All
turbo pumps are started. |
|
|
1565
|
Monday, June 26, 2017, 11:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the east target station to the south hot
cell. Also the shield plug was remotely installed |
|
|
1566
|
Monday, June 26, 2017, 11:47 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#52 | UC#20 Removed Ta#52 installed | UC#20 has been removed from TM4 and put
in a bucket back-filled with argon. Ta#52
has been installed onto TM4 with new fasteners. |
|
|
1567
|
Tuesday, June 27, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
south hot cell to the conditioning station. |
|
|
1568
|
Tuesday, June 27, 2017, 10:26 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#52 | Leak check on TM4 HS line at SHC | LD base LR:0.0Xe-9 atm.cc/sec. No leak
has been found during the check. The
HS line will be helium pressurized at TCS |
|
|
1569
|
Tuesday, June 27, 2017, 14:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 vacuum has been connected at TCS | Turbo -pumps are started . The vacuum looks
good so far. |
|
|
1570
|
Wednesday, June 28, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Electrical Check | Results of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum. |
|
|
1571
|
Wednesday, June 28, 2017, 10:00 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#52 | TM2 has been connected at TCS | I started TCS water system. |
|
|
1572
|
Wednesday, June 28, 2017, 16:43 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | Ta#52 | Conditioning Ta#52 | NEW HV cable for BIAS installed earlier
this week.
Wednesday, June 28, 2017, 16:42: |
|
|
1573
|
Thursday, June 29, 2017, 11:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | UC#20 | Post Irradiation Examination (PIE) | The target was inspected by Chad and Anders.
Photos are available on DocuShare.
It was noticed that the target tube heater |
|