1396
|
Tuesday, November 08, 2016, 14:45 |
David Wang | ITE | Maintenance | TM4 | | TM4 has been moved to ITE and connected there. | All ITE and TM4 turbo pumps are started.
The east station pumping down is good so
far. |
|
1397
|
Tuesday, November 15, 2016, 07:53 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Update TH schedules . See attachments |
|
1422
|
Wednesday, January 18, 2017, 09:55 |
David Wang | ITE | Standard Operation | TM4 | | ITE and TM4 2017 winter shut down leak check. | ITE and TM4 2017 winter shut down leak
check are finished. All ITE primary, secondary
vacuum vessel and TM4 water lines are good. |
|
1429
|
Friday, January 27, 2017, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#50 | Ta#50 Removed | Ta#50 has been was removed from TM4 on
Wednesday, January 25th. |
|
1452
|
Thursday, March 16, 2017, 10:32 |
David Wang | Spent Target Vault | Repair | TM4 | | TM4 and its silo rust photos | I watched rust on TM4 and its silo. Most
of rust are on est side of module and silo.
See attachments |
13x |
1455
|
Tuesday, March 21, 2017, 10:06 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | module moved | TM#4 has been moved from the SW Silo to
the conditioning station. |
|
1456
|
Tuesday, March 21, 2017, 11:59 |
David Wang | Conditioning Station | Repair | TM4 | | Rust inpsection on TM4 service cap inside surface and shielding plug surface. | Yasmine and I did a rust inpsection on
TM4 service cap inide surface and shielding
plug surface. No rust has been found. Also, |
11x |
1460
|
Thursday, March 23, 2017, 11:42 |
David Wang | Conditioning Station | Maintenance | TM4 | | TM4 Sevice cap rust are cleaned out. | TM4 service cap rust are cleaned out at
TCS. All top surface of TM4 are wiped and
cleaned . The module looks good now. see |
|
1467
|
Tuesday, March 28, 2017, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module moved | TM#4 has been moved from the conditioning
station to the south hot cell. |
|
1468
|
Tuesday, March 28, 2017, 10:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | Electrical Check | Electrical check done on TM#4 with UC#19.
See attached PDF for results. |
|
1469
|
Tuesday, March 28, 2017, 10:44 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#19 | UCx#19 Installed | UCx#19 has been installed onto TM4. High
current fasteners torqued to 130 in lbs.
Has been leak and electrical checked and |
|
1470
|
Wednesday, March 29, 2017, 11:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#19 | Conditioning UC#19 | Wednesday, March 29, 2017, 11:37:
RGA on
Wednesday, March 29, 2017, 13:51: |
|
1471
|
Wednesday, March 29, 2017, 14:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | | small leak on TM4 Ta(-) water line. | A small leak has been found on TM4 Ta(-)
which is marked as "B" on terminal
blocks. The LD base Leak rate is 1.2XE-8 |
|
1472
|
Thursday, March 30, 2017, 11:21 |
David Wang | Conditioning Station | Repair | TM4 | | Leak check on TM4 Ta(-) water lines in service cap | Leak check on TM4 Ta(-) water lines in
service cap is done. LD base LR after 50minutes
pumping down:0.0xE-9 atm.cc/sec. base pressure: |
|
1473
|
Tuesday, April 04, 2017, 09:29 |
Travis Cave | ITE | Standard Operation | TM4 | UC#19 | module moved | TM#4 with UC#19 has been moved from the
conditioning station to the east target station. |
|
1474
|
Tuesday, April 04, 2017, 10:23 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure leak check on TM4 Ta(-) water lines | This morning, The helium pressure leak
check on TM4 Ta(-) is done after TM4 finished
conditioning yesterday. LD base LR:8.0XE-9 |
|
1475
|
Tuesday, April 04, 2017, 10:24 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Stopped TCS pumps this morning | Argon vented TCS and TM4 after pumps
are stopped. |
|
1477
|
Tuesday, April 04, 2017, 14:40 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | all turbo-pumps are started. Everything
looks fine so far. |
|
1488
|
Tuesday, April 11, 2017, 14:06 |
David Wang | Conditioning Station | Standard Operation | TM4 | | SHC, TM2 leak check on HS line. | Chad and I did leak check on TM1 HS line
at SHC. 0.0XE-9 atm.cc/sec. No leak. |
|
1535
|
Tuesday, May 16, 2017, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | module moved | TM#4 with UC#19 has been moved from ITE
to the south hot cell. |
|