Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 17 of 138  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  35   Tuesday, October 04, 2011, 14:13 Travis CaveITWStandard OperationTM1TaC#1Move ot TM#1Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station.
  
  36   Wednesday, October 05, 2011, 09:41 Travis CaveSpent Target VaultStandard Operation UCx#2Spent target moveThe spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal
  
  37   Tuesday, October 25, 2011, 08:47 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredElectrical checkTM#4 with SiC#26 HP has been checked electrically
it has passed. It was noted that the Megger
check of the Oven to Chassis (earth ground)
  
  38   Tuesday, October 25, 2011, 11:58 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP has been moved from
the south hot cell to the conditioning station.
  
  40   Friday, October 28, 2011, 08:24 Travis CaveConditioning StationStandard OperationTM4SiC#26 High PoweredModule moveTM#4 moved from conditioning station to
south hot cell. For further leak checking.
  
  45   Monday, October 31, 2011, 08:51 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP moved from the south
hot cell to the conditioning station.
  
  48   Friday, November 04, 2011, 11:12 Travis CaveConditioning StationStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP move from the conditioning
station to the East Target Station, move
went well.
  
  49   Thursday, November 10, 2011, 14:33 Travis CaveSpent Target VaultStandard Operation  Spent Target AssayFor the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows:
  
  50   Monday, November 14, 2011, 14:07 Travis CaveITWStandard OperationTM1TaC#1Module moveTM#1 with TaC#1 from the west target station
to the south hot cell. Move went well.
  
  51   Tuesday, November 15, 2011, 13:08 Travis CaveConditioning StationStandard OperationTM1 Move ot TM#1TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well.
  
  54   Thursday, November 17, 2011, 11:51 Travis CaveSpent Target VaultStandard Operation TaC#1Spent target moveTaC#1 was moved from the south hot cell
to the storage vault. It was placed in pail#92
and put in vault slot 7B. It was 239mSv/hr
  
  55   Thursday, November 17, 2011, 11:52 Travis CaveConditioning StationStandard OperationTM1no targetModule moveTM#1 moved from the conditioning station
to the south hot cell. Move went well.
  
  56   Friday, November 18, 2011, 09:44 Travis CaveSouth Hot-CellStandard OperationTM1UCx#3Electrical checkElectrical checks of TM#1 with UCx#3 have
been completed. They all appear to be with
in operational range. All megger checks were
 ITW_UC#3_Elec_check.PDF 
  58   Friday, November 18, 2011, 11:09 Travis CaveConditioning StationStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 has been moved from the
south hot cell to the conditioning station.
Move went well.
  
  62   Thursday, November 24, 2011, 10:39 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well.
  
  63   Thursday, November 24, 2011, 10:40 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from the conditioning
station to the west target station.
  
  64   Thursday, December 15, 2011, 13:08 Travis CaveSpent Target VaultStandard Operation  Spent Target AssaySpent target assay completed. A total of
16 target were looked at, 13 were low enough
to be assayed and those 13 are at shippable
 Vault_Storage_December_14_2011.pdf 
  65   Wednesday, January 04, 2012, 13:49 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Well the first of this year's lucky winners
to win a fabulous one way trip to Chalk River
are as follows. UC#1, UC#2, Ta#25, Ta#26,
  
  66   Thursday, January 05, 2012, 11:40 Travis CaveSpent Target VaultStandard Operation  Target swapping Looks like the UC target s #1 and #2 were
found invalidprize winners for their all
inclusive trip to Chalk River and have thus
 Vault_Storage_January_5_2012.pdfMini_Vault_Storage_January_5_2012.pdf 
  69   Thursday, January 12, 2012, 08:43 Travis CaveSpent Target VaultStandard Operation  Spent targets to F-308sAll targets in the mini storage have been
moved to F-308s and those flasks have been
moved over to rad waste. The transfer of
  
ELOG V2.9.2-2455