ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
31
|
Thursday, September 29, 2011, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#36 | Spent target move | The spent Ta#36 has been moved to the storage
vault. It was placed in pail #90, and placed
into slot 3B, it was 111mSv/hr upon removal |
|
32
|
Monday, October 03, 2011, 11:00 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#2 | Move from west station to south hot cell | TM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well. |
|
34
|
Monday, October 03, 2011, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TaC#1 | Electrical check | TM#1 with TaC#1 installed passed the electrical
test. With a value of 882MOhms that was meggered
from the heat shield to the chassis, all |
|
35
|
Tuesday, October 04, 2011, 14:13 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Move ot TM#1 | Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station. |
|
36
|
Wednesday, October 05, 2011, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#2 | Spent target move | The spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal |
|
37
|
Tuesday, October 25, 2011, 08:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Electrical check | TM#4 with SiC#26 HP has been checked electrically
it has passed. It was noted that the Megger
check of the Oven to Chassis (earth ground) |
|
38
|
Tuesday, October 25, 2011, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 with SiC#26 HP has been moved from
the south hot cell to the conditioning station. |
|
40
|
Friday, October 28, 2011, 08:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 moved from conditioning station to
south hot cell. For further leak checking. |
|
45
|
Monday, October 31, 2011, 08:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 with SiC#26 HP moved from the south
hot cell to the conditioning station. |
|
48
|
Friday, November 04, 2011, 11:12 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 with SiC#26 HP move from the conditioning
station to the East Target Station, move
went well. |
|
49
|
Thursday, November 10, 2011, 14:33 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | For the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows: |
|
50
|
Monday, November 14, 2011, 14:07 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Module move | TM#1 with TaC#1 from the west target station
to the south hot cell. Move went well. |
|
51
|
Tuesday, November 15, 2011, 13:08 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | | Move ot TM#1 | TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well. |
|
54
|
Thursday, November 17, 2011, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | TaC#1 | Spent target move | TaC#1 was moved from the south hot cell
to the storage vault. It was placed in pail#92
and put in vault slot 7B. It was 239mSv/hr |
|
55
|
Thursday, November 17, 2011, 11:52 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 moved from the conditioning station
to the south hot cell. Move went well. |
|
56
|
Friday, November 18, 2011, 09:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#3 | Electrical check | Electrical checks of TM#1 with UCx#3 have
been completed. They all appear to be with
in operational range. All megger checks were |
|
58
|
Friday, November 18, 2011, 11:09 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 has been moved from the
south hot cell to the conditioning station.
Move went well. |
|
62
|
Thursday, November 24, 2011, 10:39 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well. |
|
63
|
Thursday, November 24, 2011, 10:40 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#3 | Module move | TM#1 with UCx#3 moved from the conditioning
station to the west target station. |
|
64
|
Thursday, December 15, 2011, 13:08 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | Spent target assay completed. A total of
16 target were looked at, 13 were low enough
to be assayed and those 13 are at shippable |
|