Sunday, October 06, 2013, 00:17 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | high voltage conditioning | high voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro |
|
|
2547
|
Friday, February 16, 2024, 11:48 |
David Wang | Cooling | Maintenance | | | high active water transferr to holding tank | 100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding |
|
|
2559
|
Thursday, April 04, 2024, 13:10 |
David Wang | Cooling | Maintenance | | | high active water refurbishment, reinstallation, and test operation. | both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system |
|
|
2306
|
Wednesday, February 16, 2022, 15:19 |
Frank Song | Cooling | Repair | | | high active cooling water valves repaired/replaced | A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD |
|
|
294
|
Thursday, April 11, 2013, 07:18 |
David Wang | Conditioning Station | Maintenance | TM1 | Ta#29 | helium pressure tested all water lines in TM1 at CS | On April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found. |
|
|
109
|
Tuesday, May 22, 2012, 10:00 |
David Wang | Conditioning Station | Standard Operation | TM4 | sic 27 | helium pressure test on heat shield circuit | I did a helium pressure test on heat shield
circuit. The leak detector is concected to
the TM4 primary vacuum system.The IG1 is |
|
|
2285
|
Thursday, January 06, 2022, 13:54 |
David Wang | ITE | Standard Operation | TM4 | | helium pressure test on TM4 internal cooloing lsine at ITE. | Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec. |
|
|
728
|
Friday, August 08, 2014, 08:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | helium pressure test on TM4 HS water line at CS. | Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. |
|
|
2340
|
Thursday, June 23, 2022, 13:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#64 | helium pressure test on TM4 HS line. | With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested |
|
|
2277
|
Thursday, November 25, 2021, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#63. | helium pressure test on TM4 HS line at TCS. | Helium pressure test on TM4 HS line at
TCS is done. LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS |
|
|
716
|
Monday, July 28, 2014, 14:37 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D)and -(C)water lines. |
TM2 installed in Conditioning
Station
Varian Leak detector
connected directly to Target Module 2 |
7x |
|
601
|
Monday, February 17, 2014, 09:32 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater +(D) water line. | I did the helium pressure test on Tube
heater+ line this morning. The vacuum on
CS and TM2 are very good. The base lake rate |
6x |
|
814
|
Friday, December 05, 2014, 11:58 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D) water lines. | At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied |
6x |
|
710
|
Monday, July 21, 2014, 13:11 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | The TM1 HS line is pressure tested
this morning with 70 psi helium at
CS. No response has been found on leak detector. |
|
|
741
|
Friday, September 05, 2014, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response |
|
|
609
|
Tuesday, February 25, 2014, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | I did the helium pressure test
on TM2 tube heater (+) water line with
blank off(C-seal) installed on water |
10x |
|
2508
|
Wednesday, November 29, 2023, 12:45 |
Carla Babcock | ITE | Standard Operation | | | gas lines pumped down | Pumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator |
|
|
2449
|
Tuesday, May 30, 2023, 12:30 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | gas lines pump out in ITW Faraday Cage | Gas lines pumped |
|
|
2448
|
Tuesday, May 30, 2023, 12:23 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | gas lines pump out in ITE Faraday Cage | argon is being supplied at 6 psi to TM4. |
|
|
564
|
Tuesday, December 03, 2013, 10:35 |
Travis Cave | ITW | Standard Operation | | | fields above and in the target station with blocks off | The blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level |
|