  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  492   Sunday, October 06, 2013, 00:17 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2high voltage conditioninghigh voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro
  
  2547   Friday, February 16, 2024, 11:48 David WangCoolingMaintenance  high active water transferr to holding tank100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding
  
  2559   Thursday, April 04, 2024, 13:10 David WangCoolingMaintenance  high active water refurbishment, reinstallation, and test operation. both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system
  
  2306   Wednesday, February 16, 2022, 15:19 Frank SongCoolingRepair  high active cooling water valves repaired/replaced A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD
 RETURN_drain_valve_in_ITE.jpgFEBIAD_COIL_in_ITW.jpgENTRANCE_COLLIMATOR_RETURN_in_ITW.jpgMAIN_S_and_R_VALVES_in_ITW.jpg 
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CSOn April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found.
  
  109   Tuesday, May 22, 2012, 10:00 David WangConditioning StationStandard OperationTM4sic 27helium pressure test on heat shield circuitI did a helium pressure test on heat shield
circuit. The leak detector is concected to
the TM4 primary vacuum system.The IG1 is
  
  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec.  
  
  728   Friday, August 08, 2014, 08:47 David WangConditioning StationStandard OperationTM4UCx #10helium pressure test on TM4 HS water line at CS.Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. 
 015.JPG012.JPG016.JPG014.JPG 
  2340   Thursday, June 23, 2022, 13:04 David WangConditioning StationStandard OperationTM4Ta#64helium pressure test on TM4 HS line. With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested
  
  2277   Thursday, November 25, 2021, 10:33 David WangConditioning StationStandard OperationTM4Ta#63. helium pressure test on TM4 HS line at TCS. Helium pressure test on TM4 HS line at
TCS is done.  LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS
  
  716   Monday, July 28, 2014, 14:37 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D)and -(C)water lines.
    TM2 installed in Conditioning
Station
    Varian Leak detector
connected directly to Target Module 2   
 7x 
  601   Monday, February 17, 2014, 09:32 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater +(D) water line.I did the helium pressure test on Tube
heater+ line this morning. The  vacuum on
CS and TM2 are very good. The base lake rate
 6x 
  814   Friday, December 05, 2014, 11:58 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D) water lines.At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied
 6x 
  710   Monday, July 21, 2014, 13:11 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.The TM1 HS line is  pressure tested
this morning with 70 psi helium  at
CS. No response has been found on leak detector.
  
  741   Friday, September 05, 2014, 07:15 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response
  
  609   Tuesday, February 25, 2014, 10:00 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.I did the helium pressure  test 
on TM2 tube heater (+) water line  with
blank off(C-seal) installed on  water
 10x 
  2508   Wednesday, November 29, 2023, 12:45 Carla BabcockITEStandard Operation  gas lines pumped downPumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator
  
  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage Gas lines pumped  gas_lines_pumped_out_to_ITW.JPG 
  2448   Tuesday, May 30, 2023, 12:23 Frank SongITEStandard OperationTM4TiC#5gas lines pump out in ITE Faraday Cageargon is being supplied at 6 psi to TM4.   Argon_supplied_at_6psi_to_TM4_in_ITE.JPG 
  564   Tuesday, December 03, 2013, 10:35 Travis CaveITWStandard Operation  fields above and in the target station with blocks offThe blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level
  