Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 141 of 141  Not logged in ELOG logo
  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  2794   Thursday, April 24, 2025, 12:53 Aaron TamNorth Hot-CellStandard OperationTM4UC#48UC#48 IGLIS Install onto TM4C. Fisher, A. Schmidt, A. Tam
UC#48 Handover satisfactory

    Target taken out of glovebox
 Misaligned_target_leg.jpg86b48e1a-3507-4650-864b-841e638ab62e.jpg 
  2798   Friday, May 02, 2025, 10:16 Aaron TamNorth Hot-CellMaintenance  NHC Window Oil FillFindings

    During April 2025 safety
walk ID: 2796 , it was noted that the
 12x 
  2802   Wednesday, May 07, 2025, 13:41 Aaron TamNorth Hot-CellStandard OperationTM2UC#49 UC#49 SIS w/ Gasline InstallMay 7th, 2025 - Aaron Schmidt, Aaron Tam 
UC#49 Handover - good
 Cable_hopped_on_East_Manip.jpgunsuccessful_method_1.jpgunsuccessful_method_2.jpgGasline_Gasket_installed.jpg 
  1897   Monday, March 25, 2019, 10:11 Aaron SchmidtSouth Hot-CellRepairTM2 LP-FEBIAD Test Target (empty) Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
 TM2_-_FEBIAD_target_-_Electrical_Test.pdf 
  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspectionTom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom  has
this inspection record in his file. The crane
  
ELOG V2.9.2-2455