1199
|
Friday, April 08, 2016, 07:13 |
David Wang | ITW | Standard Operation | TM1 | UCx15 | TM1 has been connected in ITW. | After ITW HV test is done, TM1 has been
connected to ITW. Water signals are checked
in electrical room. They are good. |
|
892
|
Monday, April 20, 2015, 10:22 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | TM1 with UCx12 has been connected to CS and ready for conditioing. | The TH will be locked during the TM1 conditioning
time due to an interference issue between
CS HV cover and a gas analysis valve on top |
|
896
|
Thursday, April 23, 2015, 09:08 |
David Wang | Conditioning Station | Maintenance | TM1 | UCx12 | Huge Leak on TM1 contaiment box window. | There is a huge leak on TM1 containment
box window. I did a 70 psi helium pressure
test on all TM1 water circuits this morning. |
|
898
|
Monday, April 27, 2015, 10:28 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | TM4 has been partially disconnected at CS. | TM1 has been partially disconnected at
CS for tomorrow move. The CS TP1S is still
running and will be stopped and disconnected |
|
901
|
Tuesday, April 28, 2015, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | CS and TM1 was vented with Argon gas | Dan and I vented CS and TM1 with Argon
gas before it is moved this morning. |
|
902
|
Tuesday, April 28, 2015, 10:26 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | ITW target pit o-ring seal replacement. | Dan and I replaced ITW target pit o-ring
seal(.275DIA X42"ID). It is an annual
job before first beam to ITW. The old o-ring |
|
905
|
Tuesday, April 28, 2015, 17:17 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | TM1 has been connected in ITW. | TM1 has been connected in ITW. Five turbo
pumps have been started. The TM1 containment
box window line is capped on the service |
|
916
|
Friday, May 22, 2015, 15:44 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. I checked all ITW
water signals, and they are good. ITW |
|
791
|
Tuesday, November 18, 2014, 11:14 |
David Wang | South Hot-Cell | Standard Operation | | UCx11 | crane down UCx 11 target into SHC from TH | I craned down UCx11 target from TH into
SHC. Chad was in SHC service area watching
on it. The source tray moving jig was installed |
|
797
|
Thursday, November 20, 2014, 14:12 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | TM4 is connected in ITE. | TM4 has been connected connect in ITE.
Water is supplied to TM4 module only. |
|
798
|
Thursday, November 20, 2014, 14:13 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx11 | CS and TM4 was vented with Argon gas | CS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE. |
|
801
|
Tuesday, November 25, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
733
|
Wednesday, August 13, 2014, 12:21 |
David Wang | ITE | Repair | TM4 | UCx10 | ITE TP4S is replaced | ITE TP4S was broken down last night . I
stopped the ITE pumps and vented station
with Argon this morning. Edi and I replaced |
|
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on | The UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current |
|
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started | The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo |
|
194
|
Tuesday, October 09, 2012, 13:44 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | NiO#1 removal UCx#5 installation | NiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and |
|
195
|
Tuesday, October 09, 2012, 14:53 |
Bevan Moss | Conditioning Station | Development | TM4 | UCx#5 | Module Move | TM4 was remote moved from the SCH to the
TCS today. This was the first time the module
was moved with the framework for the cage |
|
197
|
Wednesday, October 24, 2012, 11:51 |
Travis Cave | ITE | Standard Operation | TM4 | UCx#5 | module moved | Yesterday TM#4 with UCx#5 was moved to
the east target station from the conditioning
station, move went well. |
|
219
|
Tuesday, December 04, 2012, 13:27 |
Travis Cave | ITE | Standard Operation | TM4 | UCx#5 | module move & electrical check | TM#4 with UC#5 has been moved from east
target station to the south hot cell move
went well. Also the electrical check |
|
221
|
Tuesday, December 04, 2012, 14:20 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | UCx#5 Removal | UCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail |
|