Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 13 of 138  Not logged in ELOG logo
Entry  Friday, April 08, 2016, 07:13, David Wang, ITW, Standard Operation, TM1, UCx15, TM1 has been connected in ITW. 
After ITW HV test is done, TM1 has been connected to ITW. Water signals are checked in electrical room. They are good.
Entry  Monday, April 20, 2015, 10:22, David Wang, Conditioning Station, Standard Operation, TM1, UCx12, TM1 with UCx12 has been connected to CS and ready for conditioing. 
The TH will be locked during the TM1 conditioning time due to  an interference issue between CS HV cover and a gas analysis valve on top of TM1.
A work permit has been issued for the conditioning job because of it.
Entry  Thursday, April 23, 2015, 09:08, David Wang, Conditioning Station, Maintenance, TM1, UCx12, Huge Leak on TM1 contaiment box window. 006.JPG008.JPG011.JPG009.JPGTM1_leak_check_at_CS_2015-04-23.pdf
There is a huge leak on TM1 containment box window. I did a 70 psi helium pressure test on all TM1 water circuits this morning. The LD base leak rate
was 0.0XE-9 atm.cc/sec. When applying the 70 psi helium to containment box window circuit, the leak rate on LD jumped to 1XE-4 atm.cc/sec in 5 seconds.I
released the helium source right away,t but the conditioning station is full of helium  molecules already, and the leak rate on LD stays at 1xE-5
Entry  Monday, April 27, 2015, 10:28, David Wang, Conditioning Station, Standard Operation, TM1, UCx12, TM4 has been partially disconnected at CS. 
TM1 has been partially disconnected at CS for tomorrow move. The CS TP1S is still running and will be stopped and disconnected tomorrow morning.
Entry  Tuesday, April 28, 2015, 10:21, David Wang, Conditioning Station, Standard Operation, TM1, UCx12, CS and TM1 was vented with Argon gas  
Dan and I vented CS and TM1 with Argon gas before it is moved this morning.
Entry  Tuesday, April 28, 2015, 10:26, David Wang, ITW, Standard Operation, TM1, UCx12, ITW target pit o-ring seal replacement. 
Dan and I replaced ITW target pit o-ring seal(.275DIA X42"ID). It is an annual job before first beam to ITW. The old o-ring was moved and the groove
was vacuum cleaned. The new o-ring has been installed properly.
Entry  Tuesday, April 28, 2015, 17:17, David Wang, ITW, Standard Operation, TM1, UCx12, TM1 has been connected in ITW. 
TM1 has been connected in ITW. Five turbo pumps have  been started. The TM1 containment box window line is capped on the service cap and the line
is pump town to E-4 torr range.
Entry  Friday, May 22, 2015, 15:44, David Wang, ITW, Standard Operation, TM1, UCx12, 5 Shielding blocks have been transferred from ITE to ITW. 
5 shielding blocks have been transferred from ITE to ITW. I  checked all ITW water signals, and they are good.  ITW is configured to take proton
beam.
Entry  Tuesday, November 18, 2014, 11:14, David Wang, South Hot-Cell, Standard Operation, , UCx11, crane down UCx 11 target into SHC from TH 
I craned down UCx11 target from TH into SHC. Chad was in SHC service area watching on it. The source tray moving jig was installed on the crane for this
moving.
Entry  Thursday, November 20, 2014, 14:12, David Wang, ITE, Standard Operation, TM4, UCx11, TM4 is connected in ITE. 
TM4 has been connected connect in ITE. Water is supplied to TM4 module only.
Entry  Thursday, November 20, 2014, 14:13, David Wang, Conditioning Station, Standard Operation, TM4, UCx11, CS and TM4 was vented with Argon gas 
CS and TM4 was vented with Argon gas this morning before it was moved from CS to ITE.
Entry  Tuesday, November 25, 2014, 12:45, David Wang, ITE, Standard Operation, TM4, UCx11, 5 Shielding blocks have been transferred from ITW to ITE. 
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam.
Entry  Wednesday, August 13, 2014, 12:21, David Wang, ITE, Repair, TM4, UCx10, ITE TP4S is replaced 
ITE TP4S was broken down last night . I stopped the ITE pumps and vented station with Argon this morning. Edi and I replaced the broken pump with a new
pump. The ITE is under roughing now.
Entry  Wednesday, July 16, 2014, 13:56, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#9, UCx#9 off Ta on 
The UCx#9 target has been revomed from the target module...leg A was broken as suspected.
Ta#42 has been installed. High current connection fasteners torqued to 150 in lbs.
Entry  Tuesday, June 25, 2013, 14:56, Bevan Moss, Conditioning Station, Standard Operation, TM1, UCx#6, Roughing Pumps Started 
 The roughing pumps have been started on the conditioning station. As it is late in the day for David he will make the turbo pump connections tomorrow.
Entry  Tuesday, October 09, 2012, 13:44, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#5, NiO#1 removal UCx#5 installation IMG_0780[1].JPG
NiO#1 was removed this morning.
UCx#5 was inserted into the hot cell around 1 pm, installed and leak checked and ready to go to the conditioning station 1:40pm
did have a little trouble with the 9 pin connector. It had to be lossened to get it to mate properly. It was le-tightened once the proper fit was
Entry  Tuesday, October 09, 2012, 14:53, Bevan Moss, Conditioning Station, Development, TM4, UCx#5, Module Move 
TM4 was remote moved from the SCH to the TCS today. This was the first time the module was moved with the framework for the cage in place. The ion gauge
on the service cap is closer to the cage than anticipated and as a result the pins for the gauge were sheared off. Discussion as to how to repair the gauge
(both short term and long term needs to be had). We will try and rough down the TM tonight, it is not believed the vacuum will be affected.
Entry  Wednesday, October 24, 2012, 11:51, Travis Cave, ITE, Standard Operation, TM4, UCx#5, module moved 
Yesterday TM#4 with UCx#5 was moved to the east target station from the conditioning station,  move went well.
Entry  Tuesday, December 04, 2012, 13:27, Travis Cave, ITE, Standard Operation, TM4, UCx#5, module move & electrical check UC#5_SIS_Post_beam.PDF
TM#4 with UC#5 has been moved from east target station to the south hot cell move went well.  Also the electrical check post beam was done on the
module see attached pdf for the results.
Entry  Tuesday, December 04, 2012, 14:20, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#5, UCx#5 Removal 
UCx #5 has been removed from TM4. The left oven leg is indeed broken.
Target has been placed in a pail with an argon feed.
ELOG V2.9.2-2455