Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 138 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini VaultFive pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present
 MiniVault_2024-12-18.pdf 
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - InspectionAn informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main
 ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf 
  2738   Friday, January 03, 2025, 09:59 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target HallA safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be
  
  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations
  
  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readingsITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this
  
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target MoveUC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault 
 Target_Index_2025-01-13.pdf 
  2749   Thursday, January 16, 2025, 10:03 Travis CaveSpent Target VaultStandard Operation UC#47Spent Target Move The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault,
 Target_Index_2025-01-16.pdf 
  2751   Monday, January 20, 2025, 11:33 Adam NewsomeWaste Package/ShipStandard Operation   F-308 flask loading - six flasks loaded Today (2025-01-20), six flasks were loaded
in preparation for   shipment with the following
targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10,
 Target_Index_2025-01-20.xlsm 
  2752   Tuesday, January 21, 2025, 10:46 David WangITE/ITWStandard Operation  ITW/ITE pit general annual cleaning up.ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum  cleaned. HV cage
  
  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages  David and I cleaned both cages in
ISAC1 electric room, all done.
  
  2754   Monday, January 27, 2025, 08:27 om David WangSouth Hot-CellMaintenance parasite targetTransfer parasite target from SHC to NHC.A parasite target has been transferred
from SHC to NHC. It is a job to reduce SHC
field for coming SHC entry job. The transfer
  
ELOG V2.9.2-2455