Friday, November 08, 2024, 10:39, Travis Cave, Spent Target Vault, Standard Operation, , TiC#9, Spent Target Move
|
TiC#9 was placed in Pail 299 in spot 8A of the vault and was 92.1mSv/hr when removed from the south hot cell. See attached pdf for full vault details. |
Friday, November 08, 2024, 10:54, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9, TiC#9 Pail Loading into Pail#299
|
Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting to remove multipin connector bracket
Assistance from Chad required for the rest of procedure |
Monday, November 18, 2024, 12:18, Aaron Tam, South Hot-Cell, Repair, , , SHC West Manipulator Repair
|
November 14, 2024 - Aaron Tam w/ Chad Fisher
Following ID: 2716
"Nov. 8, 2024 - Aaron Tam |
Thursday, November 28, 2024, 16:13, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9 Parasitics, TiC#9 Parasitics Leak Check and removal from hotcell    
|
November 27th, 2024 - Aaron Tam with Farran & David
Parasitic Assembly Leak Check (Aaron, Farran, David)
-Note that the furthest upstream (right of the target) parasitic top cap screws had been loosened and retightened in |
Wednesday, December 04, 2024, 14:30, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Ta#68 PIE 32x
|
Abstract:
This target has seen some irregular beam patterns
Possibility that the beam hit the walls of the target tube or even the cooling fins |
Thursday, December 05, 2024, 11:43, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Pail loading - Ta#68 & Others into Pail#300    
|
December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane
Hot Cell Prep:
Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening
Loading: |
Thursday, December 05, 2024, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#68, Spent target move - Ta#68 in Pail 300
|
Ta#68 spent target was moved in Pail 300 to storage vault location 5A. The dose rate measured at the South Hot Cell was 429 mSv/h at 1m. The target index
spreadsheet has been updated and the current vault configuration is attached to this e-log. At this time, the storage vault is getting quite full - it
is planned to remove five pails in January 2025. |
Wednesday, December 18, 2024, 12:18, Adam Newsome, Spent Target Vault, Standard Operation, , , Five Pails Transferred from Main Vault to Mini Vault
|
Five pails were transferred from main vault to mini vault. Note that there was already one pail in the mini vault, so at present there are six pails
staged for packaging into F-308s.
Nb#10, Pail 295, Tray 4A |
Wednesday, December 18, 2024, 14:17, Adam Newsome, Pail Handling Tool, Maintenance, , , Pail Handling Tool - Inspection
|
An informal inspection of the main Pail Handling Tool was performed today as the final one for the year. Note that the main formal annual inspection
was performed June 18, 2024 for this year.
The attachment to this e-log serves as a record of all inspections for this tool throughout 2024. |
Friday, January 03, 2025, 09:59, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround complete - ISAC Hot Cells, Target Hall
|
A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Friday, January 03, 2025, 12:34, Frank Song, 5 Shielding Blocks, Maintenance, , UCx#47, shielding blocks moving
|
Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025
winter shut down . |
Thursday, January 09, 2025, 11:08, David Wang, Facilities, Maintenance, , , ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings
|
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced
in March when general fielding in vacuum pit is reasonable for the job. |
Monday, January 13, 2025, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#46, Spent Target Move
|
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault
details. |
Thursday, January 16, 2025, 10:03, Travis Cave, Spent Target Vault, Standard Operation, , UC#47, Spent Target Move
|
The spent UC#47 was moved from the south hot cell to the spent target vault placed in pail #302 in spot 1C of the vault, it was 24.5mSv/hr when
removed from the south hot cell. See attached for vault details. |
Monday, January 20, 2025, 11:33, Adam Newsome, Waste Package/Ship, Standard Operation, , , F-308 flask loading - six flasks loaded
|
Today (2025-01-20), six flasks were loaded in preparation for shipment with the following targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, SiC#44
Some of the pails (256, 273, 279, 277) required replacement of the wire rope cable with new style, 30 ft length, as requested by CNL. A lifting
label was also applied to these pails. Some of the pails (295, 298) already had the appropriate cable and lifter label. |
Tuesday, January 21, 2025, 10:46, David Wang, ITE/ITW, Standard Operation, , , ITW/ITE pit general annual cleaning up.
|
ITW/ITE pit general annual cleaning up were done. all concrete floor and TM equipment surface are vacuum cleaned. HV cage inside and blue nylon
insulators were wiped by paper. |
Wednesday, January 22, 2025, 10:29, Frank Song, Faraday Cage, Maintenance, , , Annual clean up for ITE/ITW Faraday cages
|
David and I cleaned both cages in ISAC1 electric room, all done. |
Monday, January 27, 2025, 08:27, om David Wang, South Hot-Cell, Maintenance, , parasite target, Transfer parasite target from SHC to NHC.
|
A parasite target has been transferred from SHC to NHC. It is a job to reduce SHC field for coming SHC entry job. The transfer is successful. |
Wednesday, January 29, 2025, 09:06, David Wang, ITE/ITW, Standard Operation, , , ITE and ITW water system paddle wheels and coils on flow sensors have been replaced
|
ITE and ITW water system paddle wheels and coils on all flow sensors in pits have been replaced. It's a SAS job. |
Wednesday, January 29, 2025, 11:10, chad fisher, South Hot-Cell, Standard Operation, , , Pre-entry field Check
|
Fields in the hot cell were checked using a pole monitor. Field approximately in the area someone would stand to repair manip. is 3.8 mSv/h
Hot item found! Bag with extraction electrode and high current fasteners from an online target. |
|