Wednesday, December 04, 2024, 14:30, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Ta#68 PIE 32x
|
Abstract:
This target has seen some irregular beam patterns
Possibility that the beam hit the walls of the target tube or even the cooling fins |
Thursday, December 05, 2024, 11:43, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Pail loading - Ta#68 & Others into Pail#300
|
December 5, 2024 - Aaron Tam w/ help from Chad, Peter and Adam at the Crane
Hot Cell Prep:
Tools organized, working space cleared, spot for clean tool to sit placed, Air tool is open and spinning clockwise for tightening
Loading: |
Monday, March 25, 2019, 10:11, Aaron Schmidt, South Hot-Cell, Repair, TM2, , LP-FEBIAD Test Target (empty)
|
Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
Monday, March 25, 2019, 10:00: Target electrical checks (See Attachment 1) |
Thursday, January 25, 2024, 07:24, David Wang, Crane, Standard Operation, , , targe hall annual crane inspection
|
Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has
been issued for 2024. |
|