Wednesday, June 26, 2024, 13:49, David Wang, Conditioning Station, Standard Operation, TM2, , Tm2 has been moved from SW silo to TCS.
Tuesday, July 02, 2024, 11:38, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer
Wednesday, July 03, 2024, 14:01, David Wang, Conditioning Station, Standard Operation, TM2, , Tm2 has been moved from TCS to SW silo.
Friday, July 05, 2024, 14:13, Adam Newsome, Waste Package/Ship, Standard Operation, , , F-308 flask loading - five flasks loaded
Tuesday, July 09, 2024, 16:14, Carla Babcock, ITE, Repair, , , Attempts to reduce ITE:EL trips from HV sparks
8x
Wednesday, July 10, 2024, 09:55, Adam Newsome, Safe Module Parking, Maintenance, , , Annual electrical and mechanical inspection of Safe Module Parking
Wednesday, July 10, 2024, 10:44, Riley Sykes, South Hot-Cell, Maintenance, , , Spring idler install
Friday, July 12, 2024, 08:51, Riley Sykes, Safe Module Parking, Maintenance, , , SMP chain guard
Wednesday, July 17, 2024, 15:06, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround Complete - SHC/NHC Area
Wednesday, July 24, 2024, 10:10, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer
Thursday, September 05, 2024, 12:50, Adam Newsome, Crane, Maintenance, , , Overhead crane: up/down hoist delayed start issue
Wednesday, September 11, 2024, 13:38, Adam Newsome, North Hot-Cell, Repair, , , Spare Manipulator - Y-axis motion not functioning
Monday, September 16, 2024, 08:23, chad fisher, North Hot-Cell, Repair, , , Model N Remote end #9352 reapir
Monday, September 16, 2024, 08:48, chad fisher, Manipulator Maintenance, Maintenance, , , CRL Technicain Manipulator Maitenance Trip
Monday, September 23, 2024, 11:26, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 window line has been leak checked.
Monday, September 23, 2024, 11:31, David Wang, South Hot-Cell, Development, TM3, , 10 pins lectrical check result after insulator is installed on water cap C.
Monday, September 23, 2024, 16:06, Aaron Tam, South Hot-Cell, Repair, TM3, , Insulator Addition to Water block
Tuesday, September 24, 2024, 09:37, Frank Song, ITE/ITW, Standard Operation, , , shielding blocks transfer
Wednesday, September 25, 2024, 07:25, David Wang, Cooling, Maintenance, , , HALCW O2 level sensor maintenance.
Wednesday, September 25, 2024, 09:12, David Wang, South Hot-Cell, Maintenance, TM3, , Tm3 has been moved from SHC to silo.