Entry  Wednesday, August 03, 2011, 11:24, Travis Cave, ITW, Standard Operation, TM1, Ta#37, Module move 
TM#1 with Ta#37 has been moved from the conditioning station to the the west target station, move went well.
Entry  Tuesday, August 02, 2011, 09:41, Pierre Bricault, Conditioning Station, Repair, TM1, ITW-TM1-Ta#37-LP-SIS, Test high voltage on TM1 
 TM1 has received the Ta#37-LP and has been pumping since thursday. This morning the pressure gauges read, IMG1: 1.6x10^-6 T and IG1: 7.4x10^-7
T.
The high voltage power supply has been connected to all high voltage feedthroughs and the voltage raise to 42 kV. 
Entry  Thursday, July 28, 2011, 14:07, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#37, Module move 
Tm#1 with Ta#37 moved from the south hot cell to the conditioning station. Move went well.
Entry  Thursday, July 28, 2011, 12:02, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#37, Electrical check Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
TM#1 has passed the the electrical check.
Entry  Wednesday, July 27, 2011, 14:34, Travis Cave, South Hot-Cell, Standard Operation, TM1, , Module move 
TM#1 has been moved from the Conditioning Station to the South Hot Cell for the installation of Ta#37.
Entry  Monday, July 25, 2011, 14:49, Travis Cave, Spent Target Vault, Standard Operation, , Ta#35, Spent target move 
Ta#35, in pail #88, has been place into spent target storage, in spot 6C. Upon removal from the South Hot Cell it was 411mSv/hr our hottest target to
be placed into storage to date. There are 8 free slots for targets left in the vault.
Entry  Thursday, July 21, 2011, 17:39, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs IMG_1681.JPGIMG_1662.JPGIMG_1686.JPGIMG_1695.JPG
Over the period of July 20-21st TM1 had several repairs completed and tested. The easiest of the repairs was the installation
of a gasket and a blank off. The next repair was to replace the 2 oring on the side panels that were removed for inspection and repair. The instrument
panel oring was replaced again and the previous one measured. Both were found to have the correct diameter of 0.131 inches for the seal groove. When attempting
    Reply  Friday, July 22, 2011, 10:30, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs 


    
        
            Bevan Moss wrote:
        
        
            
            Over the period of July 20-21st TM1 had several repairs completed and
Entry  Wednesday, July 20, 2011, 09:55, Travis Cave, ITE, Standard Operation, TM4, Ta#36, Move of TM#4 from South Hot Cell to East Target Station. 
Move completed, move went well.
Entry  Tuesday, July 19, 2011, 13:51, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#36, TM4 Ta#36 Leak Check Results DOC.PDF
Tm4 w/ Ta#36 has been vacuum leak checked using the standard leak check procedure.
At 1:45pm RH was contacted to notify them that TM4 is ready to move.
Entry  Tuesday, July 19, 2011, 12:25, maicodallavalle, South Hot-Cell, Standard Operation, TM4, Ta36, TM4 Ta36 Target was put into the south hot cell. 
Ta36 was check by Maico and Chad.It was then carried into the anteroom.From the anteroom it was transferred into the south hot cell.
Entry  Tuesday, July 19, 2011, 12:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#36, Electrical check TM#4_SIS_Elec_Check2.pdf
See attached PDF for the details.
Entry  Tuesday, July 19, 2011, 11:52, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#36, New target Ta#36 Installed on TM4 DSC_0897.JPGDSC_0899.JPGDSC_0901.JPGDSC_0905.JPG
Ta#36 has been installed on TM4 and is awaiting leak and electrical check.
A small piece of the standard top insulator ITA3376 broke off during removal of Ta#35 (indicated with a blue circle on attached pictures).
"JP's connector, ITA2493 showed the usual and as yet undiagnosed "arc" mark (picture to follow).
Entry  Tuesday, July 19, 2011, 11:17, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#35, Move of TM#4 from East target station to south hot cell. 
Move went well no problems readings at East Target Station were very high at 500mSv/hr.
Entry  Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status 
Friday June 24 2011
The target module has been moved to the Conditioning Station (CS)
Pumping overnight