399
|
Tuesday, July 09, 2013, 14:26 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks had been transferred from ITE to ITW |
5 shielding blocks had been transferred from ITE to ITW. The ITW is configured to take proton beam. |
1943
|
Friday, June 14, 2019, 08:15 |
David Wang | ITE | Standard Operation | TM2 | | 5 shielding blocks are moved to ITE. |
ITE is configured to take proton beam. |
2042
|
Tuesday, January 07, 2020, 09:37 |
David Wang | ITW | Standard Operation | | | 5 shielding blocks are moved out of ITW top. |
5 shielding blocks are moved out of itw top. |
374
|
Tuesday, June 04, 2013, 12:36 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks are transferred from ITW to ITE |
Dan an I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam. |
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. |
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
734
|
Wednesday, August 20, 2014, 10:25 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. |
5 Shielding blocks have been transferred from ITW to ITE. ITE is configured to take proton beam.
|
801
|
Tuesday, November 25, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM4 | UCx11 | 5 Shielding blocks have been transferred from ITW to ITE. |
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
884
|
Friday, April 10, 2015, 15:40 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. |
5 shielding blocks have been transferred to ITE. The ITE is configured to take proton beam. |
954
|
Friday, June 19, 2015, 11:52 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | 5 Shielding blocks have been transferred from ITW to ITE. |
5 shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
1091
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. |
The ITE is configured to take proton beam. |
1092
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. |
The ITE is configured to take proton beam. |
1268
|
Monday, June 27, 2016, 13:45 |
David Wang | ITE | Standard Operation | | | 5 Shielding blocks have been transferred from ITW to ITE. |
ITE is configured to take proton beam. |
1319
|
Monday, August 15, 2016, 10:08 |
David Wang | ITE | Standard Operation | TM4 | UC#17 | 5 Shielding blocks have been transferred from ITW to ITE. |
Dan and I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam. |
1368
|
Tuesday, October 04, 2016, 09:18 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITW to ITE. |
The ITE is configured to take proton beam. |
683
|
Tuesday, June 17, 2014, 10:46 |
David Wang | ITW | Standard Operation | TM1 | UC#9 | 5 Shielding blocks have been transferred from ITE to ITW. |
5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also. |
749
|
Tuesday, September 16, 2014, 10:41 |
David Wang | ITW | Standard Operation | TM1 | ZrC #4 | 5 Shielding blocks have been transferred from ITE to ITW. |
5 Shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam |
785
|
Thursday, November 13, 2014, 13:52 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | 5 Shielding blocks have been transferred from ITE to ITW. |
Dan and I transferred 5 shielding blocks from ITE to ITW. The ITW is configured to take proton beam. |
859
|
Thursday, March 12, 2015, 13:04 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITE to ITW. |
5 shielding blocks have been transferred from ITE to ITW for next week TM4 move. |
916
|
Friday, May 22, 2015, 15:44 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | 5 Shielding blocks have been transferred from ITE to ITW. |
5 shielding blocks have been transferred from ITE to ITW. I checked all ITW water signals, and they are good. ITW is configured to take proton beam. |
1063
|
Tuesday, September 08, 2015, 10:11 |
David Wang | ITW | Standard Operation | TM2 | ZrC | 5 Shielding blocks have been transferred from ITE to ITW. |
Maico and Dan moved 5 shielding blocks from ITE to ITW. The ITW is configured to take proton beam. |