2309
|
Friday, February 25, 2022, 10:22 |
Adam Newsome | South Hot-Cell | Development | | | Addition of E-Stops and Turntable Vertical Motion Limit Switch | Two changes have been made to the control
system to the South Hot Cell:
Addition of two emergency |
|
|
2344
|
Monday, July 04, 2022, 11:54 |
Nadia Jorgenson | Spent Target Vault | Maintenance | | | Added Lubrication,fittings need to be changed | Dan lubricated components on the target
storage vault (This was an outstand task
from annual inspection). No issues on the |
|
|
458
|
Thursday, September 19, 2013, 15:56 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities for September 18th and 19th | September 18th
The wiring harness was completed
by Maico and Travis today (see pics) and |
|
|
468
|
Thursday, September 26, 2013, 14:31 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 | September 24
After the manipulator repair
Maico installed the NiO#2 onto the target |
|
|
470
|
Thursday, September 26, 2013, 14:42 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 |
|
|
|
460
|
Monday, September 23, 2013, 16:10 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities Sept 20 - 23 2013 | September 20th
Today was a trying day. When attempting
to make the water line connections for the |
|
|
823
|
Monday, December 15, 2014, 15:55 |
Grant Minor | Conditioning Station | Repair | | | Access to ISAC TCS TK2 Expansion Tank - Fall Arrest | Hello all,
Access was required this morning to |
|
|
1521
|
Thursday, May 04, 2017, 14:06 |
David Wang | Conditioning Station | Repair | TM3 | | A vacuum to air leak on TM3 service cap round side panel was found and fixed.. | During TM3 roughing down yesterday afternoon,The
vacuum gauges CG1 and CG1S stopped at 1.20
torr and refused to drop down. Leak detector |
|
|
2378
|
Monday, October 17, 2022, 08:07 |
David Wang | ITE/ITW | Repair | TM4 | | A small leak on target station secondaryvacuum back up line by ITH MP1S. |
A small leak in target station |
|
|
1357
|
Tuesday, September 20, 2016, 11:48 |
David Wang | Assembly/Bench Test | Development | | | A silo and blue steel frame are removed out of TH | A silo and blue steel frame are removed
out of TH this morning. They are transferred
through ante room, and moved to experimental |
|
|
2574
|
Tuesday, April 30, 2024, 09:20 |
David Wang | ITW | Development | TM4 | | A new SST gas line is using for ITW febiad gas staion in pit. | A new SST gas line with swagelock tube
fittings and VCR fit is using for ITW febiad
gas staion in pit. Gas line is leak checked |
|
|
329
|
Friday, May 03, 2013, 09:53 |
chad fisher | South Hot-Cell | Repair | TM3 | | 9 pin connector wiring | With the aid of nic new manipulator snap
fingers made by Maico the peek cable ties
restraining the 9 pin connector wiring to |
|
|
1993
|
Tuesday, October 01, 2019, 09:23 |
Don Jackson | ITE | Maintenance | TM2 | ZrC #8 | 60KV Common Connections | 1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way.
This should of had no impact on the ZrC run |
|
|
1249
|
Thursday, June 02, 2016, 11:59 |
David Wang | South Hot-Cell | Repair | TM3 | | 5K mega test on TM3 | I did a 5KV mega test on TM3. Only5Mohm
@5kV between coli line PQ and chassis(ground).
It confirmed the close gap between P,Q and |
|
|
1250
|
Thursday, June 02, 2016, 18:04 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | 5K mega test on TM3 |
|
|
|
1252
|
Friday, June 03, 2016, 16:04 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | 5K mega test on TM3 |
|
|
|
330
|
Monday, May 06, 2013, 15:45 |
Bevan Moss | Conditioning Station | Repair | TM3 | | 55 pin connector removed | Travis and I removed the 55 pin connector
from the service cap today. The feed through
was left in place as a new design for the |
|
|
1212
|
Thursday, April 14, 2016, 12:56 |
David Wang | ITW | Standard Operation | TM1 | | 5 shielding blocks have been moved to ITW. | The ITW is configured to take proton beam. |
|
|
447
|
Wednesday, September 11, 2013, 09:35 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks have been moved to ITW | I moved 5 shielding blocks to ITW this
morning .I checked the water signals in electrical
room before the moving, and everything is |
|
|
581
|
Monday, January 20, 2014, 13:35 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks had been moved out of ITE | 5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR |
|