Friday, February 25, 2022, 10:22, Adam Newsome, South Hot-Cell, Development, , , Addition of E-Stops and Turntable Vertical Motion Limit Switch
|
Two changes have been made to the control system to the South Hot Cell:
Addition of two emergency stop buttons: one located in the Target Hall on the wall adjacent to the hot cell, and one located on the
control panel adjacent the operator station.
Addition of limit switches to the turntable's vertical drive system to prevent over-travel at |
Monday, July 04, 2022, 11:54, Nadia Jorgenson, Spent Target Vault, Maintenance, , , Added Lubrication,fittings need to be changed
|
Dan lubricated components on the target storage vault (This was an outstand task from annual inspection). No issues on the main storage vault but we
were not able to lubricate the mini storage vault because the position of the grease nipple on the fittings makes them inaccessible, see attached pictures.
All four should be replaced with 90 deg fittings. |
Thursday, September 19, 2013, 15:56, Bevan Moss, South Hot-Cell, Repair, TM3, , Activities for September 18th and 19th
|
September 18th
The wiring harness was completed by Maico and Travis today (see pics) and was installed into the target module. During installation the bracket
went on with ease. The junction box appeared to be hung up on something but did engage eventually. The plug for the collimator is not quite long enough |
Thursday, September 26, 2013, 14:31, Bevan Moss, South Hot-Cell, Repair, TM3, NiO#2, Activities September 24 - 25
|
September 24
After the manipulator repair Maico installed the NiO#2 onto the target module. Once connected I completed a leak test on the HS line with
Isaac. The leak testing cart would not pump down originally (something wrong with the cart) but eventually it did start to work. The cart pumped to its |
Thursday, September 26, 2013, 14:42, Bevan Moss, South Hot-Cell, Repair, TM3, NiO#2, Activities September 24 - 25
|
Bevan Moss wrote:
September 24 |
Monday, September 23, 2013, 16:10, Bevan Moss, South Hot-Cell, Repair, TM3, , Activities Sept 20 - 23 2013
|
September 20th
Today was a trying day. When attempting to make the water line connections for the window the VCR seal fell off several times. Each time this
happens the seal becomes stuck at the bottom of the containment box. While trying to replace the seal the nut slipped down the line to the bottom of |
Monday, December 15, 2014, 15:55, Grant Minor, Conditioning Station, Repair, , , Access to ISAC TCS TK2 Expansion Tank - Fall Arrest
|
Hello all,
Access was required this morning to the TCS TK2 Expansion Tank to open a valve and re-fill the tank. |
Thursday, May 04, 2017, 14:06, David Wang, Conditioning Station, Repair, TM3, , A vacuum to air leak on TM3 service cap round side panel was found and fixed..
|
During TM3 roughing down yesterday afternoon,The vacuum gauges CG1 and CG1S stopped at 1.20 torr and refused to drop down. Leak detector was used to
found where the problem was. LD was in rough detecting mode and showed 2.7xE-6 atm.cc/sec as base leak rate. Spray medium amount of helium to TM3
service top, and found this leak was on round panel of TM3 side wall. LR climbed to E-4 atm.cc/sec range on helium spraying. In my vie,One 10# socket head |
Monday, October 17, 2022, 08:07, David Wang, ITE/ITW, Repair, TM4, , A small leak on target station secondaryvacuum back up line by ITH MP1S.
|
A small leak in target station secondary vacuum back
up line is observed. It affects ITH CG2S,CG1S and CG4SA. Current draw on TP1s and TP4S is getting higher(above 1A) because of it. An internal leak in
ITH MP1S is suspected by first round investigation. Close watching on system and further investigation are needed.
|
Tuesday, September 20, 2016, 11:48, David Wang, Assembly/Bench Test, Development, , , A silo and blue steel frame are removed out of TH
|
A silo and blue steel frame are removed out of TH this morning. They are transferred through ante room, and moved to experimental hall TM assembly
area for a long term storage. Swipes are done on the silo and frame before and during move. No contamination has been found . |
Tuesday, April 30, 2024, 09:20, David Wang, ITW, Development, TM4, , A new SST gas line is using for ITW febiad gas staion in pit.
|
A new SST gas line with swagelock tube fittings and VCR fit is using for ITW febiad gas staion in pit. Gas line is leak checked on bench. No leak . it
is installed on TM4 in ITW now, |
Friday, May 03, 2013, 09:53, chad fisher, South Hot-Cell, Repair, TM3, , 9 pin connector wiring
|
With the aid of nic new manipulator snap fingers made by Maico the peek cable ties restraining the 9 pin connector wiring to the gas lines have been
cut. |
Tuesday, October 01, 2019, 09:23, Don Jackson, ITE, Maintenance, TM2, ZrC #8, 60KV Common Connections
|
1 Jumpers between 60KV common and FEBIAD lines were connected in an unusual way. This should of had no impact on the ZrC run but would have to
be corrected for any future FEBIAD runs.
2 Feedthrough U was mislabeled (label has been removed) |
Thursday, June 02, 2016, 11:59, David Wang, South Hot-Cell, Repair, TM3, , 5K mega test on TM3
|
I did a 5KV mega test on TM3. Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed the close gap between P,Q and GE. Other lines
are ok. See attachment. |
Thursday, June 02, 2016, 18:04, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , 5K mega test on TM3
|
David Wang wrote:
I did a 5KV mega test on TM3. Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed |
Friday, June 03, 2016, 16:04, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , 5K mega test on TM3
|
Aurelia Laxdal wrote:
|
Monday, May 06, 2013, 15:45, Bevan Moss, Conditioning Station, Repair, TM3, , 55 pin connector removed
|
Travis and I removed the 55 pin connector from the service cap today. The feed through was left in place as a new design for the replacement has yet
to be designed. It was not possible to test if the cables could be pulled easily as I believe there is still 1 cable tie in the containment box. The wires
were cut flush with the top of the copper tube in case Chad cannot remove them via the hot cell. Other items removed include several cable ties and a clamp |
Thursday, April 14, 2016, 12:56, David Wang, ITW, Standard Operation, TM1, , 5 shielding blocks have been moved to ITW.
|
The ITW is configured to take proton beam. |
Wednesday, September 11, 2013, 09:35, David Wang, ITW, Standard Operation, TM1, UCx, 5 shielding blocks have been moved to ITW
|
I moved 5 shielding blocks to ITW this morning .I checked the water signals in electrical room before the moving, and everything is fine. The argon venting
systemin ITW and electrical room is ready also. |
Monday, January 20, 2014, 13:35, David Wang, ITE, Standard Operation, TM4, , 5 shielding blocks had been moved out of ITE
|
5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR AND OTHER TWO MONITORS. |
|