  1981   Tuesday, September 10, 2019, 08:25 David WangConditioning StationStandard OperationTM4UCx27Argan vent TCS.TCS is argon vented. TM4 is disconnected
at TCS. 
  
  886   Wednesday, April 15, 2015, 09:01 Anders MjosConditioning StationDevelopment  Archiver variables added by Controls 
 
 
  
  1314   Wednesday, August 10, 2016, 12:18 chad fisherSouth Hot-CellMaintenance  Anteroom clearingBlack "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself
  
  1306   Friday, August 05, 2016, 13:50 chad fisherSouth Hot-CellMaintenance  Anteroom clean outSome items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service
  
  1308   Monday, August 08, 2016, 11:24 chad fisherSouth Hot-CellMaintenance  Anteroom Clean-up - WaveguideThe wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The
  
  1330   Wednesday, August 24, 2016, 09:19 chad fisherSouth Hot-CellMaintenance  Anteroom Clean -up paint prepRemaining items from anteroom have been
bagged and removed (save the boot boxes,
1 garbage can and 1 coverall garbage can).
  
  441   Wednesday, September 04, 2013, 12:21 Bevan MossSouth Hot-CellRepairTM3 Ante-room work September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and
 IMG_0983.JPG 
  1104   Thursday, October 15, 2015, 14:17 chad fisherSouth Hot-CellRepairTM2 Anode Connector Install and adjustmentThe TM2 containment box was removed this
morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection
 20151015_085914.jpg 
  2462   Wednesday, June 21, 2023, 14:39 Adam NewsomeSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module ParkingAn annual electrical and mechanical inspection
was performed on the  SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle,
 PXL_20230621_210144119.MP.jpgPXL_20230621_210546559.jpgPXL_20230621_210146892.jpg 
  2587   Wednesday, May 08, 2024, 14:01 Frank SongITWMaintenance  Annual clean up for ITW Faraday cage The ITW Faraday Cage has been cleaned,
this is part of Winter Shut Down job happens
in ISAC-1 Electric maintenance room annually.
  
  2343   Monday, July 04, 2022, 11:44 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Mechanical  
An
 SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg 
  2342   Thursday, June 30, 2022, 14:28 Nadia JorgensonSafe Module ParkingStandard Operation  Annual Inspection of Safe Module Parking - Electrical  
An annual electrical
  
  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage VaultThe annual inspection of the mini-storage
vault was performed today. The following
items were checked:
  
  2577   Thursday, May 02, 2024, 09:00 David WangITWStandard OperationTM4 Annual ITW water signal interlock check has been done. Annual ITW water signal interlock check
has been done. Renee helped me on it. Everything
works fine. 
  
  2325   Wednesday, May 25, 2022, 13:23 David WangITEStandard OperationTM4 Annual ITE water signal interlocks.Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal 
interlocks work fine. 
  
  2231   Wednesday, July 07, 2021, 11:59 Adam NewsomeSafe Module ParkingMaintenance  Annual Electrical and Mechanical InspectionAn annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Dan McDonald, and Jason Zhang as per Work
 Capture.PNGPXL_20210707_162143876.jpgPXL_20210707_162918257.jpg 
  1338   Thursday, August 25, 2016, 08:43 David WangConditioning StationStandard OperationTM2 All TM2 connections to TCS are done.The HV cover is installed. The Faraday
cage at B2 level is locked also.The TCS and
TM2 are still pumping down. Everything is
  
  1120   Tuesday, November 10, 2015, 10:23 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service capConducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the  blue F/T insulator for
 TM3_Service_Cap_Leak.pdf 
  1122   Thursday, November 12, 2015, 10:18 Anders MjosConditioning StationMaintenanceTM3 Air to vacuum leak on service cap

    

       
            
  
  2375   Friday, October 07, 2022, 14:46 Adam NewsomeSouth Hot-CellDevelopment  Addition of lift table to E-stop circuitA modification was made to integrate the
hot cell's lift table into the E-stop circuit.
See work permit I2022-10-07-1
 ISAC_SHC_Lift_Schematic_updated_20221007.jpgPXL_20221007_185635660.MP.jpgPXL_20221007_185649720.jpg 