368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
1981
|
Tuesday, September 10, 2019, 08:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | Argan vent TCS. | TCS is argon vented. TM4 is disconnected
at TCS. |
|
886
|
Wednesday, April 15, 2015, 09:01 |
Anders Mjos | Conditioning Station | Development | | | Archiver variables added by Controls |
|
|
1314
|
Wednesday, August 10, 2016, 12:18 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom clearing | Black "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself |
|
1306
|
Friday, August 05, 2016, 13:50 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom clean out | Some items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service |
|
1308
|
Monday, August 08, 2016, 11:24 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom Clean-up - Waveguide | The wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The |
|
1330
|
Wednesday, August 24, 2016, 09:19 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom Clean -up paint prep | Remaining items from anteroom have been
bagged and removed (save the boot boxes,
1 garbage can and 1 coverall garbage can). |
|
441
|
Wednesday, September 04, 2013, 12:21 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Ante-room work | September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and |
|
1104
|
Thursday, October 15, 2015, 14:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | Anode Connector Install and adjustment | The TM2 containment box was removed this
morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection |
|
2462
|
Wednesday, June 21, 2023, 14:39 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle, |
|
2587
|
Wednesday, May 08, 2024, 14:01 |
Frank Song | ITW | Maintenance | | | Annual clean up for ITW Faraday cage | The ITW Faraday Cage has been cleaned,
this is part of Winter Shut Down job happens
in ISAC-1 Electric maintenance room annually. |
|
2343
|
Monday, July 04, 2022, 11:44 |
Nadia Jorgenson | Safe Module Parking | Standard Operation | | | Annual Inspection of Safe Module Parking - Mechanical |
An |
|
2342
|
Thursday, June 30, 2022, 14:28 |
Nadia Jorgenson | Safe Module Parking | Standard Operation | | | Annual Inspection of Safe Module Parking - Electrical |
An annual electrical |
|
2318
|
Friday, May 06, 2022, 10:12 |
Adam Newsome | Spent Target Vault | Maintenance | | | Annual Inspection of Mini-Storage Vault | The annual inspection of the mini-storage
vault was performed today. The following
items were checked: |
|
2577
|
Thursday, May 02, 2024, 09:00 |
David Wang | ITW | Standard Operation | TM4 | | Annual ITW water signal interlock check has been done. | Annual ITW water signal interlock check
has been done. Renee helped me on it. Everything
works fine. |
|
2325
|
Wednesday, May 25, 2022, 13:23 |
David Wang | ITE | Standard Operation | TM4 | | Annual ITE water signal interlocks. | Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal
interlocks work fine. |
|
2231
|
Wednesday, July 07, 2021, 11:59 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual Electrical and Mechanical Inspection | An annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Dan McDonald, and Jason Zhang as per Work |
|
1338
|
Thursday, August 25, 2016, 08:43 |
David Wang | Conditioning Station | Standard Operation | TM2 | | All TM2 connections to TCS are done. | The HV cover is installed. The Faraday
cage at B2 level is locked also.The TCS and
TM2 are still pumping down. Everything is |
|
1120
|
Tuesday, November 10, 2015, 10:23 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | | Air to vacuum leak on service cap | Conducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the blue F/T insulator for |
|
1122
|
Thursday, November 12, 2015, 10:18 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | | Air to vacuum leak on service cap |
|
|