  1866   Thursday, February 14, 2019, 07:13 David WangConditioning StationStandard OperationTM2 TCS vacuum pumps have been stopped.Preparation on TM2 move from TCS to SHC.   
  1877   Tuesday, February 26, 2019, 10:33 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 with no source tray has been
moved from the south hot cell to the conditioning
station.
  
  1878   Friday, March 01, 2019, 08:42 Anders MjosConditioning StationStandard OperationTM2 Conditioning TM2 without source trayBIAS and EZL connected. No water flowing
into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV
 TM2_BIAS_current_vs_voltage_2019-03.xlsxTM2_HV_Conditioning_2019-03-01.docx 
  1881   Tuesday, March 05, 2019, 07:20 David WangConditioning StationRepairTM2 TM2 HV test at TCSSpark between HV cover vertical mesh plate
and HS 60KV  bias connecting clamp 90degree
angle at 55 KV on TM2 top. HV cover is removed
  
  1884   Thursday, March 07, 2019, 09:12 David WangConditioning StationStandard OperationTM2 TM2 move from TCS to SHC.TM2 has been moved from TCS to SHC. The
move is smooth. 
  
  1892   Friday, March 15, 2019, 08:51 Travis CaveConditioning StationStandard OperationTM2no targetModule move TM#2 has been moved from the south
hot cell to the conditioning station.
  
  1893   Monday, March 18, 2019, 07:23 David WangConditioning StationRepairTM2 TM2 window line helium testNew seals with a blank off cap are installed
on TM2 window line water block.  
The seals are checked at TCS with 70 psi
  
  1894   Monday, March 18, 2019, 07:25 David WangConditioning StationMaintenanceTM3 TCS vacuum pumps have been stopped. The TCS will be vented soon for TM2
move.
  
  1898   Tuesday, March 26, 2019, 09:32 Travis CaveConditioning StationStandard OperationTM2Dummy TargetModule move TM#2 with a new source tray and the
dummy target has been moved from the south
hot cell to the conditioning station.
  
  1899   Tuesday, March 26, 2019, 11:10 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical Check Electrical Check of TM#2 with the
dummy target attached.
 Electrical_Check_TM2_Dummy__Target_CS_Mar-26-2019.pdf 
  1901   Thursday, March 28, 2019, 10:27 David WangConditioning StationRepairTM2dummy febiad test targetTM2 new source tray helium pressure test at TCS.Helium pressure test on TM2 all water circuits
is done. 70 psi helium , 10 minutes test
time. Leak detector :base leak rate 0.0XE-9
  
  1902   Thursday, March 28, 2019, 12:48 Anders MjosConditioning StationRepairTM2dummy febiad test targetTM2 new source tray helium pressure test at TCS.


   
        
            
  
  1926   Wednesday, May 22, 2019, 08:33 Travis CaveConditioning StationStandard OperationTM1no targetModule move TM#1 has been moved from the north
west silo to the conditioning station for
the day it will be moved back to the silo
  
  1928   Wednesday, May 22, 2019, 11:52 David WangConditioning StationMaintenanceTM1 TM1 inpsection.TM1 shielding plates and their holding
bolts are inspected. No corrosion. 
TM1 is located at TCS now. Both TP1 and TP2
  
  1934   Friday, June 07, 2019, 08:56 Travis CaveConditioning StationStandard OperationTM4no targetModule move TM#4 has been moved from the south
hot cell to the conditioning station.
  
  1935   Friday, June 07, 2019, 13:11 David WangConditioning StationDevelopmentTM4 TCS and TM4. TM4 has been connected at TCS for HV test.
TCS water system and vacuum pumps are switched
on. 
  
  1936   Monday, June 10, 2019, 08:26 Carla BabcockConditioning StationMaintenanceTM4No targetRamping voltage on TM4 w/o source trayTM4 in conditioning station with no source
tray, extraction electrode set to HV bias.
Brought up to 30kV over the weekend by ISAC
  
  1938   Monday, June 10, 2019, 16:22 Carla BabcockConditioning StationMaintenanceTM4No targetRamping V on TM4, no HV cover in THRamped down the bias so David could remove
the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV
  
  1939   Monday, June 10, 2019, 18:12 Carla BabcockConditioning StationMaintenanceTM4No targetAttempt to push bias > 56kVMonday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After
 Screenshot_-_06102019_-_06_43_17_PM.png 
  1940   Wednesday, June 12, 2019, 08:56 Carla BabcockConditioning StationMaintenanceTM4No targetMore TM4 conditioning without source trayThe conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit
  