ID Date Author Category Type Module Target/Number Subject
  155   Tuesday, July 31, 2012, 14:04 Travis CaveConditioning StationStandard OperationTM1UCx#4module move

TM#1 with UCx#4 has been moved from the south  hot hell to the conditioning station. No problems with the move.

  154   Tuesday, July 31, 2012, 12:50 David WangSouth Hot-CellStandard OperationTM1UC xTM1 heat shield circuit leak check with UC x target

Chad and i did a leak check on TM1heat shield with UCx target on.The circuit are pumped  down to the bottom leak rate and base pressure is 3xE-3 torr on the leak detector. There are two VCR caps on heat shield circuit. Chad sprayed helium on both of them   ( tested individually,2 seconds every time ) . The test repeated 1 time.There is no response on leak detector during 45 seconds waiting time on both time.Chad flushed helium around the target for 15 second. During 1 minutes waiting time , there is no response on leak detector.The heat shield circuit is leak tight at this stage. It will be helium pressure  in CS later.

  153   Tuesday, July 31, 2012, 12:24 chad fisherSouth Hot-CellStandard OperationTM1UCx#4UCx#4 Installed

Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.

During module move to the hot cell UCx#4 was housed in a bag under argon.

  152   Tuesday, July 31, 2012, 10:50 Travis CaveSouth Hot-CellStandard OperationTM1Ta#38module move

TM#1 with Ta#38 has been moved from the west target station to the south hot cell, no problems with the move.

  151   Tuesday, July 31, 2012, 09:52 David WangITWStandard OperationTM1Ta38TM1 disconnected in ITW

I disconnected TM1 in ITW.  Heat shield line has been purged .

  150   Thursday, July 26, 2012, 08:33 David WangITEStandard OperationTM4 I moved 5 shielding blocks from ITW to ITE thisTuesday morning .

  All water interlock checks for ITE had been done. The ITE water signals strength and frequency(Espcially on MSP circuit) had been checked from electrical room, and everything is good.

  149   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm Trip

Today (Wednesday July 18th) at around 4:15 pm I was taking a small tour group from VECC into the Target Hall. In the process of discussing the mechanical design of the Target Modules and South Hot Cell turntable I inadvertently lifted the Aluminum Hatch Cover of the Hot Cell about 2 inches in an effort to explain something. This tripped the ventilation alarm before I realized what I was doing. I evacuated the visitors from the Target Hall, checked booties and gloves at the check station before having the visitors step over the boot box. I called operations and let them know what I had done. The Target Hall was locked out and is awaiting a survey for the morning of July 19th before work can proceed.

  148   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm Trip

Today (Wednesday July 18th) at around 4:15 pm I was taking a small tour group from VECC into the Target Hall. In the process of discussing the mechanical design of the Target Modules and South Hot Cell turntable I inadvertently lifted the Aluminum Hatch Cover of the Hot Cell about 2 inches in an effort to explain something. This tripped the ventilation alarm before I realized what I was doing. I evacuated the visitors from the Target Hall, checked booties and gloves at the check station before having the visitors step over the boot box. I called operations and let them know what I had done. The Target Hall was locked out and is awaiting a survey for the morning of July 19th before work can proceed.

  147   Monday, July 16, 2012, 11:55 Bevan MossCraneRepair  Crane has stopped working

Bevan Moss wrote:

In the AM today David and I used the crane to raise the ground plate sheet metal into place. This afternoon when I attempted to return the crane to its usual place I discovered that the crane no longer worked. Upon further inspection it appears that the PLC has lost power. I will follow up on this Monday morning. The crane is not supporting any load at this point.

 Turns out I am just not very observant. David had turned the main break to the crane off as a result when he turned it back on this morning the crane magically started working again.

  146   Friday, July 13, 2012, 16:33 Bevan MossCraneRepair  Crane has stopped working

In the AM today David and I used the crane to raise the ground plate sheet metal into place. This afternoon when I attempted to return the crane to its usual place I discovered that the crane no longer worked. Upon further inspection it appears that the PLC has lost power. I will follow up on this Monday morning. The crane is not supporting any load at this point.

  145   Monday, July 09, 2012, 16:08 David WangITEStandard OperationTM4UO#3ITM4 in ITE connected and pumping down

 TM4 has been moved to ITE and connected there today. I started six turbo pumps this afternoon. One of TP4 back valve (one in pairs) didn’t open .It caused the TP4 difficult to start. I disconnected that control cable that plug to solenoid valve and reconnected it. Then it works fine. After this, TP4 started to normal speed easily. The vacuum readings are OK so far. Tomorrow morning they all should be around 6-7 X E-6 torr range. Water interlock checks related to TM4 have been finished. NO water supply to ITE dump and entrance to keep the system pressure over 90psi. All TM4 water signals are good and strong by watching them from electrical panel. Gas line connected and valves opened. Control page set to fibiad .

  144   Monday, July 09, 2012, 10:51 Travis CaveITEStandard OperationTM4UO#3module move

TM#4 with UO#3 from the conditioning station to the east target station. Move went well.

  143   Friday, July 06, 2012, 14:38 David WangConditioning StationStandard OperationTM4UO#3TM4 UO#3 target heat shield helium pressure check is done.

Connected leak detector to TM4 and CS vacuum system. The vacuum readings on TM4 and CS:PNG4 3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic box) 3.9xE-6 Torr. Leak detector base pressure:6.0xE-3 torr, base leak rate: 1.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 5 mins . There is no response on leak detector. The heat shield circuit is leak tight.

  142   Friday, July 06, 2012, 11:34 Travis CaveSpent Target VaultStandard Operation SiC#27Spent target move

SiC#27 has been moved from the south hot cell to the spent target vault. Target was placed in pail #96, placed in slot 3A, the fields at the hot cell were 178mSv/hr. For the latest on the vault see attached document.

  141   Friday, July 06, 2012, 09:24 Travis CaveConditioning StationStandard OperationTM4UO#3Electrical check

Electrical check of the target was done at the conditioning station under vacuum, see attached file for details.

  140   Wednesday, July 04, 2012, 14:16 Travis CaveConditioning StationStandard OperationTM4UO#3module move

TM#4 with UO#3 moved from the south hot cell to the conditioning station. The fields of the module at the hot cell was 74.4 mSv/hr.

  139   Wednesday, July 04, 2012, 13:18 David WangConditioning StationStandard OperationTM4uo#3leak check on heat shield circuit

Chad and I leak checked the heat shield circuit after uc#3target installed. It took 5minutes to pump down the circuit to the leak detector bottom scales.   All the vacuum lines and connections are leak checked by spraying helium. Chad sprayed helium to each vcr fittings for 2 seconds. There is no any response on leak detector . The test repeated one time and the result is same. The heat shield circuit is leak tight at this stage . We will move TM4 to conditioning station and pressure helium test the circuit.

  138   Wednesday, July 04, 2012, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UO#3Electrical check

Electrical check of TM#4 with  UO#3 attached at the south hot cell see attached PDF for full results. It has been noted that the Anode to 60kV common is of a low value after consulting with Friedhelm Ames it was determined will will run with what we have.

  137   Tuesday, July 03, 2012, 12:26 Travis CaveSouth Hot-CellStandard OperationTM4SiC#27module move

TM#4 with SiC#27 moved from the east station to the south hot cell. Fields at East MAA were 127mSv/hr and the fields at the south hot cell was 77.5 mSv/hr.

  136   Tuesday, July 03, 2012, 10:50 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.

I disconnected TM4 in ITE this morning. The window circuit and heat shield circuit had been purged. The general field inside ITE is about 200usv/h.