2126
|
Tuesday, July 21, 2020, 14:22 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully |
|
2128
|
Monday, July 27, 2020, 10:00 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the west target station to the
south hot cell for repairs. |
|
2129
|
Tuesday, July 28, 2020, 09:26 |
chad fisher | South Hot-Cell | Repair | | | Entrance Module Wire Scanner | Entrance module wire scanner has been replaced.
Pictures to follow. |
|
2130
|
Wednesday, July 29, 2020, 09:20 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the south hot cell back to the
West Target Station. |
|
2132
|
Thursday, August 06, 2020, 14:33 |
Adam Newsome | Spent Target Vault | Development | | | Safety Group Relay Interface Installation | A relay contact-based interface module
was installed in between Safety Group's storage
vault door enable junction box and Remote |
|
2135
|
Wednesday, August 19, 2020, 10:17 |
Adam Newsome | South Hot-Cell | Standard Operation | | | ITW Entrance Module moved to SHC | ITW Entrance Module was moved from west
station to South Hot Cell. |
|
2136
|
Monday, August 24, 2020, 10:11 |
Adam Newsome | ITW | Standard Operation | | | Entrance Module to ITW | Entrance Module was moved from South Hot
Cell to ITW Station.
Note: weight of entrance module, |
|
2141
|
Thursday, August 27, 2020, 11:14 |
Travis Cave | Spent Target Vault | Standard Operation | | Graphite #1 | Spent Target Move | Graphite #1 along with the broke
2A2M19 wire scanner have been placed in the
spent target vault see attached PDF for deatails. |
|
2143
|
Tuesday, September 08, 2020, 10:37 |
Travis Cave | ITW | Standard Operation | | no target | Entrance module move | The West Entrance module has been
moved to the south hot cell for repairs. |
|
2147
|
Thursday, September 24, 2020, 10:34 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#30 | Spent Target Move | UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr |
|
2158
|
Tuesday, October 27, 2020, 11:46 |
Matthew Gareau | North Hot-Cell | Repair | | | Ratcheting repair issues with both left and right master |
|
|
2159
|
Friday, October 30, 2020, 09:02 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48,51,54 SiC#35, and UC#25 | Repacking of the targets. | Targets Ta#48,51,54 SiC#35,
and UC#25 were repacked and placed in the
mini vault. In the following order back to |
|
2161
|
Thursday, November 05, 2020, 10:23 |
David Wang | Spent Target Vault | Standard Operation | | | TM2 old source tray and TM4 optic tray in vault tray#9. | TM2 old source tray and TM4 optic tray
are stored together in vault tray#9. The
fielding measurement at SHC post 0.5 meter |
|
2163
|
Thursday, November 12, 2020, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#31 | Spent Target Move | UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and |
|
2167
|
Thursday, November 19, 2020, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | C#2 | Spent Target Move | C#2 has been moved from the south hot cell
to the spent target vault. It is in spot
8A of the vault in pail # 235 and was 185 |
|
2173
|
Monday, December 21, 2020, 11:22 |
Adam Newsome | Crane | Standard Operation | | | Crane Shutdown for Power Outage | The Target Hall Crane has been shut down
in preparation for the power outage tomorrow
(Dec 22). Power will be restored on Dec 23. |
|
2174
|
Thursday, December 24, 2020, 09:00 |
Matthew Gareau | North Hot-Cell | Development | | | NHC USB connection | |
|
2180
|
Friday, January 22, 2021, 12:34 |
David Wang | ITE | Standard Operation | | | ITE HV test. | ITE annual HV test is done. No module in
station. The bias power supply has been ramped
up to 49KV on control page. We still have |
|
2182
|
Monday, January 25, 2021, 12:33 |
David Wang | ITW | Standard Operation | | | ITW bias HV test | Ramp up ITW bias to 57KV. no spark. 200uA
leaking current at 57KV. The test is done
without target module in station. |
|
2183
|
Wednesday, January 27, 2021, 14:30 |
David Wang | Cooling | Development | | | High active water system purging | High active water are purged to holding
tank at B2 level. There should be around
48 gallons are purged out of system. No purging |
|