2096
|
Monday, June 01, 2020, 12:40 |
David Wang | Crane | Maintenance | | | TH crane festoon cable maintenance | Tom Kauss corrected the TH crane
festoon cable loops. He lubricated festoon
cable wheels as well. The maintenance |
|
2097
|
Monday, June 01, 2020, 12:46 |
David Wang | ITE | Maintenance | | | ITH:CM6 ,CM6S and ITM:CM3 calibration. | Edi calibrated ITH:CM6, CM6S and ITM:CM3.
By the same time, ITH:MP1 and MP2
lubricate oil level are checked. Everything |
|
2098
|
Thursday, June 04, 2020, 10:40 |
David Wang | Conditioning Station | Maintenance | | | Three manual valves are closed on TCS water system | Three manual valves are closed on TCS water
system return line in experimental hall.
See attachments. It is for TCS TK2 water |
 |
2099
|
Thursday, June 04, 2020, 10:51 |
David Wang | Conditioning Station | Standard Operation | | | TH floor mop up. | Jason Sargeant mopped up TH floor this
morning. The mop head was checked after the
job. There are 1500 counts on it. He think |
|
2100
|
Thursday, June 11, 2020, 11:49 |
David Wang | ITE | Maintenance | | | ITW and ITE thermocouple status. | |
|
2109
|
Tuesday, June 23, 2020, 10:56 |
David Wang | Safe Module Parking | Standard Operation | | | SMP annual service. | Dan and I did the SMP annual maintenance
service today. Lid open/close , vessel rotation
and limit switch check, lubricate chains, |
|
2111
|
Friday, June 26, 2020, 10:43 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Routine mechanical inspection: storage vault and mini-storage drive systems | An inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality |
   |
2112
|
Friday, June 26, 2020, 15:00 |
David Wang | ITW | Maintenance | | | ITW TP1 and TP1S. | ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after. We changed both |
|
2125
|
Thursday, July 16, 2020, 10:20 |
Adam Newsome | Safe Module Parking | Maintenance | | | SMP: Annual Electrical Inspection | An electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to |
|
2126
|
Tuesday, July 21, 2020, 14:22 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully |
|
2128
|
Monday, July 27, 2020, 10:00 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the west target station to the
south hot cell for repairs. |
|
2129
|
Tuesday, July 28, 2020, 09:26 |
chad fisher | South Hot-Cell | Repair | | | Entrance Module Wire Scanner | Entrance module wire scanner has been replaced.
Pictures to follow. |
|
2130
|
Wednesday, July 29, 2020, 09:20 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the south hot cell back to the
West Target Station. |
|
2132
|
Thursday, August 06, 2020, 14:33 |
Adam Newsome | Spent Target Vault | Development | | | Safety Group Relay Interface Installation | A relay contact-based interface module
was installed in between Safety Group's storage
vault door enable junction box and Remote |
|
2135
|
Wednesday, August 19, 2020, 10:17 |
Adam Newsome | South Hot-Cell | Standard Operation | | | ITW Entrance Module moved to SHC | ITW Entrance Module was moved from west
station to South Hot Cell. |
|
2136
|
Monday, August 24, 2020, 10:11 |
Adam Newsome | ITW | Standard Operation | | | Entrance Module to ITW | Entrance Module was moved from South Hot
Cell to ITW Station.
Note: weight of entrance module, |
|
2141
|
Thursday, August 27, 2020, 11:14 |
Travis Cave | Spent Target Vault | Standard Operation | | Graphite #1 | Spent Target Move | Graphite #1 along with the broke
2A2M19 wire scanner have been placed in the
spent target vault see attached PDF for deatails. |
|
2143
|
Tuesday, September 08, 2020, 10:37 |
Travis Cave | ITW | Standard Operation | | no target | Entrance module move | The West Entrance module has been
moved to the south hot cell for repairs. |
|
2147
|
Thursday, September 24, 2020, 10:34 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#30 | Spent Target Move | UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr |
|
2158
|
Tuesday, October 27, 2020, 11:46 |
Matthew Gareau | North Hot-Cell | Repair | | | Ratcheting repair issues with both left and right master |
|
|