1409
|
Tuesday, November 29, 2016, 07:50 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is disconnected at TCS. | Argon venting is done. |
|
1412
|
Wednesday, November 30, 2016, 16:31 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 vacuum system have been connected at TCS. | All water circuits are by passed on the
top of TM3. Water pumps and vacuum turbo-
pumps are started. Everything is ready for |
|
1414
|
Monday, December 05, 2016, 10:04 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | | TM3 vacuum system have been connected at TCS. |
|
|
1417
|
Friday, December 09, 2016, 18:05 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | | TM3 vacuum system have been connected at TCS. |
|
|
1418
|
Wednesday, January 04, 2017, 14:27 |
David Wang | Conditioning Station | Standard Operation | | | started TCS vacuum pump | TCS TP1S has been started.
2017-01-23 afternoon: Stopped TP1S.
We will use TCS to take TM2 tomorrow afternoon. |
|
1424
|
Thursday, January 19, 2017, 10:15 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for 2017 winter shut down | Updated target hall schedule for 2017 winter
shut down. See attachments 1,2
Update schedule after Febiad beam |
|
1425
|
Tuesday, January 24, 2017, 15:24 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 electrical check and leack check. | I did electrical check before and after
Fefiad target installation on TM2. The RU
(coil) Is till short to 60KV as before. Other |
|
1426
|
Tuesday, January 24, 2017, 15:29 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been moved to TCS . | I connected TCS vacuum system to TM2. The
station is under roughing now. All turbo
pumps will be started soon. |
|
1431
|
Friday, January 27, 2017, 10:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been moved from TCS to ITE | The move is successful. |
|
1433
|
Friday, February 03, 2017, 11:49 |
David Wang | Conditioning Station | Standard Operation | | | Update 2017 winter shutdown TH schedule. | Update 2017 winter shut down target hall
schedule. See attachments |
|
1436
|
Thursday, February 09, 2017, 09:24 |
David Wang | Conditioning Station | Development | | | Target module window cooling lines at TCS. | Target module window cooling lines
at TCS has been modified to use spare 2 channel
in TCS: WFB1. The old cooling lines used |
|
1438
|
Friday, February 10, 2017, 09:56 |
David Wang | Conditioning Station | Standard Operation | | | water has been refilled to TCS:TK2 | TCS:TK2 , Water has been refilled to 28.5"
level. It was 15.1". Fall protection
equipment are used during the job. |
|
1455
|
Tuesday, March 21, 2017, 10:06 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | module moved | TM#4 has been moved from the SW Silo to
the conditioning station. |
|
1456
|
Tuesday, March 21, 2017, 11:59 |
David Wang | Conditioning Station | Repair | TM4 | | Rust inpsection on TM4 service cap inside surface and shielding plug surface. | Yasmine and I did a rust inpsection on
TM4 service cap inide surface and shielding
plug surface. No rust has been found. Also, |
11x |
1460
|
Thursday, March 23, 2017, 11:42 |
David Wang | Conditioning Station | Maintenance | TM4 | | TM4 Sevice cap rust are cleaned out. | TM4 service cap rust are cleaned out at
TCS. All top surface of TM4 are wiped and
cleaned . The module looks good now. see |
|
1470
|
Wednesday, March 29, 2017, 11:42 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#19 | Conditioning UC#19 | Wednesday, March 29, 2017, 11:37:
RGA on
Wednesday, March 29, 2017, 13:51: |
|
1471
|
Wednesday, March 29, 2017, 14:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | | small leak on TM4 Ta(-) water line. | A small leak has been found on TM4 Ta(-)
which is marked as "B" on terminal
blocks. The LD base Leak rate is 1.2XE-8 |
|
1472
|
Thursday, March 30, 2017, 11:21 |
David Wang | Conditioning Station | Repair | TM4 | | Leak check on TM4 Ta(-) water lines in service cap | Leak check on TM4 Ta(-) water lines in
service cap is done. LD base LR after 50minutes
pumping down:0.0xE-9 atm.cc/sec. base pressure: |
|
1474
|
Tuesday, April 04, 2017, 10:23 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure leak check on TM4 Ta(-) water lines | This morning, The helium pressure leak
check on TM4 Ta(-) is done after TM4 finished
conditioning yesterday. LD base LR:8.0XE-9 |
|
1475
|
Tuesday, April 04, 2017, 10:24 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Stopped TCS pumps this morning | Argon vented TCS and TM4 after pumps
are stopped. |
|