Entry  Friday, October 23, 2015, 11:30, chad fisher, South Hot-Cell, Standard Operation, , ZrC#7, ZrC#7 Spent Move and Febiad Coil 

ZrC#7 was transfered to a spent target disposal pail today and removed from the hot cell. The "hot" end of the TM4 coil end was also disposed of in the same pail (#129)

Entry  Wednesday, September 03, 2014, 13:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check TM1_ZrC6_elec_chk_shc.PDF

TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal.

Entry  Thursday, September 04, 2014, 09:45, Travis Cave, Conditioning Station, Standard Operation, TM1, ZrC#6, module move 

TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station.

Entry  Monday, September 08, 2014, 13:44, David Wang, Conditioning Station, Standard Operation, TM1, ZrC#6, TM1 is disconnected at CS. 

Stopped TM1 and CS turbo pumps. Disconnected TM1 at CS. The CS and TM1 are under vacuum and naturally leak up. I will vent it on Wednesday morning.

Entry  Wednesday, September 10, 2014, 08:52, Travis Cave, ITW, Standard Operation, TM1, ZrC#6, module move 

TM#1 with ZrC#6 has been moved from the conditioning station to west target station.

Entry  Tuesday, October 14, 2014, 11:51, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, module move 

TM#1 with ZrC#6 has been moved from ITW to the south hot cell.

Entry  Tuesday, October 14, 2014, 11:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, ZrC#6, Electrical check TM1_ZrC6_postbeam.PDF

TM#1 with ZrC#6 post beam electrical check see attached pdf for results.

Entry  Tuesday, October 21, 2014, 14:53, Travis Cave, Spent Target Vault, Standard Operation, , ZrC#6, Spent target move Vault_Storage_October_21_2014.pdf

ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF.

Entry  Friday, August 16, 2019, 08:46, David Wang, ITE, Standard Operation, TM4, ZrC #8., TM2 has been connected in ITE. 

TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.

Entry  Thursday, August 15, 2019, 09:36, Adam Newsome, ITE, Standard Operation, TM2, ZrC #8, TM2 Move 

TM2 was moved from South Hot Cell to ITE. ZrC #8 target.

Entry  Tuesday, October 01, 2019, 09:23, Don Jackson, ITE, Maintenance, TM2, ZrC #8, 60KV Common Connections TM2_Wiring.jpg

1 Jumpers between 60KV common and FEBIAD lines were connected in an unusual way.  This should of had no impact on the ZrC run but would have to be corrected for any future FEBIAD runs.

2 Feedthrough U was mislabeled (label has been removed)

 

Entry  Wednesday, August 26, 2015, 09:20, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC #7, Electrical Check TM2_elec_chk_ZrC7_SHC.PDF

Electrical check of TM#2 with ZrC #7 installed

Entry  Wednesday, August 26, 2015, 11:12, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Module moved 

TM#2 with ZrC#7 has been moved to the conditioning station from the south hot cell.

Entry  Thursday, August 27, 2015, 08:43, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Electrical Check TM2_elec_chk_ZrC7_CS.PDF

Electrical check of TM#2 at the conditioning station under vacuum. The resistance value of the target to 60kV common is a bit lower then what it was at the south hot cell.

Entry  Tuesday, September 01, 2015, 10:32, Travis Cave, ITW, Standard Operation, TM2, ZrC #7, Module moved 

TM#2 with ZrC#7 has been moved from the conditioning station  to the west target station.

Entry  Tuesday, September 01, 2015, 16:03, Grant Minor, ITW, Standard Operation, TM2, ZrC #7, Photos of TM2 Connection Procedure on Docushare 1Sept2015 

https://documents.triumf.ca/docushare/dsweb/View/Collection-15323

Entry  Friday, October 23, 2015, 11:40, Travis Cave, Spent Target Vault, Standard Operation, , ZrC #7, Spent target moved Vault_Storage_October_23_2015.pdf

The spent ZrC#7 target has been moved from the south hot cell to the spent target vault. The target was placed in pail #129 and then placed in slot 3B of the vault, it was 157mSv/hr upon removal from the south hot cell.

Entry  Tuesday, September 16, 2014, 10:41, David Wang, ITW, Standard Operation, TM1, ZrC #4, 5 Shielding blocks have been transferred from ITE to ITW. 

5 Shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam

Entry  Wednesday, August 26, 2015, 14:28, David Wang, Conditioning Station, Standard Operation, TM2, ZrC, Leak check on TM2 HS and windowwater line with new ZrC target at SHC 

Chad and I leak checked TM2 HS and window circuit VCR joints with ZrC target and containment box installed at SHC. No leak has been found. They will   be helium pressurized  at CS later.

Entry  Wednesday, August 26, 2015, 14:30, David Wang, Conditioning Station, Standard Operation, TM2, ZrC, TM2 and Cs vacuum sysyem has been connected at CS. 

Turbo-pumps are started . The pumping down is good so far.