1113
|
Friday, October 23, 2015, 11:30 |
chad fisher | South Hot-Cell | Standard Operation | | ZrC#7 | ZrC#7 Spent Move and Febiad Coil |
ZrC#7 was transfered to a spent target disposal pail today and removed from the hot cell. The "hot" end of the TM4 coil end was also disposed of in the same pail (#129) |
|
737
|
Wednesday, September 03, 2014, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check |
TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal. |
Attachment 1: TM1_ZrC6_elec_chk_shc.PDF
|
|
|
738
|
Thursday, September 04, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | ZrC#6 | module move |
TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station. |
|
743
|
Monday, September 08, 2014, 13:44 |
David Wang | Conditioning Station | Standard Operation | TM1 | ZrC#6 | TM1 is disconnected at CS. |
Stopped TM1 and CS turbo pumps. Disconnected TM1 at CS. The CS and TM1 are under vacuum and naturally leak up. I will vent it on Wednesday morning. |
|
745
|
Wednesday, September 10, 2014, 08:52 |
Travis Cave | ITW | Standard Operation | TM1 | ZrC#6 | module move |
TM#1 with ZrC#6 has been moved from the conditioning station to west target station. |
|
760
|
Tuesday, October 14, 2014, 11:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | module move |
TM#1 with ZrC#6 has been moved from ITW to the south hot cell. |
|
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check |
TM#1 with ZrC#6 post beam electrical check see attached pdf for results. |
Attachment 1: TM1_ZrC6_postbeam.PDF
|
|
|
772
|
Tuesday, October 21, 2014, 14:53 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC#6 | Spent target move |
ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF. |
Attachment 1: Vault_Storage_October_21_2014.pdf
|
|
|
1965
|
Friday, August 16, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM4 | ZrC #8. | TM2 has been connected in ITE. |
TM2 has been connected in ITE. turbo pumps have been started. ITE and TM2 vacuum are good. |
|
1963
|
Thursday, August 15, 2019, 09:36 |
Adam Newsome | ITE | Standard Operation | TM2 | ZrC #8 | TM2 Move |
TM2 was moved from South Hot Cell to ITE. ZrC #8 target. |
|
1993
|
Tuesday, October 01, 2019, 09:23 |
Don Jackson | ITE | Maintenance | TM2 | ZrC #8 | 60KV Common Connections |
1 Jumpers between 60KV common and FEBIAD lines were connected in an unusual way. This should of had no impact on the ZrC run but would have to be corrected for any future FEBIAD runs.
2 Feedthrough U was mislabeled (label has been removed)
|
Attachment 1: TM2_Wiring.jpg
|
|
|
1047
|
Wednesday, August 26, 2015, 09:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC #7 | Electrical Check |
Electrical check of TM#2 with ZrC #7 installed |
Attachment 1: TM2_elec_chk_ZrC7_SHC.PDF
|
|
|
1050
|
Wednesday, August 26, 2015, 11:12 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Module moved |
TM#2 with ZrC#7 has been moved to the conditioning station from the south hot cell. |
|
1054
|
Thursday, August 27, 2015, 08:43 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Electrical Check |
Electrical check of TM#2 at the conditioning station under vacuum. The resistance value of the target to 60kV common is a bit lower then what it was at the south hot cell. |
Attachment 1: TM2_elec_chk_ZrC7_CS.PDF
|
|
|
1057
|
Tuesday, September 01, 2015, 10:32 |
Travis Cave | ITW | Standard Operation | TM2 | ZrC #7 | Module moved |
TM#2 with ZrC#7 has been moved from the conditioning station to the west target station. |
|
1060
|
Tuesday, September 01, 2015, 16:03 |
Grant Minor | ITW | Standard Operation | TM2 | ZrC #7 | Photos of TM2 Connection Procedure on Docushare 1Sept2015 |
https://documents.triumf.ca/docushare/dsweb/View/Collection-15323 |
|
1114
|
Friday, October 23, 2015, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC #7 | Spent target moved |
The spent ZrC#7 target has been moved from the south hot cell to the spent target vault. The target was placed in pail #129 and then placed in slot 3B of the vault, it was 157mSv/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_October_23_2015.pdf
|
|
|
749
|
Tuesday, September 16, 2014, 10:41 |
David Wang | ITW | Standard Operation | TM1 | ZrC #4 | 5 Shielding blocks have been transferred from ITE to ITW. |
5 Shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam |
|
1051
|
Wednesday, August 26, 2015, 14:28 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Leak check on TM2 HS and windowwater line with new ZrC target at SHC |
Chad and I leak checked TM2 HS and window circuit VCR joints with ZrC target and containment box installed at SHC. No leak has been found. They will be helium pressurized at CS later. |
|
1052
|
Wednesday, August 26, 2015, 14:30 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | TM2 and Cs vacuum sysyem has been connected at CS. |
Turbo-pumps are started . The pumping down is good so far. |