583
|
Monday, January 20, 2014, 13:40 |
maicodallavalle | Spent Target Vault | Maintenance | | F-308 | Empty F-308s | Four empty F-308s just arrived back at
Triumf. I moved them from shipping
to the Remote Handling Shop for service and |
|
2126
|
Tuesday, July 21, 2020, 14:22 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully |
|
2234
|
Thursday, July 15, 2021, 09:02 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully |
|
2319
|
Wednesday, May 11, 2022, 16:15 |
Nadia Jorgenson | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close
mechanism for the Storage Vault door was |
|
2441
|
Friday, May 12, 2023, 09:56 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close
mechanism for the Storage Vault door was |
|
2236
|
Friday, July 30, 2021, 16:19 |
Carla Babcock | ITE | Repair | TM4 | Ta#62 | Electrical issues on Ta62 | TLDR: TBHT
voltage too high and rising too quickly with |
|
2293
|
Wednesday, January 19, 2022, 09:00 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | Electrical check on TM4 at NHC without target | David did electrical check after
target removed from TM4 at NHC. see attachment
pls. |
|
1123
|
Thursday, November 12, 2015, 13:25 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check and leak check | Target to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached. |
|
1125
|
Monday, November 16, 2015, 10:09 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check after HV conditioning | Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details. |
|
7
|
Tuesday, July 19, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#36 | Electrical check | See attached PDF for the details. |
|
15
|
Thursday, July 28, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#37 | Electrical check | TM#1 has passed the the electrical check. |
|
34
|
Monday, October 03, 2011, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TaC#1 | Electrical check | TM#1 with TaC#1 installed passed the electrical
test. With a value of 882MOhms that was meggered
from the heat shield to the chassis, all |
|
37
|
Tuesday, October 25, 2011, 08:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Electrical check | TM#4 with SiC#26 HP has been checked electrically
it has passed. It was noted that the Megger
check of the Oven to Chassis (earth ground) |
|
56
|
Friday, November 18, 2011, 09:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#3 | Electrical check | Electrical checks of TM#1 with UCx#3 have
been completed. They all appear to be with
in operational range. All megger checks were |
|
88
|
Thursday, April 19, 2012, 09:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical check | Electrical check has been completed of
TM#1 with Nb#6 attached. Our new micro-ohm
meter was also used for the first time for |
|
100
|
Tuesday, May 15, 2012, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 | Electrical check | Results of the electrical check of TM#4
with SiC#26 attached post beam. |
|
106
|
Friday, May 18, 2012, 08:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | Electrical check | TM#4 with SiC#27 has had its electrical
check. See attached PDF for details. |
|
108
|
Tuesday, May 22, 2012, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#27 | Electrical check | Electrical check of TM#4 with SiC#27 under
vacuum at that conditioning station. See
attached PDF for details. |
|
125
|
Monday, June 11, 2012, 14:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#38 | Electrical check | Electrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details. |
|
138
|
Wednesday, July 04, 2012, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | Electrical check | Electrical check of TM#4 with UO#3
attached at the south hot cell see attached
PDF for full results. It has been noted that |
|