  RH-ISAC, Page 119 of 138  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject
  1198   Friday, April 08, 2016, 07:10 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected in ITE.

All turbo pumps are started yesterday. The pumping down is good over night.

  1202   Friday, April 08, 2016, 13:16 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall Schedule

Update schedule weekly .see attachment 1,2

  1203   Monday, April 11, 2016, 09:42 David WangConditioning StationStandard OperationTM4 Helium pressure test on TM4 HS line at CS with new Lp Ta target

70 psi helium , 2 minutes. Base leak rate 0.0x E-9 atm.cc/sec. base pressure 0.0XE-4 torr. no response on LD.The line is good.

  1205   Monday, April 11, 2016, 13:44 David WangConditioning StationStandard OperationTM4 I stopped TCS and TM4 vacuum pumps.

The TM4 is still under vacuum at TCS. It will be vented tomorrow morning.

I disconnected TM4 vacuum system at TCS.

  1208   Wednesday, April 13, 2016, 10:14 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 has been moved from the south west silo to the conditioning station.

  1209   Wednesday, April 13, 2016, 10:46 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.

TCS is under roughing now.

  1210   Wednesday, April 13, 2016, 10:46 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.

TCS is under roughing now.

2016-04-14, Started TCS and TM2 turbo-pumps yesterday afternoon. Overnight pumping down is fine.

  1211   Thursday, April 14, 2016, 09:46 Anders MjosConditioning StationStandard OperationTM2 TM2 water leak test

 Thursday, April 14, 2016, 07:50: RGA on


Friday, April 15, 2016, 08:09 : Ratio between water and air is higher than normal (indicating possible air leak). See attachment. 3.5 more H2O than N2.  (Ratio in TM3 Nov 2015 was 82:1)


 

A leak was found on the o-ring between the module flange and TCS. This could be fixed by cleaning the o-ring and sealing surface. The Window line is not closed and was accidentally pressurized with He on April 25


Tuesday, April 26, 2016, 08:47: David started the water package.


Wednesday, April 27, 2016, 08:15: Switched off chiller / water cooling.

Wednesday, April 27, 2016, 14:41: Switched chiller / water cooling back on.

  1213   Monday, April 18, 2016, 09:07 David WangConditioning StationRepairTM2 venting TCS with argon.

Anders reported a possible air leak on TM2 and TCS by watching RGA  this morning. I found the quick connector on F terminal on the top of the module is leaking air. It is only used as "X" terminal for Febiad without  water. So, it should be blind capped instead of installing a quick connector. It was installed with a  blind cap before. I borrowed it for leak check on coil lines at SHC, but forgot to put it back right away. Instead, I put a quick connector on it later. This caused the problem. Anyway The TCS need to be vented , and a blind cap  will be installed on the F terminal.

2014-04-18, 9:24AM, I changed the quick connector with a blind cap on F terminal. the rough pump is started now.

  1214   Friday, April 22, 2016, 14:07 David WangConditioning StationStandard OperationTM2 2016 Winter Shut Down Target Hall Schedule

Weekly update.This is the last update on 2016 winter shut down schedule. The new TH schedule for beam130  will be posted weekly after this. All jobs in winter shut down schedule were finished on time.

 

  1215   Monday, April 25, 2016, 12:18 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)

Post MS project and Excel    target hall schedule for beam schedule 130 see attachments 1,2

Update TH schedule 130 with TM3 jobs involved in.see attachments 4,5.

2016-04-29.  Weekly update schedule according to changes. See attachments 6,7.

  1216   Tuesday, April 26, 2016, 10:47 David WangConditioning StationRepairTM2 TM2 leak check at TCS, water test.

The following water circuits in TM2 are connected at TCS and running with water now : target oven+ - ( one circuit), tube heater+ -( one circuit), coil1 and 2(one circuit), MSP, and EE. The HS and window are open circuits now so they can not be supplied with water.  During the check before we knew HS and window circuit were close to perfectly sealed. So, The test result should not be affected without them

The TCS water pumps are started at 8:28 AM. All TCS high vacuum gauge readings are getting slight better after that.

  1217   Thursday, April 28, 2016, 06:28 David WangConditioning StationMaintenanceTM2 TCS water system are turned off.

 TCS water system worked fine overnight. I turned off TCS water system at 6:16 AM this morning. Start of purging TM2 water lines for helium pressure test again this morning.

2016-4-28 7:58AM. Disconnected TM2 water lines at TCS. Purged them with compression air each for 5 minutes. 

  1218   Friday, April 29, 2016, 08:01 David WangConditioning StationMaintenanceTM2 TM2 leak check at TCS, helium pressure test

Anders and I finished the most part of TM2 water lines helium pressure test yesterday.I list the system parameters and test result as below:

TCS  IG1: 9.8XE-8 torr,  TCS IG2: 9.6Xe-7 torr, TCS IG1S: 3.5XE-9 torr, TCS CG1A: 10 m torr

Helium pressure: 70 psi. Test time: 5 minutes for each individual circuit.  1 hour for all  lines together test.

 Leak detector base leak rate:0.0 X E -9 atm.cc/sec, base pressure 0.0X E-4 torr. LD was always restored or closely restored to the bottom  scale after each individual test.

 

Circuit Result (atm.cc/sec)
EE 0.0X E-9
Target Oven + 0.0X E-9
Coil 1   P-Q 0.0X E-9
Target Oven - 1.0X E-9
Tube Heater- 4.1X E-9
Tube heater+ 1.6X E-8
Coil 2    R-U 6.6X E-9
MSP 1.4X E-7
All above together (1 hour) 2.3X E-7
HS Open circuit . No test
Window Open circuit.  No test.
GE  7.2X E-7

The HS and Window lines will be tested later with new target installed and  window line gaskets restored.

  1219   Friday, April 29, 2016, 10:06 David WangConditioning StationStandard OperationTM2 I switched off TCS and TM2 vacuum pumps.

  I switched off TCS and TM2 vacuum pumps. The TM2 will be disconnected at TCS today and moved to silo on next Monday.

  1220   Monday, May 02, 2016, 11:33 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 was moved to the SW Silo from the Conditioning Station. TM#3 was from from the NW Silo to the Conditioning Station.

  1222   Wednesday, May 04, 2016, 12:01 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)

Update schedule weekly. See attachment 1,2,3.

  1223   Monday, May 09, 2016, 08:43 David WangConditioning StationRepairTM3 I reinstalled all the side panel on TM3 service cap.

They were moved for TM3 inspection job last week. All the bolts on the panel are hand tight only now since they will be removed out for camera installation during next stage inspection.

  1228   Wednesday, May 11, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM2Ta#48module moved

TM#2 with Ta#48 has been moved from the south hot cell to the conditioning station.

  1229   Wednesday, May 11, 2016, 13:15 David WangConditioning StationMaintenanceTM2 TCS tank top flange seal is changed this morning

I changed TCS tank top flange seal(o-ring 42.00"ID X 0.275" DIA) this morning before TM2 was moved to TCS.