  1157   Thursday, February 25, 2016, 06:52 David WangConditioning StationStandard Operation  stop CS vacuum pumps.

I stopped the conditioning station vacuum pumps. The CS is still under vacuum without venting.

  1163   Friday, March 04, 2016, 13:58 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall Schedule

Update Schedule according to changes.See attachment1, 2.

 Re-post it after some minor correction See attachment 3,4.

Update schedule according changes. See attachments 5,6

 update schedule according to changes. See attachment 7,8

Attachment 1: 2016_winter_shut_down__target_hall_schedule.mpp
Attachment 2: 2016_winter_shut_down__target_hall_schedule.pdf
2016_winter_shut_down__target_hall_schedule.pdf
Attachment 3: 2016_winter_shut_down__target_hall_schedule.pdf
2016_winter_shut_down__target_hall_schedule.pdf
Attachment 4: 2016_winter_shut_down__target_hall_schedule.mpp
Attachment 5: 2016_winter_shut_down__target_hall_schedule.pdf
2016_winter_shut_down__target_hall_schedule.pdf
Attachment 6: 2016_winter_shut_down__target_hall_schedule.mpp
Attachment 7: 2016_winter_shut_down__target_hall_schedule.pdf
2016_winter_shut_down__target_hall_schedule.pdf
Attachment 8: 2016_winter_shut_down__target_hall_schedule.mpp
  1165   Monday, March 14, 2016, 15:22 David WangConditioning StationStandard OperationTM2 2016 Winter Shut Down Target Hall Schedule

update schedule according to change. See attachment 1,2

 

Attachment 1: 2016_winter_shut_down__target_hall_schedule.pdf
2016_winter_shut_down__target_hall_schedule.pdf
Attachment 2: 2016_winter_shut_down__target_hall_schedule.mpp
  1169   Friday, March 18, 2016, 08:34 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 with no target has been moved to the conditioning station from the south hot cell.

  1170   Friday, March 18, 2016, 09:34 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Sep)

I would like to post the spreadsheet of target hall schedule for beam schedule 130(Apr to Sep) first. The MS project of TH schedule for  beam schedule 130 is under construction, and will be posted later.

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep_2016.xlsx
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
  1171   Friday, March 18, 2016, 09:42 David WangConditioning StationStandard OperationTM2 TM2 vacuum sysytem has been connected at TCS

TM2 vacuum system has been connected at TCS. Started roughing pump. Everything is good so far.

  1173   Friday, March 18, 2016, 13:13 Travis CaveConditioning StationStandard OperationTM2SiC#32Electrical Check

Electrical checks of the TM#2 with the old SiC#32 and without the target. See attached PDFs.

Attachment 1: TM2_SiC32_postbeam.PDF
TM2_SiC32_postbeam.PDF
Attachment 2: TM2_elec_chk_notgt_CS.PDF
TM2_elec_chk_notgt_CS.PDF
  1174   Monday, March 21, 2016, 10:25 David WangConditioning StationRepairTM2 TM2 Helium pressure Test Result in TCS and ITW

TM2 has been helium pressure tested in ITW and TCS. They are both tested with 70psi helium, each circuit for 3minutes. 

The leak detector base leak rate: 0.0X E-9 atm.cc/sec, base pressure 0.0 xE-4 torr  for both ITW and TCS. The test results are:

 

 

 

 

circuit TCS Test Result (atm.cc/sec) 2016-03-021  ITW Test Result (atm.cc/sec) 2016-03-02

TCS Test Result (atm.cc/sec)

2116-11-24

Target Oven + 5.2 X E-9 1.7 X E-8 2.0 X E-9
Target Oven - 5.6 X E-9 8.7 X E-9 2.2 X E-8
Tube Heater + 3.7 X E-8 1.7 X E-8 2.3 X E -8
Tube Heater - 1.9 X E-8 1.5 X E-8 8.2 X E-8
Coil 2 (P-Q) 7.2 X E-8 6.7 X E-8 5.4 X E-9
Coil 1 (R-U) 1.4 X E-8 1.3 X E-8 2.4 X E-9
MSP 2.3 X E-7, SECOND TIME 2.5 X E-7 4 X E-9 2.4 X E-7
HS NO TEST, LINE IS OPEN TO VACUUM. GOOD, NO RESPONSE ON LD Good, 0.0 X E-9
EE 4.3 X E-9 GOOD, NO RESPONSE ON LD

3.7 X E-8

 

window 4.5 X E-9 GOOD, NO RESPONSE ON LD Good , 0.0 X E-9
GE NO TEST, CONFIRMED IN SHC MIDDLE OF E-6 RANGE No test. Blanked
       

 2016-11-24: Checked again and added result into this elog.  No essential change has been found. MSP still has the biggest leak rate. David

  1175   Monday, March 21, 2016, 11:30 David WangConditioning StationRepairTM2 TM2 and TCS vacuum pumps are stopped

I stopped TM2 and TCS vacuum pumps. It will be vented and disconnected this afternoon for tomorrow  moving.   

  1176   Monday, March 21, 2016, 15:27 David WangConditioning StationRepairTM2 TM2 has been disconnected at TCS

TM2 vacuum system has been disconnected at TCS. Venting is in process now.

  1180   Thursday, March 24, 2016, 13:15 David WangConditioning StationStandard OperationTM1 TM1 and TCS vacuum system has been connected

TM1 and TCS vacuum system have been connected. All turbo-pumps are started. The pumping down is fine.

  1181   Thursday, March 24, 2016, 13:55 Travis CaveConditioning StationStandard OperationTM1no targetmodule moved

TM#2 has been moved from the south hot cell to the south west silo and TM#1 was moved from the north east silo to the conditioning station. All done by 10AM.

  1182   Tuesday, March 29, 2016, 08:38 David WangConditioning StationStandard OperationTM1 TM1 water lines helium pressure check at TCS

TM1 water lines helium pressure check at TCS is done. 70 psi helium was applied to water circuits. Leak detector base leak rate 0.0 x E-9 atm.cc/sec, base pressure 0.0 x E-4 torr. The result shows as below:

 

 

Ta+   0.0 X E-9 atm.cc/sec 3minutes stabilizing
Ta-  0.0 X E-9 atm.cc/sec 3minutes stabilizing
Tube-  0.0 X E-9 atm.cc/sec 3minutes stabilizing
Tube+  0.0 X E-9 atm.cc/sec 3minutes stabilizing
MSP   0.0 X E-9 atm.cc/sec 3minutes stabilizing
EE   0.0X E-9 atm.cc/sec 3minutes stabilizing
HS  not tested without caps.  
Window  E-5 range,leak on stem as we knew before.  10seconds to E-5

The results is good so far as we know the window line is leak on stem in service cap. The HS will be tested later with target on.

 The service cap air to vacuum seals also have been checked. The PNG1 panel and side round panel close to shutter are leak. The o-rings on them need to be replaced.

On March 30th -2016, I doubled checked the air to vacuum seal on the TM1 service cap. The side round panel is leak free actually. The PNG1 panel is leak at the bottom side. Confirmed.

On march 31th-2016, The o-ring(1-1/ 2275) on TM1 PNG1 side panel has been replaced today. The o-ring slot and mating surfaces are cleaned, and new  o-ring is installed. The panel is put back to TM1 and all bolts are tightened.

See attachments.

Attachment 1: TM1_PNG1_panel_o-ring_replacement_001.JPG
TM1_PNG1_panel_o-ring_replacement_001.JPG
Attachment 2: TM1_PNG1_panel_o-ring_replacement_002.JPG
TM1_PNG1_panel_o-ring_replacement_002.JPG
Attachment 3: TM1_PNG1_panel_o-ring_replacement_004.JPG
TM1_PNG1_panel_o-ring_replacement_004.JPG
Attachment 4: TM1_PNG1_panel_o-ring_replacement_005.JPG
TM1_PNG1_panel_o-ring_replacement_005.JPG
Attachment 5: TM1_PNG1_panel_o-ring_replacement_006.JPG
TM1_PNG1_panel_o-ring_replacement_006.JPG
  1183   Wednesday, March 30, 2016, 08:40 David WangConditioning StationStandard Operation  2016 Winter Shut Down Target Hall Schedule

update the schedule according to changes.See attachment1, 2.

Attachment 1: 2016_winter_shut_down__target_hall_schedule.pdf
2016_winter_shut_down__target_hall_schedule.pdf
Attachment 2: 2016_winter_shut_down__target_hall_schedule.mpp
  1184   Wednesday, March 30, 2016, 11:00 Travis CaveConditioning StationStandard OperationTM1no targetElectrical Check

The results of the TM#1 electrical check from the 29th of March 2016

Attachment 1: TM1_elec_chk_notgt.PDF
TM1_elec_chk_notgt.PDF
  1187   Friday, April 01, 2016, 13:58 Travis CaveConditioning StationStandard OperationTM1UC#15module moved

TM#1 has been moved from the conditioning station to the south hot cell, had UC#15 installed and then moved back to the conditioning station.

  1188   Friday, April 01, 2016, 14:41 David WangConditioning StationStandard OperationTM1 TM1 and TCS vacuum system has been connected. TCS control page white out.

I can not start the TCS pumps due to control page white out. Control group is working on this issue.

Control group fixed the white out problem. I started all turbo-pumps. The pumping down is good so far. The TM1 IG1 is broken. I will check it on next Monday. It could be a broken filament. Then, the filament will be replaced.

  1189   Monday, April 04, 2016, 11:14 David WangConditioning StationStandard OperationTM1 Helium pressure test on TM1 HS line at CS

New UCx target is installed on the module. 70psi helium,3 minutes. NO response on LD.  LD is pumped to bottom LR and LP during test.

  1190   Tuesday, April 05, 2016, 07:12 David WangConditioning StationStandard OperationTM1UC#15stop CS vacuum pumps.

Stop TCS vacuum pumps . Preparing argon venting on TM1 and TCS.

7:34 AM, Disconnected TM1 at TCS, argon venting now.

  1197   Thursday, April 07, 2016, 09:24 Travis CaveConditioning StationMaintenanceTM4Ta#47module moved

TM#4 has been moved from the south hot cell to the conditioning station.